| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr Quoted ₹1.5 Cr | L1 | Accepted-AOC BID RANK IS L1 |
| 2 | L2₹1.5 Cr+₹30,190 (0.20%)Rejected-Finance 0261K KAUSHALPURAM NAKHA NO 1 JANKI NAGAR BASHARATPUR GORAKHPUR GORAKHPUR UTTAR PRADESH 273004 | GORAKHPUR | UTTAR PRADESH | 273004 | ₹1.5 Cr+₹30,190 (0.20%) | L2 | Rejected-Finance BID RANK IS L2 |
| 3 | L3₹1.8 Cr+₹26.9 L (18.0%)Rejected-Finance 406 KONARK EPITOME NEAR KONARK CAMPUS VIMAN NAGAR PUNE PUNE MAHARASHTRA 411014 | PUNE | MAHARASHTRA | 411014 | ₹1.8 Cr+₹26.9 L (18.0%) | L3 | Rejected-Finance BID RANK IS L3 |
| 4 | L4₹1.9 Cr+₹38.6 L (25.8%)Rejected-Finance | ₹1.9 Cr+₹38.6 L (25.8%) | L4 | Rejected-Finance BID RANK IS L4 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
2 Aug 2022, 5:00 pmClosed
MANAGING DIRECTOR
SUGAR MILL PALWAL
Tender of the Job and Supply work for the re-tubing of both Boilers
2022_HBC_231136_1
TENDER FOR THE MEETING 05-08-2022
Open Tender
Miscellaneous
Supply
60 days
SUGAR MILL PALWAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1 L
1 Sept 2022
20 Jul 2022
3 Aug 2022
20 Jul 2022
2 Aug 2022
20 Jul 2022
Amount
Supply of fabricated both boilers main bank tubes as per Drg. No. HB/PP/148A Site situation with following specification :- Tube O.D. = 63.5 mm, Tube Thick= 3.66 mm, length/ height of one tube approx = 8100 mm. Total No. of tubes 420x2 Boiler Tube Material :- ERW-BS 3059/Part -I/1968 Grade 320
Dismantling , Erection & Commissioning of both boilers above fabricated main bank tubes as per Drg. No. HB/PP/148A /site situation and following specification : O.D.=63.5 mm, Tube thickness= 3.66 mm, length of one tube- approx 8100 mm. Total Tubes =420x2 Boiler.
Supply of fabricated both boiler screen tubes as per Drg. No. HB/PP/148A /site situation with following specification Tube:- O.D. =70 mm, Thickness =3.66 mm, length of one tube approx 10 M, Total Tubes = 25+26 = 51 x 2 Boiler. Tube Material:- ERW-BS-3059/Part-1/1968 Grade 320
Dismantling, Erection & Commissioning of both boilers above fabricated screen tubes as per Drg. No. HB/PP/148A /site situation with following specification : O.D. -70 mm, Thickness =3.66 mm, length of one tube- approx = 10 m. Total Tubes = 51x2 Boiler = 102 Tubes
Supply of fabricated both boiler Roof/Front wall tubes as per Drg. No. HB/PP/148A/Site situation with following specification : - Tube O.D.= 70 mm, thickness =3.66 mm, Height of one tube approx 12 M., No. of Tubes 26x2 Boiler =52 tubes. Tube Material: ERW-BS 3059/Part-I/1968 Grade 320.
Dismantling, Erection & Commissioning of both boilers above fabricated Roof/Front wall tubes as per Drg. No. HB/PP/148A/Site situation with following specification : - Nipple Tube O. D.= 70 mm, thickness =3.66mm, length of one tube approx 12 M, Total of tubes 26x2 Boiler = 52 Tubes.
Supply, Dismantling, Erection & Commissioning of Nipples for above fabricated Roof/Front wall tubes as per Drg. No. HB/PP/148A/Site situation with following specification : - Nipple Tubes O.D. -70 mm, thickness -4.06mm, length of Nipple Approx 7” Total Nos. of Nipples =26x2 Boiler =52 tubes
Supply of fabricated both boilers tubes as per Drg. No. HB/PP/148A /site situation with following specification :- Tube OD -76.2 mm, thickness -4.0 mm, length of one tube approx -7 Mtr. Total tubes: =24x2 boiler =48 tubes Tube Material: ERW-BS-3059/Part-I/1968, Grade-320.
Dismantling, Erection & commissioning of both boilers above fabricated Riser tubes as per Drg. No HB/PP/148A /site situation with following specification :- Tube OD -76.2 mm, thickness -4.06 mm, length of one tube approx -7 Mtr. Total Nipple: =24x2 boiler =48 tubes.
Supply, Dismantling, Erection & commissioning of Nipples for above fabricated riser tubes as per Drg. No. HB/PP/148A /site situation with following specification:- Nipple Tube OD -76.2 mm, thickness -4.06 mm, length of one Nipple approx –7 inch. Total Nipple: =24x2 Boiler =48 Nipple
Supply of fabricated both boiler Down comers tubes as per Drg. No HB/PP/ 148A /site situation with following specification:- Tube OD -76.2 mm, thickness -4.06mm, length of one tube-approx -7 M., Total tubes: =12x2 boiler =24 tubes Tube Material ERW-BS-3059/Part-I/1968, Grade-320.
Supply, Dismantling, Erection & commissioning of both boilers above fabricated down comers Tubes as per Drg. No. HB/PP/148A /site situation with following specification:- Tube OD-76.2 mm, Thickness-4.06 mm, Length of one tube approx 12 mtr. Total Tubes : 12x2 boiler = 24 Tubes.
Supply, Dismantling, Erection & commissioning of Nipples for above fabricated Down comers Tubes as per Drg. No. HB/PP/148A /site situation with following specification:- Nipple Tube OD -76.2 mm, thickness -4.50 mm, length of one Nipple approx -7 inch., Total Nipples: =12x2 boiler =24
Supply of fabricated both boilers Super heater coils as per Drg. No /site situation with following specification:- Tube OD -44.5 mm, thickness - 3.66 mm, length of one Tube approx -25.6 Mtr., Total Coils: 26x2 boiler =52 coils Tube /coil material seamless : BS-3059/Part-1/1968, grade-380
Dismantling, Erection & commissioning of both boilers above fabricated super heater coil as per Drg. No. /site situation with following specification:- Coils /tube OD -44.5 mm, thickness – 3.66 mm, length of one tube approx -25.6 Mtr. Total coils: 25x2 boiler =50 coils
Supply, Dismantling, Erection & commissioning of Nipples for above fabricated super heater coil as per Drg. No /site situation with following specification :- Nipple Coils OD -44.5 mm, thickness -4.06 mm, length of one Nipple 7 inch, Total Nipples: 25x2 boiler =50 coils
Supply of fabricated both boiler Top half Economizer coils as per Drg. No. P-425/10 Site situation with following specification :- Tube /coil O.D. 50.8 mm, Thickness = 4.06 mm, length of one coil approx = 62.7 Mtr., Total coils =20x2 boiler = 42 Coils Tube Material :- Seamless B5/3059/Part-1/1968, Grade -320
Dismantling, Erection & Commissioning of both boilers Top half Economizer coils as per Drg. No. P-425/10/site situation and following specification : Coil O.D.= 50.8 mm, Thickness =4.06 mm, Length of One Coil Approx 62.7 Mtr., Total Coils = 20x2 boiler = 40 Coils
Supply, Dismantling, Erection & Commissioning of Nipples for Top half Economizer coils as per Drg. No. P-425/10/site situation and following specification :- Nipple O.D.= 50.8 mm, Thickness =4.50 mm, Length of One Nipple 7inch, Total Nipple = 20x2 boiler = 40 Nipple
Supply and job work of all refractory Civil work for above re-tubing and baffles work etc. i.e. with fire cement, castable refractory, fire clay, fire bricks and fire blocks etc. for both boilers as per Drg. No. HB/PP/148A/ Site Situation. Note:- All Material and work strictly as per IBR regulations and permission by CIB, Haryana will be in the scope of Party.
S K ENGINEERING WORKS
Privilege Biksons Boilers Pvt. Ltd.
VADODARA INDUSTRIAL SERVICES
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .