Loading…
Loading…
Tender Value
₹84.2 L
EMD Value
₹84,300
Closing Date
31 Jul 2026, 5:00 pm5d left
Superintending Engineer
O/o the SE, Balasore Irrigation Division, Balasore
Construction of Single vent sluice
2026_CEBML_136480_9
e-Procurement Notice No.SEBID 03 of 2026-27
National Competitive Bid
Civil Works - Others
Percentage
120 days
Khaira Bock of Balasore District
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹84,300
Yes
20 Jul 2026
20 Jul 2026
1 Aug 2026
20 Jul 2026
31 Jul 2026
20 Jul 2026
20 Jul 2026 - 27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning and grubbing road land including uprooting rank vegistation, grass, bushes, shrubs, saplings and trees girth upto 300m, removal of stumps of trees cut earlier and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned up to a lead of 1000m including removal of disposal of top organic soil not exceeding 150mm in thickness etc. complete as per direction of the Engineer-in-Charge. | - | One Sqm | 8.6 | - |
| 2 | Earth work in suitable type of soil in borrow area, loading into transportation vehicle manually or mechanically and transportation of earth by mechanical means unloading the same over the approved surface of embankment in proper profile with 5.00Km leads including rough dressing and breaking clods to maximum 5cm to 7cm including removal of roots, bushes other deleterious materials from transported earth with all cost, carriage, royalty, labour cess and laying in layers not exceeding 22.50cm in depth with vibratory roller, hire and running charges of all machineries with all labour, T&P required for the work etc.complete in all respect as per specification and direction of Engineer-in-Charge. | - | One Cum | 328.3 | - |
| 3 | Earth work, loading, unloading and carriage by mechanical means of sand and sandy soil, including stoney earth, gravel and moorum etc. interspread with boulders upto 1/2cum size with all leads, lifts and delifts including trimming of bank slopes and bed to design section and depositing excavated materials away from the work site by mechanical means with an initial lead of 1.00Km, cess etc complete as per direction of the Engineer-in-Charge. | 0.8 | One Cum | 96.9 | ₹77.52 |
| 4 | Random rubble stone masonary in sand grouted in foundation and plinth free from weathered skinned and other deleterious materials using 30cm size hard granite stone including hoisting and laying stone and curing for required days including all labours T&P, cost, conveyance, royalty all applicable taxes and all incidental charges required to complete the work etc. complete as per direction of Engineer-in-charge. | 0.4 | One Cum | 4,052.2 | ₹1,620.88 |
| 5 | Providing C.C. M-15 and 40mm down graded black hard granite (crusher broken) stone chips of approved quality mixing by concrete mixure and placing manually, compacting with vibrator including hire and running charges of mixure, vibrator with cost, conveyance, royalty of all materials, labour charges and materials complete as per direction of the Engineer-in-Charge. | 0.4 | One Cum | 6,006.4 | ₹2,402.56 |
| 6 | RCC work of M25 grade with 20mm down graded crusher broken black hard granite stone chips including cost, conveyance and royalty including watering and curing etc. complete as per direction of the Engineer-in-Charge. | 0.6 | One Cum | 7,174.3 | ₹4,297.41 |
| 7 | Providing P.C.C. M-20 and 20mm down graded black hard granite (crusher broken) stone chips of approved quality mixing by concrete mixure and placing manually, compacting with vibrator including hire and running charges of mixure, vibrator with cost, conveyance, royalty of all materials, labour charges and materials complete as per direction of the Engineer-in-Charge. | 0.2 | One Cum | 6,774.5 | ₹1,348.13 |
| 8 | Providing cast-in-situ 940mm dia double under reamed RCC Pile of 375mm dia boared compaction pile driving to a depth of 9.00m from bottom level with RCC M25 (1:1:2) using 20mm size nominal size crusher broken black hard granite chips including cost of bore holes but excluding cost of MS Rod/Tar steel and labour charges for cutting, bending and binding steel as per the direction of Engineer-in-Charge. | - | One No. | 12,414 | - |
| 9 | Providing formwork for concrete with F1 finish for upstream faces of dam, spillway, glacis of barrages, unexposed surfaces of foundation, block joints etc. with steel shutters rigidity fixed and removal of forms and making good to the surfaces where necessary complete with all labour, materials and T&P complete as per direction of teh Engineer-in-Charge. | 0.2 | One Sqm | 913.4 | ₹181.77 |
| 10 | Filling foundation and plinth with excavated earth including watering and ramming and compaction etc. all complete as per direction of Engineer-in-Charge. | - | One Cum | 53.8 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
TechBIDSEBID_10.pdf
Tender Documents • 1.48 MB
BOQ_602387.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].