Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Finance | -5.11% | ₹3.7 L | L1 | Admitted-Finance |
| 2 | L2₹3.9 L+₹19,816.44 (5.40%)Admitted-Finance | +0.01% | ₹3.9 L+₹19,816.44 (5.40%) | L2 | Admitted-Finance |
| 3 | L3₹4.0 L+₹29,453.74 (8.02%)Admitted-Finance | +2.50% | ₹4.0 L+₹29,453.74 (8.02%) | L3 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,740
Closing Date
11 Jul 2026, 2:00 pmClosed
Pankaj Garg Executive Engineer
PWD Electrical Division Medical College Jaipur
Air Conditioning Repairing work in Poly Trauma ICU at SMS Hospital, Jaipur
2026_CEPWD_572719_1
EE_PWD_Medical_NIT_12_2026_27
Open Tender
Electrical Works
Percentage
60 days
SMS Hospital
Please refer tender documents
2 documents required · 2 mandatory
₹500
Through Egras Challan in Office ID 28560
₹7,740
Yes
In the Chamber of Executive Engineer
17 Jul 2026
3 Jul 2026
13 Jul 2026
3 Jul 2026
11 Jul 2026
3 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Supply, installation, Testing & commissioning of VRV/VRF compatible OEM make AHU KIT' including expansion valve and controller for connecting AHU with VRF complete as required.. | 2 | Each | 46,405 | ₹92,810 |
| 1.02 | Supplying and installation of high-pressure grade required size OEM make copper connection Y or T Joints / refnet for liquid and suction line , complete erected on wall/ceiling with supports/raceways, Nitrile rubber insulation, painting etc. with brazing and testing for leakages confirming the normal operation of the VRV / VRF air conditioning system complete as required. | 2 | Each | 5,830 | ₹11,660 |
| 1.03 | Gas charging of VRF/VRV system with R410A refrigerant gas. Before gas charging system shall be flushed with high purity Nitrogen Gas to remove carbon content, dirt particles to make sure that there is no chance of mixing any impurity with Refrigerant Gas. Thereafter System shall be tested with Nitrogen Gas at 1.5 Times of working pressure of R410 Refrigerant Gas to ensure leakproof system. Whole system shall be Vacuumed up to 500-micron level which ensures the zero-moisture content level in piping to ensure better cooling efficiency and long life of the system. | 49 | per Kg | 1,428 | ₹69,972 |
| 1.04 | SITC of AHU temperature controller including making connections etc. as required. | 3 | Each | 5,223 | ₹15,669 |
| 1.05 | Providing & Fixing of AC operated heavy duty 230 /440 Volt power contactor confirming to IS/IEC 60947-4-1 : 2000 having provision of mechanical interlocking, auxilary contacts, Din rail mounting type including making connections, testing etc. as required. | - | - | - | - |
| 1.06 | 4 pole Power contactors with following AC 1 Rating | - | - | - | - |
| 1.07 | 63 Amp | 3 | Each | 4,300 | ₹12,900 |
| 1.08 | Replacement of defective compressor by company repaired compressor as per OEM recommendations of following gadgets including testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. | - | - | - | - |
| 1.09 | 4.0 TR A.C. | 3 | Each | 41,663 | ₹1,24,989 |
| 1.1 | GST @18% | 1 | Each | 59,040 | ₹59,040 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Tendernotice_2.pdf
PDF • 3.10 MB
BOQ_1018763.xls
BOQ • 0.34 MB
Cover1.pdf
Tender Documents • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .