| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.6 LAccepted-AOC | ₹10.6 L | 1 | Accepted-AOC L 1 |
| 2 | 2₹11.2 L+₹62,510 (5.89%)Rejected-AOC | ₹11.2 L+₹62,510 (5.89%) | 2 | Rejected-AOC L 2 |
| 3 | 3₹11.9 L+₹1.3 L (12.3%)Rejected-AOC | ₹11.9 L+₹1.3 L (12.3%) | 3 | Rejected-AOC L 3 |
| 4 | 4₹11.9 L+₹1.3 L (12.6%)Rejected-AOC | ₹11.9 L+₹1.3 L (12.6%) | 4 | Rejected-AOC L 4 |
| 5 | 5₹13.7 L+₹3.1 L (29.4%)Rejected-AOC VILLAGE GOBINDAPUR POST SONHA DISTRICT BASTI | BASTI | UTTAR PRADESH | ₹13.7 L+₹3.1 L (29.4%) | 5 | Rejected-AOC L 5 |
| Sl No | Description | Qty | Unit | M/S JANARDAN PATHAK THEKEDAR L6 | M/S MAHENDRA PRATAP SINGH CONTRACTOR L1 | M/S BALA JI ENTERPRISES L5 | M/S AMIT KUMAR SINGH L3 | M/S INDRAWATI CONSTRATION L4 | Shiv Ram Yadav L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavaction for making slope for cutters in all type of soil with proper disposal of earth as per direction of Engineer -in- charge. etc. M3 | 1,050 | M³ | 56 ₹58,800 | 50 ₹52,500 | 36.8 ₹38,640 | 65 ₹68,250 | 80 ₹84,000 | 15 ₹15,750 Lowest |
| 2.00 | Supply,carriage and laying/dumping of HDPE Woven bag filled with RBM in Nylon Crate size 1x1x1 M , mesh size 20x20 Cm including all cost of material, labour and T&P etc. M3 | 520 | M³ | 800 ₹4,16,000 | 70 ₹36,400 Lowest | 552 ₹2,87,040 | 537 ₹2,79,240 | 200 ₹1,04,000 | 720 ₹3,74,400 |
| 3.00 | Supply and laying PP gabion rope size 1.80x1.80x0.50 m and mesh size 15x15 cm filled with earth/local sand in Geo bag of size 1.00 x0.75 m including all cost of material , labour, carrige and T&P etc complete as per dirrection of engineer incharge.:- M³ | 178 | No. | 2,700 ₹4,80,600 | 930 ₹1,65,540 Lowest | 1,380 ₹2,45,640 | 2,200 ₹3,91,600 | 2,300 ₹4,09,400 | 1,700 ₹3,02,600 |
| 4.00 | Supply and laying Geo textile sheet 200 gsm. below Geo bag pitching including all cost of material , labour, carrige and T&P etc complete as per dirrection of engineer incharge.:- M³ | 720 | M2 | 100 ₹72,000 | 630 ₹4,53,600 | 128.8 ₹92,736 | 105 ₹75,600 | 126 ₹90,720 | 95 ₹68,400 Lowest |
| 5.00 | Supplying and Laying Geo Bag 1.00 x 0.75 m filled with earth/ local sand over Geo Tetile sheet for making cutter etc. including all cost of material , labour, carrige and T&P etc complete as per dirrection of engineer incharge.:- M³ | 640 | M2 | 400 ₹2,56,000 | 430 ₹2,75,200 | 920 ₹5,88,800 | 350 ₹2,24,000 | 513.6 ₹3,28,704 | 300 ₹1,92,000 Lowest |
| 6.00 | Filling R.C.C porcupine set with jhakhar including all labour, jhakhar and T&P etc complete of work including cost jhakhar, labour, carrige and T&P etc complete as per dirrection of engineer incharg , but excluding cost of porcupine and its placing etc.- set | 20 | Set | 700 ₹14,000 | 400 ₹8,000 | 276 ₹5,520 Lowest | 650 ₹13,000 | 885.25 ₹17,705 | 530 ₹10,600 |
| 7.00 | Supply and laying/dumping R.C.C porcupine set size (3.0x0.10x0.10)M filling with jhakhar including all labour, jhakhar and T&P etc complete of work etc.including all cost of material , labour, carriage and T&P etc complete as per dirrection of engineer incharg- set | 20 | Set | 7,500 ₹1,50,000 | 3,500 ₹70,000 Lowest | 5,750 ₹1,15,000 | 7,000 ₹1,40,000 | 8,000 ₹1,60,000 | 8,000 ₹1,60,000 |
Tender Value
Refer Docs
EMD Value
₹36,000
Closing Date
13 Jun 2026, 12:00 pmClosed
Executive Engineer,
Executive Engineer, Flood Work Division-1st, Basti, Uttar Pradesh
Lot-03
2026_UPIDC_1157881_3
01/EE/2026-27
Open Tender
Civil Works
Item Wise
7 days
Basti
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹36,000
4 Aug 2026
8 Jun 2026
13 Jun 2026
8 Jun 2026
13 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavaction for making slope for cutters in all type of soil with proper disposal of earth as per direction of Engineer -in- charge. etc. M3 | 1,050 | M³ | - | - |
| 2 | Supply,carriage and laying/dumping of HDPE Woven bag filled with RBM in Nylon Crate size 1x1x1 M , mesh size 20x20 Cm including all cost of material, labour and T&P etc. M3 | 520 | M³ | - | - |
| 3 | Supply and laying PP gabion rope size 1.80x1.80x0.50 m and mesh size 15x15 cm filled with earth/local sand in Geo bag of size 1.00 x0.75 m including all cost of material , labour, carrige and T&P etc complete as per dirrection of engineer incharge.:- M³ | 178 | No. | - | - |
| 4 | Supply and laying Geo textile sheet 200 gsm. below Geo bag pitching including all cost of material , labour, carrige and T&P etc complete as per dirrection of engineer incharge.:- M³ | 720 | M2 | - | - |
| 5 | Supplying and Laying Geo Bag 1.00 x 0.75 m filled with earth/ local sand over Geo Tetile sheet for making cutter etc. including all cost of material , labour, carrige and T&P etc complete as per dirrection of engineer incharge.:- M³ | 640 | M2 | - | - |
| 6 | Filling R.C.C porcupine set with jhakhar including all labour, jhakhar and T&P etc complete of work including cost jhakhar, labour, carrige and T&P etc complete as per dirrection of engineer incharg , but excluding cost of porcupine and its placing etc.- set | 20 | Set | - | - |
| 7 | Supply and laying/dumping R.C.C porcupine set size (3.0x0.10x0.10)M filling with jhakhar including all labour, jhakhar and T&P etc complete of work etc.including all cost of material , labour, carriage and T&P etc complete as per dirrection of engineer incharg- set | 20 | Set | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.07 MB
Lot-03.pdf
Tender Documents • 1.60 MB
BOQ_2170007.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .