Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.3 L+₹17,231.20 (8.16%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.4 L+₹33,029.34 (15.6%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,740
Closing Date
16 Jun 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Const of Public Bathroom at Ward No 9 Village Panjowa Pyt Sagoon Block Nagrota AC Nagrota, 2nd Call
2026_RDPR_311930_2
e-NIT No. 67 REWJ of 2026-27 dated 09-06-2026
Open Tender
Civil Works
Percentage
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,740
Yes
19 Jun 2026
9 Jun 2026
17 Jun 2026
9 Jun 2026
16 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in trenches for foundation, drain, pipes, cables etc ( not exceeding 1.5 m in width ) and for shafts, wells. Cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 m inciuding disposal of excavated earth in: All kind of soil | 9.66 | cum | 479.3 | ₹4,630.04 |
| 2 | P/Laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 1.51 | cum | 4,826.5 | ₹7,288.02 |
| 3 | P/Laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 8.01 | cum | 5,733.6 | ₹45,926.14 |
| 4 | P/Laying reinforced cement conc. 1:1.5:3 Of specified grade in RCCwork excluding the cost of form work, cement using 20mm N/ size of agg. | 1.8 | cum | 9,821.85 | ₹17,679.33 |
| 5 | Brick work with brick of class designation 75 in foundation and plinth in cement mortar 1:4 | 6.33 | cum | 7,571.55 | ₹47,927.91 |
| 6 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 6.33 | cum | 1,455.65 | ₹9,214.26 |
| 7 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm
angle iron and 3mm M.S. gusset plates at the junctions and corners, all
necessary fittings complete, including applying a priming coat of approved
steel primer.
10.5.1 Using M.S. angles 40x40x6mm for diagonal braces
10.5.2 Using flats 30x6mm for diagonal braces and central cross piece. | 3.02 | sqm | 5,493.9 | ₹16,591.58 |
| 8 | Centring and shuttring and propping atc(B.G.L) | 30.81 | sqm | 286.35 | ₹8,822.44 |
| 9 | slab | 13.94 | sqm | 718.2 | ₹10,011.71 |
| 10 | Reinforcement for RCC work including straightening , cutting, bending, placing in position and binding all complete | 144.21 | kg | 123.2 | ₹17,766.67 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
BOQ_1009832.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .