Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC MEENATCHIPURAM NATHAM | ₹11.9 L Quoted ₹11.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹11.8 LRejected-Finance | ₹11.8 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | T SELVAMANI L2 | Om Muruga Builders L1 |
|---|---|---|---|---|---|
| 1.001. Construction of Drainage from AP Balu house to Prakash house at Pudhukottai, H/O Reddiyapatti ESTIMATE AMOUNT : RS. 11.90 LAKHS | |||||
| 2.00 | Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B (0.0 - 0.30m) | 157.5 | CUM | 200 ₹31,500 | 190 ₹29,925 |
| 3.00 | Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc, | 26.25 | CUM | 5,370 ₹1.4 L | 5,369.15 ₹1.4 L |
| 4.00 | Supplying and erecting centering for all cc works including necessary supports and all labour charges | 521.57 | SQM | 550 ₹2.9 L | 547.5 ₹2.9 L |
| 5.00 | Cemant Concrete 1:3:6 using 20mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc, | 75.6 | CUM | 6,123.78 ₹4.6 L | 6,123.78 ₹4.6 L |
| 6.00 | Supplying, fabricating and placing in position mild steel or ribbed to steel and all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc. complete. | 0.16 | MT | 91,924.74 ₹14,707.96 | 91,924.74 ₹14,707.96 |
| 7.00 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance all materials to site including cost of cement &labour charges &all other incidental charges ec complete. | 3.62 | CUM | 9,108.66 ₹32,973.35 | 9,108.66 ₹32,973.35 |
| 8.00 | Plastering Cm 1:5 to 12mm tk including cost and conveyance all materials to site including cost of cement &labour charges &all other incidental charges ec complete. | 94.5 | SQM | 285 ₹26,932.50 | 282.84 ₹26,728.38 |
| 9.00 | Provision for Name Board | 1 | NO | 4,500 ₹4,500 | 4,500 ₹4,500 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,80,252 ₹1.8 L | 1,79,693 ₹1.8 L |
Tender Value
₹11.9 L
EMD Value
₹12,000
Closing Date
5 Feb 2026, 3:00 pmClosed
Block Development Officer (BP), Natham
Block Development Office, Natham
Construction of Drainage from AP Balu house to Prakash house at Pudhukottai, H/O Reddiyapatti
2026_RDTN_647850_1
TN-05-138-15thFINANCE-2025-26
Open Tender
Civil Works
Natham
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,000
Yes
Block Development Office, Natham
12 Feb 2026
28 Jan 2026
5 Feb 2026
28 Jan 2026
5 Feb 2026
28 Jan 2026
30 Jan 2026
1. Construction of Drainage from AP Balu house to Prakash house at Pudhukottai, H/O Reddiyapatti ESTIMATE AMOUNT : RS. 11.90 LAKHS
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B (0.0 - 0.30m)
Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc,
Supplying and erecting centering for all cc works including necessary supports and all labour charges
Cemant Concrete 1:3:6 using 20mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc,
Supplying, fabricating and placing in position mild steel or ribbed to steel and all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc. complete.
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance all materials to site including cost of cement &labour charges &all other incidental charges ec complete.
Plastering Cm 1:5 to 12mm tk including cost and conveyance all materials to site including cost of cement &labour charges &all other incidental charges ec complete.
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_776693.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid