| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹47.7 CrAdmitted-Finance | -25.81% | ₹47.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹52.7 CrAdmitted-Finance | -18.09% | ₹52.7 Cr | L2 | Admitted-Finance |
| 3 | L3₹55.2 CrAdmitted-Finance | -14.13% | ₹55.2 Cr | L3 | Admitted-Finance |
| 4 | L4₹61.0 CrAdmitted-Finance | -5.11% | ₹61.0 Cr | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical 1. As per NIT clause 8 c i The bidder must have a positive net worth in the immediate last financial year. Further, Net worth of all the partner in a JV should individually be positive. But Positive Net worth Certificate submitted by JV Partner as on |
Updated dates
Tender Value
₹64.3 Cr
EMD Value
₹64.3 L
Closing Date
2 Jan 2026, 3:30 pmClosed
S.E.
Office of the SE CC UPJN(U) NH- 28 Paidleyganj Gorakhpur
Construction of RCC Over Head Tank 1200KL- 2nos., 1500KL and 1700KL, Pump house, MCS Room, Booster Pump room, Boundary wall, staff quarter, gate, Site development and repairing of existing Over Head Tank 600KL and 1250 KL etc
2025_UPJNM_1099039_1
1363/v15/202 Dated 11/12/2025
Open Tender
Water Supply
548 days
NPP Maharajganj Distt- maharajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹23,600
EECD UPJN(U) Deoria
₹64.3 L
Office of the SE CC UPJN(U) Gorakhpur
16 Mar 2026
15 Dec 2025
2 Jan 2026
15 Dec 2025
2 Jan 2026
15 Dec 2025
15 Dec 2025 - 22 Dec 2025
22 Dec 2025
Earth work in ordinary soil, loam, clay or sand with lift upto 1.50M and lead upto 50m, filling watering and ramming of excavated earth into the trenches and disposal of surplus earth upto 50M.
RCC with cement, coarse sand and 20mm gauge stone ballast in proportion of 1:1.5:3 for thrust block of pipeline excluding supply of reinforcement and its bending but including its fixing and binding wire in proportion, necessary centering and shuttering including curing and supply of all materials, labours T&P etc. required for proportion completion of work.
Mild steel or iron work in RCC work wrought to required shape as necessary including bending for proper completion of work.
Bituminous Road
IL Road
Bituminous Road
IL Road
In ordinary soil Clay / Silt.
Scour Valve 80mm dia
Fire Hydrant 80mm Dia
Air Valve 20mm Dia
Supply of all types of materials and construct following chambers as per type design with supply of all labour, T&P etc. completed.
S.V. Chamber (Surface Box Type)
S.V. Chamber (Masonary Type)
Air Valve Chamber
Fire Hydrant Chamber
Making ferrule connection in Pipe Line with fixing of saddle piece, service connections, fittings, and fixing of G.M. ferrule of 15 mm size including tapping the main. Exclude the cost of excavation and subsequent backfill of trenchs and cost of fittings and specials
Shifting of Existing house connection with ferrule connection in Pipe Line in new distribution mains with fixing of saddle piece, service connections, fittings, and fixing of G.M. ferrule of 15 mm size including tapping the main. Exclude the cost of excavation and subsequent backfill of trenchs and cost of fittings and specials
Provision for crossing of nalas, road, culvert and embankments (bundhas) etc. including shifting of telephone cables etc.along the alignement of pipe line including supply of MS pipes and specials,and their laying and jointing testing etc.complete .
Crossing of Culvert approx 3M
Supply all materials labout tools and plant and Horizontal directional drilling machine laying and jointing by electric welding of following MS casing pipe by trenchless with water jetting system.
200 mm Dia
150 mm Dia
Leakage repair work during laying pipeline including supply of all materials, labour T&P etc. complete.
Dismantling of road including supply of labour, materials, T&P etc. required for proper completion of work.
Bituminous Road
C.C. Road
BOE Road
Interlocking road
Reinstatement of following types of roads with old & new materials including supply of labour, materials, T&P etc. Required for proper completion of work.
Bituminous Road
C.C. Road
BOE Road
Interlocking road
Boundry wall, Approach Road and Gate
Dismantling of Existing damaged boundary wall ncluding supply of all materials, labour T&P etc. complete.
Construction of Boundary wall of First class Brick work in 1:4 superstructure (Cement and Coarse sand) including necessary cutting and moulding of brick as required.
12mm thick plaster with cement and coarse sand mortar in 1:4 over brick work including supply of all materials, labour T&P etc. complete.
Scraping of Old white or color washing ncluding supply of all materials, labour T&P etc. complete.
Finishing of wall with water proof cement paint of approved make and quality over one priming coat on new work with two coats to give and even ncluding supply of all materials, labour T&P etc. complete.
Painting or varnishing of iron or wood with one coat of priming and two coats of approved paint & varnish including supply of all materials, labor, T & P
Construction & Completion pump house cum chlorinating room of size ( 3.60 M x 3.0 M x 3.0 M / 2.50 M x 1.80 M x 3.0 M) with stilling chamber for tube well and bye pass chamber, including surveying, soil testing & investigation , architectural and structural design and drawings according to the seismic zone as per indicative drawing and supply of all materials , labour,T&Petc and complete required for proper completion of work.
Supply and fixing of 3.6 M wide gate and 1.20M wide MS wicket gate including fabrication and supply of steel and construction of boundary pillars etc. complete.ncluding supply of all materials, labour T&P etc. complete.
Supply and fixing of 1.20M wide MS wicket gate including fabrication and supply of steel and construction of boundary pillars etc. complete.ncluding supply of all materials, labour T&P etc. complete.
SITC of 1200 LPM, 60 m head 30 H.P. submersible pump set with 24 meter column pipe(150mm dia) assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
Provide all materials, labour, T&P etc. required for proper completion of works and construct coloured PCC interlocking approach road.
Filling of earth at lower portion including leveling and dressing at water works. including supply of all materials, labour, tools and plants etc. complete.
Provision for arboriculture for development of water works. including supply of all materials, labour, tools and plants etc. complete.
SCADA/MCS BUILDING
Construction of Boundary wall alround water works compound and Tubewell complete including surveying, soil testing & investigation , architectural and structural design and drawings according to the seismic zone as per indicative drawing and supply of all materials , labour,T&Petc and complete required for proper completion of work.
BOOSTER PUMP ROOM
Construct a SCADA/MCS Building as per department type design or as per engineer-in-charge. Including surveying, soil testing & investigation , architectural and structural design and drawings according to the seismic zone as per indicative drawing and supply of all materials , labour,T&Petc and complete required for proper completion of work.
PROPOSED STAFF QURATER
construction & Completion of Pumproom for Booster pump installation (3 Mx2.5 M = 7.5 Sqm)Including surveying, soil testing & investigation , architectural and structural design and drawings according to the seismic zone as per indicative drawing and supply of all materials , labour,T&Petc and complete required for proper completion of work.
A Set of Single room Staff Quarter Z-3
A Set of Single room Staff Quarter Z-4
A Set of Single room Staff Quarter Z-5
A Set of Single room Staff Quarter Z-6
REPAIRING OF EXISTING STAFF QUARTER/PLASTERING AND PAINTING WORKS.
Supply all materials, tool & plants etc. for repairing work of existing staff quarter including plastering/ painting work and repairing and replacement of doors/windows etc. as per engineer-in-charge
A Set of Single room Staff Quarter Z-1
A Set of Single room Staff Quarter Z-2
GROUND WATER RECHARGE
Supply all materials, tool & plants etc. for providing of Ground water recharge arrangement at water works campus.
Zone-1 Existing Tubewell
SITC of 1000 LPM, 50 m head 20 H.P. submersible pump set with 24 meter column pipe assembly, (100mm) NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
3M long heavy duty column pipe same as above (Extra/Spare)
SCADA Compatable chlorinating system
40 KVA Servo Voltage stabilizer.
Misc item such as protection ring, MCCB, Transformer oil, electric resistance, rubber sheet, 25 sqmm ormad cable and construction of canopy as per site requirement for protection of electronic device and safety purpose.
Trial & Testing
CE/UL Certified Intelligent Smart Energy Meter
Motor operated Actuator for with Sluice Valve of size upto 100 mm
Soft Stater with RS485Port- 400 V Class,
Auto Phase reversal unit with inbuilt time delay & enclosure (confirm to IEC: 60947-1 & IEC:60947-b-1
CE/UL Certified Hydrostatic type sub soil Water Level Transmiter for Tubewell
CE/UL Certified Pressure Transmiter .
Complete Cabling for Tubewell including all power & control cables of the equipment at pumphouse and OHT
SCADA Automation of Pumping Plant
CE & UL Certified PLC/RTU in IP 54 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification.
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display & control of process parameters.
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
CE/UL Certified Electromagnetic flow meter of 100mm dia
Instrumentation of OHT DMA-1
CE/UL Certified Radar type level Transmitter for OHT
Flow control Valve 250 mm size
Motor operated Actuator with Sluice valve 250mm Size
Electromagnetic Flowmeter of 250mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Cost of Booster pump
Provision of suitable booster system for differential head of 5 Mtr. Kindly noted we have consider higher diffrential head of 7 Mtr. For following duties as applicable for year 2040. Lean- 20.16 m3/h. Average- 51.25 m3/h. Peak- 128.23 m3/h. Note:- All 4 No pumps will be working and 1 No pump will be given as store stand by. Each pump will be coupled with 1.1 KW motor (IE3) along with VFD for each pump.
Accumulator tank/system.
3 Month Trial & Run
Zone-1 New Tubewell-4
CONSTRUCTION OF TUBEWELL
Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c.
Drilling of 600/500 mm dia bore hole by DC Rig m/c complete with all required material, labour & T&P etc. complete.
600 mm dia Drilling from 0 to 60 M BGL
500 mm dia Drilling from 61 to 100 M BGL
500 mm dia Drilling from 101 to 200 M BGL
Logging of bore hole by departmental/approved electric logger.
TUBEWELL ASSEMBLY
M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & as per typed design complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia
200mm dia
LOWERING OF ASSEMBLY
Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia size Assembly from 0 to 54 M BGL
200 mm dia size Assembly from 55 to 100 M BGL
200 mm dia size Assembly from 101 to 180 M BGL
PEA-GRAVEL
Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened and properly Stacked at Site.
DEVELOPMENT OF TUBEWELL
By Air Compressor
Transportation, Erection & Dismantling of 250 PSI Air Compressor.
Development of T.W. by 250 PSI Air Compressor with all required material, labour, T&P etc.
By O.P. Unit
Transportation, Erection & Dismantling of 3 Cusec O.P. Unit and Yield Test.
Development of T.W. by 3 Cusec O.P. Unit with all required material, labour, T&P etc.
Yield test of tubewell along with chemical and bacteriological analysis of tubewell's water.
Pumping plant and other instrumentation work
SITC of 1000 LPM, 50 m head 20 H.P. submersible pump set with 24 meter column pipe assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
SCADA Compatable chlorinating system
3M long heavy duty column pipe same as above (Extra/Spare)
40 KVA Ser
vo Voltage stabilizer.
Trial & Testing
CE/UL Certified Intelligent Smart Energy Meter
Motor operated Actuator for with Sluice Valve of size upto 100 mm
Misc item such as protection ring, MCCB, Transformer oil, electric resistance, rubber sheet, 25 sqmm ormad cable
Auto Phase reversal unit with inbuilt time delay & enclosure (confirm to IEC: 60947-1 & IEC:60947-b-1
CE/UL Certified Hydrostatic type sub soil Water Level Transmiter for Tubewell
CE/UL Certified Pressure Transmiter .
Complete Cabling for Tubewell including all power & control cables of the equipment at pumphouse and OHT
SCADA Automation of Pumping Plant
CE & UL Certified PLC/RTU in IP 54 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification.
Soft Stater with RS485Port- 400 V Class, 15 kw
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display & control of process parameters.
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
CE/UL certified electromagnatics flow meter of 100 mm dia
MCS(Master Control Station)
SCADA DISPLAY
CE/UL & BIS Certified industrial grade LED MONITOR with latest configuration as per specification.
(i) 65'' LED MONITOR With latest configuration
CE/UL/&BIS certified industrial grade large video screen(LVS)with latest configuration of LED type LFD ad per specificatio, MATRIX of 55'' each panel.
(I)2x2 Matrix (4 panel)
Video wall media player of same OEM.
Desktop/PC with i5/i7 prosessor for as per spec mentioned in technical bid document.
CE/UL Cerfified 5 KVA UPS with batteries as per spec mentioned in technical bid document.
Full development version of reqrired TAGS SCADA Software with counstomization of software for MCS as per requirement as per spec mentioned in technical bid documents.
CE/UL certified master control room PLC with redundant CPU & power supply at MCS in IP54 enclouser as spec mentioned in technical bid documents.
EC/UL certified Field gateway agent for transfering data from MCS to Central control room.
GSM based wireless/Broadband/Equipment communication system for PLC capable to tranfer & received data & gather data from remote sited to control station, All accessoried included signal enhancer antenna along with running expences till DLP.
CE/UL Certified Firewall for network protection.
SURGE PROTECTOR FOR ETHERNET communication protection.
CE/UL certified industrial grade Ethernedt Switch
Mobile App Facility system architecture (industries internet baded & viewed through mobile apps for increased local & Remote Visibility).
Canon/HP or eqrivalent Laser Printe 1018 or equivement.
Security Surveillance IP camera with recorded (optional).
Installation, Commissioning & testing inclidung required funiture, A/c etc.
Trial run for 3 month period.
Trial & Run for 3 Months
SITC of 1000 LPM, 50 m head 20 H.P. submersible pump set with 24 meter column pipe assembly, (100mm) NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
3M long heavy duty column pipe same as above (Extra/Spare)
SCADA Compatable chlorinating system
40 KVA Servo Voltage stabilizer.
Misc item such as protection ring, MCCB, Transformer oil, electric resistance, rubber sheet, 25 sqmm ormad cable and construction of canopy as per site requirement for protection of electronic device and safety purpose.
Trial & Testing
CE/UL Certified Intelligent Smart Energy Meter
Motor operated Actuator for with Sluice Valve of size upto 100 mm
Soft Stater with RS485Port- 400 V Class,
Auto Phase reversal unit with inbuilt time delay & enclosure (confirm to IEC: 60947-1 & IEC:60947-b-1
CE/UL Certified Hydrostatic type sub soil Water Level Transmiter for Tubewell
CE/UL Certified Pressure Transmiter .
Complete Cabling for Tubewell including all power & control cables of the equipment at pumphouse and OHT
SCADA Automation of Pumping Plant
CE & UL Certified PLC/RTU in IP 54 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification.
Zone-2 Existing Tubewell-2
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display & control of process parameters.
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
CE/UL Certified Electromagnetic flow meter of 100mm dia
Instrumentation of OHT DMA-1
CE/UL Certified Radar type level Transmitter for OHT
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
Flow control Valve 400 mm size
Motor operated Actuator with Sluice valve 400 mm Size
CE / UL certified Pressure Transmitter
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Cost of Booster pump
Provision of suitable booster system for differential head of 5 Mtr. Kindly noted we have consider higher diffrential head of 7 Mtr. For following duties as applicable for year 2040. Lean- 20.16 m3/h. Average- 51.25 m3/h. Peak- 128.23 m3/h. Note:- All 4 No pumps will be working and 1 No pump will be given as store stand by. Each pump will be coupled with 1.1 KW motor (IE3) along with VFD for each pump.
Accumulator tank/system.
3 Month Trial & Run
Electromagnetic Flowmeter of 400mm Size
Zone-2 Existing Tubewell-3
SCADA Compatable chlorinating system
3M long heavy duty column pipe same as above (Extra/Spare)
SITC of 800 LPM, 50 m head 15 H.P. submersible pump set with 24 meter column pipe assembly, (100mm) NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
Misc item such as protection ring, MCCB, Transformer oil, electric resistance, rubber sheet, 25 sqmm ormad cable and construction of canopy as per site requirement for protection of electronic device and safety purpose.
Trial & Testing
CE/UL Certified Intelligent Smart Energy Meter
Motor operated Actuator for with Sluice Valve of size upto 100 mm
Soft Stater with RS485Port- 400 V Class,
Auto Phase reversal unit with inbuilt time delay & enclosure (confirm to IEC: 60947-1 & IEC:60947-b-1
CE/UL Certified Hydrostatic type sub soil Water Level Transmiter for Tubewell
CE/UL Certified Pressure Transmiter .
Complete Cabling for Tubewell including all power & control cables of the equipment at pumphouse and OHT
SCADA Automation of Pumping Plant
CE & UL Certified PLC/RTU in IP 54 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification.
Zone-2 Existing Tubewell-2
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display & control of process parameters.
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
CE/UL Certified Electromagnetic flow meter of 100mm dia
3 Month Trial & Run
25 KVA Servo Voltage stabilizer.
CONSTRUCTION OF TUBEWELL
Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c.
Drilling of 600/500 mm dia bore hole by DC Rig m/c complete with all required material, labour & T&P etc. complete.
600 mm dia Drilling from 0 to 60 M BGL
500 mm dia Drilling from 61 to 100 M BGL
500 mm dia Drilling from 101 to 200 M BGL
Logging of bore hole by departmental/approved electric logger.
TUBEWELL ASSEMBLY
Zone-3 New Tubewell-5,6 & 7
300 mm dia
200mm dia
LOWERING OF ASSEMBLY
Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia size Assembly from 0 to 54 M BGL
200 mm dia size Assembly from 55 to 100 M BGL
200 mm dia size Assembly from 101 to 180 M BGL
PEA-GRAVEL
Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened and properly Stacked at Site.
DEVELOPMENT OF TUBEWELL
By Air Compressor
Transportation, Erection & Dismantling of 250 PSI Air Compressor.
Development of T.W. by 250 PSI Air Compressor with all required material, labour, T&P etc.
By O.P. Unit
Transportation, Erection & Dismantling of 3 Cusec O.P. Unit and Yield Test.
Development of T.W. by 3 Cusec O.P. Unit with all required material, labour, T&P etc.
Yield test of tubewell along with chemical and bacteriological analysis of tubewell's water.
Pumping plant and other instrumentation work
M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structure etc. as required & as per typed design complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
SCADA Compatable chlorinating system
3M long heavy duty column pipe same as above (Extra/Spare)
40 KVA Ser
vo Voltage stabilizer.
Trial & Testing
CE/UL Certified Intelligent Smart Energy Meter
Motor operated Actuator for with Sluice Valve of size upto 100 mm
Soft Stater with RS485Port- 400 V Class,
Auto Phase reversal unit with inbuilt time delay & enclosure (confirm to IEC: 60947-1 & IEC:60947-b-1
CE/UL Certified Hydrostatic type sub soil Water Level Transmiter for Tubewell
CE/UL Certified Pressure Transmiter .
Complete Cabling for Tubewell including all power & control cables of the equipment at pumphouse and OHT
SCADA Automation of Pumping Plant
CE & UL Certified PLC/RTU in IP 54 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification.
Soft Stater with RS485Port- 400 V Class, 15 kw
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display & control of process parameters.
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
Instrumentation of OHT DMA-1
CE/UL Certified Radar type level Transmitter for OHT
SITC of 1100 LPM, 60 m head 25 H.P. submersible pump set with 24 meter column pipe(100mm dia) assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
Flow control Valve 350 mm size
CE / UL certified Pressure Transmitter
Electromagnetic Flowmeter of 350mm Size
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Motor operated Actuator with Sluice valve 350 mm Size
Flow control Valve 250 mm size
Electromagnetic Flowmeter of 250mm Size
CE / UL certified Pressure Transmitter
Instrumentation of OHT DMA-2
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Trial run for 3 month period.
Motor operated Actuator with Sluice valve 250 mm Size
CONSTRUCTION OF TUBEWELL
Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c.
Drilling of 600/500 mm dia bore hole by DC Rig m/c complete with all required material, labour & T&P etc. complete.
600 mm dia Drilling from 0 to 60 M BGL
500 mm dia Drilling from 61 to 100 M BGL
500 mm dia Drilling from 101 to 200 M BGL
Logging of bore hole by departmental/approved electric logger.
TUBEWELL ASSEMBLY
Zone-3 New Tubewell-5,6 & 7
300 mm dia
200mm dia
LOWERING OF ASSEMBLY
Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia size Assembly from 0 to 54 M BGL
200 mm dia size Assembly from 55 to 100 M BGL
200 mm dia size Assembly from 101 to 180 M BGL
PEA-GRAVEL
Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened and properly Stacked at Site.
DEVELOPMENT OF TUBEWELL
By Air Compressor
Transportation, Erection & Dismantling of 250 PSI Air Compressor.
Development of T.W. by 250 PSI Air Compressor with all required material, labour, T&P etc.
By O.P. Unit
Transportation, Erection & Dismantling of 3 Cusec O.P. Unit and Yield Test.
Development of T.W. by 3 Cusec O.P. Unit with all required material, labour, T&P etc.
Yield test of tubewell along with chemical and bacteriological analysis of tubewell's water.
Pumping plant and other instrumentation work
Zone-6 New Tubewell-14,15 & 16
SCADA Compatable chlorinating system
3M long heavy duty column pipe same as above (Extra/Spare)
Zone-4 New Tubewell-8,9 & 10
vo Voltage stabilizer.
Trial & Testing
CE/UL Certified Intelligent Smart Energy Meter
Motor operated Actuator for with Sluice Valve of size upto 100 mm
Soft Stater with RS485Port- 400 V Class,
Auto Phase reversal unit with inbuilt time delay & enclosure (confirm to IEC: 60947-1 & IEC:60947-b-1
CE/UL Certified Hydrostatic type sub soil Water Level Transmiter for Tubewell
CE/UL Certified Pressure Transmiter .
Complete Cabling for Tubewell including all power & control cables of the equipment at pumphouse and OHT
SCADA Automation of Pumping Plant
CE & UL Certified PLC/RTU in IP 54 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification.
Soft Stater with RS485Port- 400 V Class, 15 kw
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display & control of process parameters.
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
Instrumentation of OHT DMA-1
CE/UL Certified Radar type level Transmitter for OHT
SITC of 1100 LPM, 60 m head 25 H.P. submersible pump set with 24 meter column pipe(100mm dia) assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
Flow control Valve 350 mm size
CE / UL certified Pressure Transmitter
Electromagnetic Flowmeter of 350mm Size
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Trial run for 3 month period.
50 KVA Servo Voltage stabilizer.
CONSTRUCTION OF TUBEWELL
Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c.
Drilling of 600/500 mm dia bore hole by DC Rig m/c complete with all required material, labour & T&P etc. complete.
600 mm dia Drilling from 0 to 60 M BGL
500 mm dia Drilling from 61 to 100 M BGL
500 mm dia Drilling from 101 to 200 M BGL
Logging of bore hole by departmental/approved electric logger.
TUBEWELL ASSEMBLY
Zone-3 New Tubewell-5,6 & 7
300 mm dia
200mm dia
LOWERING OF ASSEMBLY
Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia size Assembly from 0 to 54 M BGL
200 mm dia size Assembly from 55 to 100 M BGL
200 mm dia size Assembly from 101 to 180 M BGL
PEA-GRAVEL
Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened and properly Stacked at Site.
DEVELOPMENT OF TUBEWELL
By Air Compressor
Transportation, Erection & Dismantling of 250 PSI Air Compressor.
Development of T.W. by 250 PSI Air Compressor with all required material, labour, T&P etc.
By O.P. Unit
Transportation, Erection & Dismantling of 3 Cusec O.P. Unit and Yield Test.
Development of T.W. by 3 Cusec O.P. Unit with all required material, labour, T&P etc.
Yield test of tubewell along with chemical and bacteriological analysis of tubewell's water.
Pumping plant and other instrumentation work
Motor operated Actuator for with Sluice Valve of size upto 150 mm
SCADA Compatable chlorinating system
3M long heavy duty column pipe same as above (Extra/Spare)
Zone-4 New Tubewell-8,9 & 10
vo Voltage stabilizer.
Trial & Testing
CE/UL Certified Intelligent Smart Energy Meter
Motor operated Actuator for with Sluice Valve of size upto 100 mm
Soft Stater with RS485Port- 400 V Class,
Auto Phase reversal unit with inbuilt time delay & enclosure (confirm to IEC: 60947-1 & IEC:60947-b-1
CE/UL Certified Hydrostatic type sub soil Water Level Transmiter for Tubewell
CE/UL Certified Pressure Transmiter .
Complete Cabling for Tubewell including all power & control cables of the equipment at pumphouse and OHT
SCADA Automation of Pumping Plant
CE & UL Certified PLC/RTU in IP 54 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification.
Soft Stater with RS485Port- 400 V Class, 15 kw
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display & control of process parameters.
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
Instrumentation of OHT DMA-1
CE/UL Certified Radar type level Transmitter for OHT
SITC of 1100 LPM, 60 m head 25 H.P. submersible pump set with 24 meter column pipe(100mm dia) assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
Flow control Valve 350 mm size
CE / UL certified Pressure Transmitter
Electromagnetic Flowmeter of 350mm Size
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Motor operated Actuator with Sluice valve 350 mm Size
Zone-5 New Tubewell-11,12 & 13
Flow control Valve 300 mm size
CE / UL certified Pressure Transmitter
Electromagnetic Flowmeter of 300mm Size
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Trial run for 3 month period.
Motor operated Actuator with Sluice valve 300 mm Size
CONSTRUCTION OF TUBEWELL
Transportation of Rig m/c and its T&P including Erection and Dismantling of Rig m/c.
Drilling of 600/500 mm dia bore hole by DC Rig m/c complete with all required material, labour & T&P etc. complete.
600 mm dia Drilling from 0 to 60 M BGL
500 mm dia Drilling from 61 to 100 M BGL
500 mm dia Drilling from 101 to 200 M BGL
Logging of bore hole by departmental/approved electric logger.
TUBEWELL ASSEMBLY
Zone-3 New Tubewell-5,6 & 7
300 mm dia
200mm dia
LOWERING OF ASSEMBLY
Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia size Assembly from 0 to 54 M BGL
200 mm dia size Assembly from 55 to 100 M BGL
200 mm dia size Assembly from 101 to 180 M BGL
PEA-GRAVEL
Supply of 1.6 - 4.8 mm size Lal Kuwan Quarry Pea-Gravel Duly Washed, Screened and properly Stacked at Site.
DEVELOPMENT OF TUBEWELL
By Air Compressor
Transportation, Erection & Dismantling of 250 PSI Air Compressor.
Development of T.W. by 250 PSI Air Compressor with all required material, labour, T&P etc.
By O.P. Unit
Transportation, Erection & Dismantling of 3 Cusec O.P. Unit and Yield Test.
Development of T.W. by 3 Cusec O.P. Unit with all required material, labour, T&P etc.
Yield test of tubewell along with chemical and bacteriological analysis of tubewell's water.
Pumping plant and other instrumentation work
Zone-6 New Tubewell-14,15 & 16
SCADA Compatable chlorinating system
3M long heavy duty column pipe same as above (Extra/Spare)
Zone-4 New Tubewell-8,9 & 10
vo Voltage stabilizer.
Trial & Testing
CE/UL Certified Intelligent Smart Energy Meter
SITC of 1300 LPM, 60 m head 30 H.P. submersible pump set with 24 meter column pipe(150mm dia) assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
Soft Stater with RS485Port- 400 V Class,
Auto Phase reversal unit with inbuilt time delay & enclosure (confirm to IEC: 60947-1 & IEC:60947-b-1
CE/UL Certified Hydrostatic type sub soil Water Level Transmiter for Tubewell
CE/UL Certified Pressure Transmiter .
Complete Cabling for Tubewell including all power & control cables of the equipment at pumphouse and OHT
SCADA Automation of Pumping Plant
CE & UL Certified PLC/RTU in IP 54 enclosure suitable to Communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & fetures as specified for each tubewell/OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification.
Soft Stater with RS485Port- 400 V Class, 15 kw
CE/UL Certified Surge protector for control panel
CE/UL certified 7" HMI touch screen suitable to communicate with PLC/RTU for local display & control of process parameters.
Control panel with IP 54 protection, industrial grade for all equipment (Separate for control (24V) and power equipment).
Installation, commissioing & testing for one tubewell
Trial Run for 3 month period for one tubewell
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
Instrumentation of OHT DMA-1
CE/UL Certified Radar type level Transmitter for OHT
SITC of 1100 LPM, 60 m head 25 H.P. submersible pump set with 24 meter column pipe(100mm dia) assembly, NRV, CI D/F Bend 90°, CI A/F Tee, D/F pipe (1.5m long 2 Nos and 1.0m long 1 No), Earthing, Painting Toolset, Power wiring of pump house internal and external, Chainpully block, and all Pumping plant accessories with nut bolts and rubber packing etc. Rates of items required for SCADA Automation of pumping plant are not included in these rates.
Flow control Valve 350 mm size
CE / UL certified Pressure Transmitter
Electromagnetic Flowmeter of 350mm Size
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Motor operated Actuator with Sluice valve 350 mm Size
G.S.M/G.P.R.S based wireless communication 4G Modem for RTU/PLC Capable to transfer & gather data from remote sites to control stations all accessories included with signal enhancer antenna made for pumping plant internet charges as specified in tender technical specification.
Motor operated Actuator with Sluice valve 400 mm Size
CE / UL certified Pressure Transmitter
Flow control Valve 400 mm size
Residual chlorine analyzer with following description:- i- Chlorine Measuring sensor (Chlorine analyzer) for free chlorine membrane covered sensor 0.01…2mg/l; low pH dependency. ii- Single parameter system ready to operate to measure free or total chlorine iii- Connection cable 2 m, 2-wire, 2 x stripped ends, tinned iv- Battery and other accessories for power back for continous operation.
Trial run for 3 month period.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.79 MB
TenderDocument.pdf
Tender Documents • 9.09 MB
BOQ_2024456.xls
BOQ • 1.00 MB
Download all tender documents and submit your bid