| 1 | L1₹45.6 LAccepted-AOC | ₹45.6 L | L1 | Accepted-AOC Lowest Quoted Amount |
| 2 | 0Rejected-Finance 157 157 SADAR KABARI BAZAR MEERUT CANTT MEERUT MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | - | 0 | Rejected-Finance Incorrect Finance Documents Uploaded. |
Tender Value
₹51.0 L
EMD Value
₹1 L
Closing Date
26 Mar 2026, 12:00 pmClosed
DSCO Keshav Kumar
Opposite Aggarwal Hospital, Kishanpura Road, Sangrur
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV/Sluice Valves, Construction of Haudies and all other allied works.
2026_DOA_162653_2
DSWC/SAN/2025-2026/34
Open Tender
Pipe Laying Works
365 days
Sangrur
Please refer tender documents.
3 documents required · 3 mandatory
₹2,000
₹1 L
6 May 2026
19 Mar 2026
26 Mar 2026
19 Mar 2026
26 Mar 2026
19 Mar 2026
FINANCIAL BID NO.: DSWC/SAN/2025-26/34
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
Note: Please quote only figure (upto 2 decimal points) in above blue colour box in minus or plus. Do not put %age sign after this figure. Please check Quoted Rate in Next cell.
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Bishanpura Khokhar (C/o 11000/L) (Ext.), Tehsil-Moonak and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1967.63 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1325 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 208.66 Rupees Two Hundred Eight and Sixty Six Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 12 /Cut hole 105 Rupees One Hundred Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 5 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400 mm) /Riser & Valve 710.43 Rupees Seven Hundred Ten and Forty Three Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 289.26 Rupees Two Hundred Eighty Nine and Twenty Six Paise Only
Fixing of Gate valves with C.C 1:2:4 (400 mm) 2 /Gate Valve Rupees Two Thousand Fifty Five and Forty Three Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3881 Rupees Three Thousand Eight Hundred Eighty One Only
Plain Cement Concrete 1:2:4 0.14 cum 5132 Rupees Five Thousand One Hundred Thirty Two Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5050 Rupees Five Thousand Fifty Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.5 Rupees Two Hundred Two and Fifty Paise Only
RCC Slab 1:2:4 0.21 cum 8226 Rupees Eight Thousand Two Hundred Twenty Six Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for TWO Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 73.14 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 0 Ton 209.86 Rupees Two Hundred Nine and Eighty Six Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 300 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - BADALGARH (C/o 27680/R) (Ext.), Tehsil-Moonak and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1083 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 950 /Mtrs 84 Rupee Eighty Four Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 116.9 Rupees One Hundred Sixteen and Ninety Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 4 /Cut hole 75 Rupees Seventy Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 2 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (300 mm) /Riser & Valve 486 Rupees Four Hundred Eighty Six Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 287 Rupees Two Hundred Eighty Seven Only
Fixing of Gate valves with C.C 1:2:4 (300 mm) 2 /Gate Valve 1453 Rupees One Thousand Four Hundred Fifty Three Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3866 Rupees Three Thousand Eight Hundred Sixty Six Only
Plain Cement Concrete 1:2:4 0.14 cum 5094 Rupees Five Thousand Ninty Four Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5043 Rupees Five Thousand Fourty Three Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202 Rupees Two Hundred Two Only
RCC Slab 1:2:4 0.21 cum 8191 Rupees Eight Thousand One Hundred Ninety One Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for TWO Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 29.792 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 52.334 Ton Rupees One Hundred Sixty and Thirty Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 450 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Bhathuan (C/o 19410/19380/R) (Ext.), Tehsil-Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 8090.25 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 5025 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 235.25 Rupees Two Hundred Thirty Five and Twenty Five Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (450 mm) 40 /Cut hole 116 Rupees One Hundred Sixteen Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 17 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (450 mm) /Riser & Valve 766.59 Rupees Seven Hundred Sixty Six and Fifty Nine Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 288.2 Rupees Two Hundred Eighty Eight and Twenty Paise Only
Fixing of Gate valves with C.C 1:2:4 (450 mm) 10 /Gate Valve 2173.98 Rupees Two Thousand One Hundared Seventy Three and Ninty Eight Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3873 Rupees Three Thousand Eight Hundred Seventy Three Only
Plain Cement Concrete 1:2:4 0.14 cum 5112 Rupees Five Thousand One Hundred Twelve Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5046 Rupees Five Thousand Fourty Six Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.35 Rupees Two Hundred Two and Thirty Five Paise Only
RCC Slab 1:2:4 0.21 cum 8208 Rupees Eight Thousand Two Hundred Eight Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for EIGHT Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 307.932 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 604.94 Ton 172.94 Rupees One Hundred Seventy Two and Ninty Four Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 300 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Nangla (C/o 5970/L), Tehsil-Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 3630 /Mtrs 84 Rupee Eighty Four Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 116.9 Rupees One Hundred Sixteen and Ninety Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 32 /Cut hole 75 Rupees Seventy Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 10 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (300 mm) /Riser & Valve 486.85 Rupees Four Hundred Eighty Six and Eighty Five Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 287.24 Rupees Two Hundred Eighty Seven and Twenty Four Paise Only
Fixing of Gate valves with C.C 1:2:4 (300 mm) 8 /Gate Valve 1453.76 Rupees One Thousand Four Hundred Fifty Three and Seventy Six Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3866 Rupees Three Thousand Eight Hundred Sixty Six Only
Plain Cement Concrete 1:2:4 0.14 cum 5094 Rupees Five Thousand Ninty Four Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5043 Rupees Five Thousand Fourty Three Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202 Rupees Two Hundred Two Only
RCC Slab 1:2:4 0.21 cum 8191 Rupees Eight Thousand One Hundred Ninety One Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for SEVEN Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 113.837 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 201.16 Ton Rupees One Hundred Sixty and Thirty Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency -11874
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 450 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - DHINDSA, BHUTAL KALAN (C/o 110100/R) (Ext.), Tehsil-Moonak and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 499.1 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 310 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 235 Rupees Two Hundred Thirty Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (450 mm) 1 /Cut hole 116 Rupees One Hundred Sixteen Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 1 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (450 mm) /Riser & Valve 766 Rupees Seven Hundred Sixty Six Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 288 Rupees Two Hundred Eighty Eight Only
Fixing of Gate valves with C.C 1:2:4 (450 mm) 1 /Gate Valve 2174 Rupees Two Thousand One Hundared Seventy Four Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3873 Rupees Three Thousand Eight Hundred Seventy Three Only
Plain Cement Concrete 1:2:4 0.14 cum 5112 Rupees Five Thousand One Hundred Twelve Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5046 Rupees Five Thousand Fourty Six Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.35 Rupees Two Hundred Two and Thirty Five Paise Only
RCC Slab 1:2:4 0.21 cum 8208 Rupees Eight Thousand Two Hundred Eight Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ZERO Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 18.997 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 37.25 Ton 172.94 Rupees One Hundred Seventy Four and Ninty Four Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 450 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - BHUTAL KHURD (C/o 7187/R) (Ext.), Tehsil-Moonak and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 966 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 600 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 235 Rupees Two Hundred Thirty Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (450 mm) 4 /Cut hole 116 Rupees One Hundred Sixteen Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 2 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (450 mm) /Riser & Valve 766 Rupees Seven Hundred Sixty Six Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 288 Rupees Two Hundred Eighty Eight Only
Fixing of Gate valves with C.C 1:2:4 (450 mm) 1 /Gate Valve 2172 Rupees Two Thousand One Hundared Seventy TwoOnly
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3873 Rupees Three Thousand Eight Hundred Seventy Three Only
Plain Cement Concrete 1:2:4 0.14 cum 5112 Rupees Five Thousand One Hundred Twelve Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5046 Rupees Five Thousand Fourty Six Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.35 Rupees Two Hundred Two and Thirty Five Paise Only
RCC Slab 1:2:4 0.21 cum 8208 Rupees Eight Thousand Two Hundred Eight Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ZERO Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 36.768 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 72.116 Ton 172.94 Rupees One Hundred Seventy Four and Ninty Four Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - DHINDSA (C/o 109487/L), Tehsil-Moonak and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 409.5 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 300 /Mtrs 76 Rupee Seventy Six Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . /Joints 161 Rupees One Hundred Sixty One Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (350 mm) 2 /Cut hole 75 Rupees Seventy Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 1 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (350 mm) /Riser & Valve 571 Rupees Five Hundred Seventy One Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 288 Rupees Two Hundred Eighty Eight Only
Fixing of Gate valves with C.C 1:2:4 (350 mm) 1 /Gate Valve 1737 Rupees One Thousand Seven Hundred Thirty Seven Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3866 Rupees Three Thousand Eight Hundred Sixty Six Only
Plain Cement Concrete 1:2:4 0.14 cum 5094 Rupees Five Thousand Ninty Four Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5043 Rupees Five Thousand Fourty Three Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202 Rupees Two Hundred Two Only
RCC Slab 1:2:4 0.21 cum 8191 Rupees Eight Thousand One Hundred Ninety One Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ZERO Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 11.04 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 26.136 Ton 172.94 Rupees One Hundred Seventy Two and Ninty Four Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 450 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - DASKA (C/o 5250-TR)(Extension), Tehsil-Lehra and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2986.55 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1855 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 742 /Joints 235.28 Rupees Two Hundred Thirty Five and Twenty Five Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (450 mm) 13 /Cut hole 116 Rupees One Hundred Sixteen Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 5 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (450 mm) /Riser & Valve 766.85 Rupees Seven Hundred Sixty Six and Fifty Nine Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) /Air pipe 288 Rupees Two Hundred Eighty Eight and Twenty Two Paise Only
Fixing of Gate valves with C.C 1:2:4 (450 mm) 5 /Gate Valve 2174 Rupees Two Thousand One Hundared Seventy Three and Ninty Eight Paise Only
Fixing of PUMP STAND (1100 MM) (Excavation+Labour and Material used for Foundation & Fixing of Pipe) 4 /Gate Valve 6643 Rupees Two Thousand One Hundared Seventy Three and Ninty Eight Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3873 Rupees Three Thousand Eight Hundred Seventy Three Only
Plain Cement Concrete 1:2:4 0.14 cum 5112 Rupees Five Thousand One Hundred Twelve Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5046 Rupees Five Thousand Fourty Six Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.35 Rupees Two Hundred Two and Thirty Five Paise Only
RCC Slab 1:2:4 0.21 cum 8208 Rupees Eight Thousand Two Hundred Eight Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ZERO Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only
Road Cut 0 each 15000 Rupees Fifteen Thousand Only
Nimar for jointing the pipe 113.674 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 223.202 Ton 172.94 Rupees Two Hundred Nine and Eighty Six Paise Only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 0
Grand Total (A+B+C+D+E+F+G+H)
Credit of Damaged lined water channel existing on site to be deducted from the bill of Agency
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
NITUGPL252634.pdf
Tender Documents • 0.50 MB
DNITUFPL252634.pdf
Tender Documents • 1.16 MB
FBUGPL252634.xls
Additional Documents • 0.19 MB
Download all tender documents and submit your bid