Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
8 Jun 2021, 3:00 pmClosed
PR & CC
This tender is floated for Mechanical Works at Sitarganj LPG plant.
21000155-HD-10157
21000155-HD-10157
Open Tender
Unknown (Unspecified Location)
₹0
Exempted
8 Jun 2021
19 May 2021
8 Jun 2021
8 Jun 2021
18 May 2021 - 27 May 2021
25 May 2021
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | F/E 1/2"ERW, IS-1239,PE, HEAV 12330- | F/E 1/2"ERW, IS-1239,PE, HEAV 12330- — LAYING ABOVE GROUND HYDRANT PIPE-LAYING, INSTALLATION, FABRICATION, WELDING OF HPCL SUPPLIED PIPELINES AND PLACING ON THE PEDESTALS, GANTRY STRUCTURES, STRUCTURAL BRIDGES/CATWALKS ETC. INCLUDING WELDING OF PIPES, BENDS, REDUCERS, PIPELINE FITTINGS ETC., CARRYING OUT REPAIRS IF ANY, HOOK-UP WITH THE PIPELINE ON EITHER END, HYDRO-TESTING OF ENTIRE SECTION OF PIPES TO A PRESSURE OF 16.5 KG/CM2 INCLUDING SUPPLY OF ALL TOOLS TACKLES, MACHINERY, EQUIPMENT’S, INSTRUMENTS, MANPOWER ETC. FOR COMPLETION OF THE JOB. JOB TO BE COMPLETED IN ALL RESPECT AS PER STANDARD SPECIFICATION AND DIRECTION OF ENGINEER-IN-CHARGE. THE SCOPE THE JOB INCLUDES BUT NOT LIMITED TO THE FOLLOWING: RECEIVING OWNER SUPPLIED MATERIALS, INCLUDING HANDLING, HAULING/LOADING, TRANSPORTATION TO WORK SITE, UNLOADING AND STRINGING. CUTTING, BEVELING, GRINDING, EDGE PREPARATION (INCLUDING ANY ADDITIONAL CUTTING, BEVELING, GRINDING REQUIRED FOR PERFECT FIT UP, BETWEEN THE EDGES OF THE PIPES, BENDS ETC.), ALIGNING, FIT-UP, WELDING OF PIPES AS PER APPROVED TECHNICAL SPECIFICATIONS/PROCEDURES OF THIS TENDER. JOB ALSO INCLUDE HYDRO-TESTING. ROOT RUN SHALL BE WITH E-6010 ELECTRODE AND INTERMEDIATE AND FINISHED WELDING SHALL BE WITH E-7018 ELECTRODES OF ESAB OR APPROVED EQUIVALENT. THE JOB ALSO INCLUDES FABRICATION OF ANY BENDS, TEES, ECCENTRIC OR CONCENTRIC REDUCERS SUPPLIED BY HPCL OR IN THE SCOPE OF THE CONTRACTOR. JOB TO BE COMPLETED IN ALL RESPECT AS PER DIRECTION OF ENGINEER-IN-CHARGE. NOTE: ALL PIPELINES, FLANGES, VALVES, BENDS, TEES, AND OTHER APPLICABLE WILL BE SUPPLIED BY HPCL. IF LEAKAGE THROUGH THE PIPE SEAM JOINT IS OBSERVED, CONTRACTOR SHALL REMOVE THE DEFECTIVE PORTION OF THE PIPELINE AND REPLACE WITH A NEW HPCL SUPPLIED PIPE AND RETEST IT. THE REPLACED PORTION OF THE PIPELINE WILL BE PAID EXTRA. LENGTH OF ALL PIPELINES SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF THE FLANGE, VALVES SHALL NOT BE MEASURED AS THEY ARE PAID SEPARATELY. EXECUTION OF THE JOB SHALL BE AS PER LATEST CODAL PROVISIONS, ATTACHED TECHNICAL SPECIFICATIONS AND AS DIRECTED BY ENGINEER-IN-CHARGE. | - | Meters |
| 2 | F/E 3/4"ERW, IS-1239,PE, HEAV 12330- | F/E 3/4"ERW, IS-1239,PE, HEAV 12330- — LAYING ABOVE GROUND HYDRANT PIPE-LAYING, INSTALLATION, FABRICATION, WELDING OF HPCL SUPPLIED PIPELINES AND PLACING ON THE PEDESTALS, GANTRY STRUCTURES, STRUCTURAL BRIDGES/CATWALKS ETC. INCLUDING WELDING OF PIPES, BENDS, REDUCERS, PIPELINE FITTINGS ETC., CARRYING OUT REPAIRS IF ANY, HOOK-UP WITH THE PIPELINE ON EITHER END, HYDRO-TESTING OF ENTIRE SECTION OF PIPES TO A PRESSURE OF 16.5 KG/CM2 INCLUDING SUPPLY OF ALL TOOLS TACKLES, MACHINERY, EQUIPMENT’S, INSTRUMENTS, MANPOWER ETC. FOR COMPLETION OF THE JOB. JOB TO BE COMPLETED IN ALL RESPECT AS PER STANDARD SPECIFICATION AND DIRECTION OF ENGINEER-IN-CHARGE. THE SCOPE THE JOB INCLUDES BUT NOT LIMITED TO THE FOLLOWING: RECEIVING OWNER SUPPLIED MATERIALS, INCLUDING HANDLING, HAULING/LOADING, TRANSPORTATION TO WORK SITE, UNLOADING AND STRINGING. CUTTING, BEVELING, GRINDING, EDGE PREPARATION (INCLUDING ANY ADDITIONAL CUTTING, BEVELING, GRINDING REQUIRED FOR PERFECT FIT UP, BETWEEN THE EDGES OF THE PIPES, BENDS ETC.), ALIGNING, FIT-UP, WELDING OF PIPES AS PER APPROVED TECHNICAL SPECIFICATIONS/PROCEDURES OF THIS TENDER. JOB ALSO INCLUDE HYDRO-TESTING. ROOT RUN SHALL BE WITH E-6010 ELECTRODE AND INTERMEDIATE AND FINISHED WELDING SHALL BE WITH E-7018 ELECTRODES OF ESAB OR APPROVED EQUIVALENT. THE JOB ALSO INCLUDES FABRICATION OF ANY BENDS, TEES, ECCENTRIC OR CONCENTRIC REDUCERS SUPPLIED BY HPCL OR IN THE SCOPE OF THE CONTRACTOR. JOB TO BE COMPLETED IN ALL RESPECT AS PER DIRECTION OF ENGINEER-IN-CHARGE. NOTE: ALL PIPELINES, FLANGES, VALVES, BENDS, TEES, AND OTHER APPLICABLE WILL BE SUPPLIED BY HPCL. IF LEAKAGE THROUGH THE PIPE SEAM JOINT IS OBSERVED, CONTRACTOR SHALL REMOVE THE DEFECTIVE PORTION OF THE PIPELINE AND REPLACE WITH A NEW HPCL SUPPLIED PIPE AND RETEST IT. THE REPLACED PORTION OF THE PIPELINE WILL BE PAID EXTRA. LENGTH OF ALL PIPELINES SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF THE FLANGE, VALVES SHALL NOT BE MEASURED AS THEY ARE PAID SEPARATELY. EXECUTION OF THE JOB SHALL BE AS PER LATEST CODAL PROVISIONS, ATTACHED TECHNICAL SPECIFICATIONS AND AS DIRECTED BY ENGINEER-IN-CHARGE. | - | Meters |
| 3 | F/E 1"ERW, IS-1239,PE, HEAVY 12330- | F/E 1"ERW, IS-1239,PE, HEAVY 12330- — LAYING ABOVE GROUND HYDRANT PIPE-LAYING, INSTALLATION, FABRICATION, WELDING OF HPCL SUPPLIED PIPELINES AND PLACING ON THE PEDESTALS, GANTRY STRUCTURES, STRUCTURAL BRIDGES/CATWALKS ETC. INCLUDING WELDING OF PIPES, BENDS, REDUCERS, PIPELINE FITTINGS ETC., CARRYING OUT REPAIRS IF ANY, HOOK-UP WITH THE PIPELINE ON EITHER END, HYDRO-TESTING OF ENTIRE SECTION OF PIPES TO A PRESSURE OF 16.5 KG/CM2 INCLUDING SUPPLY OF ALL TOOLS TACKLES, MACHINERY, EQUIPMENT’S, INSTRUMENTS, MANPOWER ETC. FOR COMPLETION OF THE JOB. JOB TO BE COMPLETED IN ALL RESPECT AS PER STANDARD SPECIFICATION AND DIRECTION OF ENGINEER-IN-CHARGE. THE SCOPE THE JOB INCLUDES BUT NOT LIMITED TO THE FOLLOWING: RECEIVING OWNER SUPPLIED MATERIALS, INCLUDING HANDLING, HAULING/LOADING, TRANSPORTATION TO WORK SITE, UNLOADING AND STRINGING. CUTTING, BEVELING, GRINDING, EDGE PREPARATION (INCLUDING ANY ADDITIONAL CUTTING, BEVELING, GRINDING REQUIRED FOR PERFECT FIT UP, BETWEEN THE EDGES OF THE PIPES, BENDS ETC.), ALIGNING, FIT-UP, WELDING OF PIPES AS PER APPROVED TECHNICAL SPECIFICATIONS/PROCEDURES OF THIS TENDER. JOB ALSO INCLUDE HYDRO-TESTING. ROOT RUN SHALL BE WITH E-6010 ELECTRODE AND INTERMEDIATE AND FINISHED WELDING SHALL BE WITH E-7018 ELECTRODES OF ESAB OR APPROVED EQUIVALENT. THE JOB ALSO INCLUDES FABRICATION OF ANY BENDS, TEES, ECCENTRIC OR CONCENTRIC REDUCERS SUPPLIED BY HPCL OR IN THE SCOPE OF THE CONTRACTOR. JOB TO BE COMPLETED IN ALL RESPECT AS PER DIRECTION OF ENGINEER-IN-CHARGE. NOTE: ALL PIPELINES, FLANGES, VALVES, BENDS, TEES, AND OTHER APPLICABLE WILL BE SUPPLIED BY HPCL. IF LEAKAGE THROUGH THE PIPE SEAM JOINT IS OBSERVED, CONTRACTOR SHALL REMOVE THE DEFECTIVE PORTION OF THE PIPELINE AND REPLACE WITH A NEW HPCL SUPPLIED PIPE AND RETEST IT. THE REPLACED PORTION OF THE PIPELINE WILL BE PAID EXTRA. LENGTH OF ALL PIPELINES SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF THE FLANGE, VALVES SHALL NOT BE MEASURED AS THEY ARE PAID SEPARATELY. EXECUTION OF THE JOB SHALL BE AS PER LATEST CODAL PROVISIONS, ATTACHED TECHNICAL SPECIFICATIONS AND AS DIRECTED BY ENGINEER-IN-CHARGE. | - | Meters |
| 4 | F/E 1 1/2"ERW, IS-1239,PE, HE | F/E 1 1/2"ERW, IS-1239,PE, HE — LAYING ABOVE GROUND HYDRANT PIPE-LAYING, INSTALLATION, FABRICATION, WELDING OF HPCL SUPPLIED PIPELINES AND PLACING ON THE PEDESTALS, GANTRY STRUCTURES, STRUCTURAL BRIDGES/CATWALKS ETC. INCLUDING WELDING OF PIPES, BENDS, REDUCERS, PIPELINE FITTINGS ETC., CARRYING OUT REPAIRS IF ANY, HOOK-UP WITH THE PIPELINE ON EITHER END, HYDRO-TESTING OF ENTIRE SECTION OF PIPES TO A PRESSURE OF 16.5 KG/CM2 INCLUDING SUPPLY OF ALL TOOLS TACKLES, MACHINERY, EQUIPMENT’S, INSTRUMENTS, MANPOWER ETC. FOR COMPLETION OF THE JOB. JOB TO BE COMPLETED IN ALL RESPECT AS PER STANDARD SPECIFICATION AND DIRECTION OF ENGINEER-IN-CHARGE. THE SCOPE THE JOB INCLUDES BUT NOT LIMITED TO THE FOLLOWING: RECEIVING OWNER SUPPLIED MATERIALS, INCLUDING HANDLING, HAULING/LOADING, TRANSPORTATION TO WORK SITE, UNLOADING AND STRINGING. CUTTING, BEVELING, GRINDING, EDGE PREPARATION (INCLUDING ANY ADDITIONAL CUTTING, BEVELING, GRINDING REQUIRED FOR PERFECT FIT UP, BETWEEN THE EDGES OF THE PIPES, BENDS ETC.), ALIGNING, FIT-UP, WELDING OF PIPES AS PER APPROVED TECHNICAL SPECIFICATIONS/PROCEDURES OF THIS TENDER. JOB ALSO INCLUDE HYDRO-TESTING. ROOT RUN SHALL BE WITH E-6010 ELECTRODE AND INTERMEDIATE AND FINISHED WELDING SHALL BE WITH E-7018 ELECTRODES OF ESAB OR APPROVED EQUIVALENT. THE JOB ALSO INCLUDES FABRICATION OF ANY BENDS, TEES, ECCENTRIC OR CONCENTRIC REDUCERS SUPPLIED BY HPCL OR IN THE SCOPE OF THE CONTRACTOR. JOB TO BE COMPLETED IN ALL RESPECT AS PER DIRECTION OF ENGINEER-IN-CHARGE. NOTE: ALL PIPELINES, FLANGES, VALVES, BENDS, TEES, AND OTHER APPLICABLE WILL BE SUPPLIED BY HPCL. IF LEAKAGE THROUGH THE PIPE SEAM JOINT IS OBSERVED, CONTRACTOR SHALL REMOVE THE DEFECTIVE PORTION OF THE PIPELINE AND REPLACE WITH A NEW HPCL SUPPLIED PIPE AND RETEST IT. THE REPLACED PORTION OF THE PIPELINE WILL BE PAID EXTRA. LENGTH OF ALL PIPELINES SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF THE FLANGE, VALVES SHALL NOT BE MEASURED AS THEY ARE PAID SEPARATELY. EXECUTION OF THE JOB SHALL BE AS PER LATEST CODAL PROVISIONS, ATTACHED TECHNICAL SPECIFICATIONS AND AS DIRECTED BY ENGINEER-IN-CHARGE. | - | Meters |
| 5 | F/E 2"ERW, IS-1239,BE, HEAVY 12330- | F/E 2"ERW, IS-1239,BE, HEAVY 12330- — LAYING ABOVE GROUND HYDRANT PIPE-LAYING, INSTALLATION, FABRICATION, WELDING OF HPCL SUPPLIED PIPELINES AND PLACING ON THE PEDESTALS, GANTRY STRUCTURES, STRUCTURAL BRIDGES/CATWALKS ETC. INCLUDING WELDING OF PIPES, BENDS, REDUCERS, PIPELINE FITTINGS ETC., CARRYING OUT REPAIRS IF ANY, HOOK-UP WITH THE PIPELINE ON EITHER END, HYDRO-TESTING OF ENTIRE SECTION OF PIPES TO A PRESSURE OF 16.5 KG/CM2 INCLUDING SUPPLY OF ALL TOOLS TACKLES, MACHINERY, EQUIPMENT’S, INSTRUMENTS, MANPOWER ETC. FOR COMPLETION OF THE JOB. JOB TO BE COMPLETED IN ALL RESPECT AS PER STANDARD SPECIFICATION AND DIRECTION OF ENGINEER-IN-CHARGE. THE SCOPE THE JOB INCLUDES BUT NOT LIMITED TO THE FOLLOWING: RECEIVING OWNER SUPPLIED MATERIALS, INCLUDING HANDLING, HAULING/LOADING, TRANSPORTATION TO WORK SITE, UNLOADING AND STRINGING. CUTTING, BEVELING, GRINDING, EDGE PREPARATION (INCLUDING ANY ADDITIONAL CUTTING, BEVELING, GRINDING REQUIRED FOR PERFECT FIT UP, BETWEEN THE EDGES OF THE PIPES, BENDS ETC.), ALIGNING, FIT-UP, WELDING OF PIPES AS PER APPROVED TECHNICAL SPECIFICATIONS/PROCEDURES OF THIS TENDER. JOB ALSO INCLUDE HYDRO-TESTING. ROOT RUN SHALL BE WITH E-6010 ELECTRODE AND INTERMEDIATE AND FINISHED WELDING SHALL BE WITH E-7018 ELECTRODES OF ESAB OR APPROVED EQUIVALENT. THE JOB ALSO INCLUDES FABRICATION OF ANY BENDS, TEES, ECCENTRIC OR CONCENTRIC REDUCERS SUPPLIED BY HPCL OR IN THE SCOPE OF THE CONTRACTOR. JOB TO BE COMPLETED IN ALL RESPECT AS PER DIRECTION OF ENGINEER-IN-CHARGE. NOTE: ALL PIPELINES, FLANGES, VALVES, BENDS, TEES, AND OTHER APPLICABLE WILL BE SUPPLIED BY HPCL. IF LEAKAGE THROUGH THE PIPE SEAM JOINT IS OBSERVED, CONTRACTOR SHALL REMOVE THE DEFECTIVE PORTION OF THE PIPELINE AND REPLACE WITH A NEW HPCL SUPPLIED PIPE AND RETEST IT. THE REPLACED PORTION OF THE PIPELINE WILL BE PAID EXTRA. LENGTH OF ALL PIPELINES SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF THE FLANGE, VALVES SHALL NOT BE MEASURED AS THEY ARE PAID SEPARATELY. EXECUTION OF THE JOB SHALL BE AS PER LATEST CODAL PROVISIONS, ATTACHED TECHNICAL SPECIFICATIONS AND AS DIRECTED BY ENGINEER-IN-CHARGE. | - | Meters |
| 6 | F/E 2 1/2"ERW, IS-1239,BE, HE | F/E 2 1/2"ERW, IS-1239,BE, HE — LAYING ABOVE GROUND HYDRANT PIPE-LAYING, INSTALLATION, FABRICATION, WELDING OF HPCL SUPPLIED PIPELINES AND PLACING ON THE PEDESTALS, GANTRY STRUCTURES, STRUCTURAL BRIDGES/CATWALKS ETC. INCLUDING WELDING OF PIPES, BENDS, REDUCERS, PIPELINE FITTINGS ETC., CARRYING OUT REPAIRS IF ANY, HOOK-UP WITH THE PIPELINE ON EITHER END, HYDRO-TESTING OF ENTIRE SECTION OF PIPES TO A PRESSURE OF 16.5 KG/CM2 INCLUDING SUPPLY OF ALL TOOLS TACKLES, MACHINERY, EQUIPMENT’S, INSTRUMENTS, MANPOWER ETC. FOR COMPLETION OF THE JOB. JOB TO BE COMPLETED IN ALL RESPECT AS PER STANDARD SPECIFICATION AND DIRECTION OF ENGINEER-IN-CHARGE. THE SCOPE THE JOB INCLUDES BUT NOT LIMITED TO THE FOLLOWING: RECEIVING OWNER SUPPLIED MATERIALS, INCLUDING HANDLING, HAULING/LOADING, TRANSPORTATION TO WORK SITE, UNLOADING AND STRINGING. CUTTING, BEVELING, GRINDING, EDGE PREPARATION (INCLUDING ANY ADDITIONAL CUTTING, BEVELING, GRINDING REQUIRED FOR PERFECT FIT UP, BETWEEN THE EDGES OF THE PIPES, BENDS ETC.), ALIGNING, FIT-UP, WELDING OF PIPES AS PER APPROVED TECHNICAL SPECIFICATIONS/PROCEDURES OF THIS TENDER. JOB ALSO INCLUDE HYDRO-TESTING. ROOT RUN SHALL BE WITH E-6010 ELECTRODE AND INTERMEDIATE AND FINISHED WELDING SHALL BE WITH E-7018 ELECTRODES OF ESAB OR APPROVED EQUIVALENT. THE JOB ALSO INCLUDES FABRICATION OF ANY BENDS, TEES, ECCENTRIC OR CONCENTRIC REDUCERS SUPPLIED BY HPCL OR IN THE SCOPE OF THE CONTRACTOR. JOB TO BE COMPLETED IN ALL RESPECT AS PER DIRECTION OF ENGINEER-IN-CHARGE. NOTE: ALL PIPELINES, FLANGES, VALVES, BENDS, TEES, AND OTHER APPLICABLE WILL BE SUPPLIED BY HPCL. IF LEAKAGE THROUGH THE PIPE SEAM JOINT IS OBSERVED, CONTRACTOR SHALL REMOVE THE DEFECTIVE PORTION OF THE PIPELINE AND REPLACE WITH A NEW HPCL SUPPLIED PIPE AND RETEST IT. THE REPLACED PORTION OF THE PIPELINE WILL BE PAID EXTRA. LENGTH OF ALL PIPELINES SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF THE FLANGE, VALVES SHALL NOT BE MEASURED AS THEY ARE PAID SEPARATELY. EXECUTION OF THE JOB SHALL BE AS PER LATEST CODAL PROVISIONS, ATTACHED TECHNICAL SPECIFICATIONS AND AS DIRECTED BY ENGINEER-IN-CHARGE. | - | Meters |
| 7 | F/E 3" ERW, IS-1239,BE, HEAVY 12330- | F/E 3" ERW, IS-1239,BE, HEAVY 12330- — LAYING ABOVE GROUND HYDRANT PIPE-LAYING, INSTALLATION, FABRICATION, WELDING OF HPCL SUPPLIED PIPELINES AND PLACING ON THE PEDESTALS, GANTRY STRUCTURES, STRUCTURAL BRIDGES/CATWALKS ETC. INCLUDING WELDING OF PIPES, BENDS, REDUCERS, PIPELINE FITTINGS ETC., CARRYING OUT REPAIRS IF ANY, HOOK-UP WITH THE PIPELINE ON EITHER END, HYDRO-TESTING OF ENTIRE SECTION OF PIPES TO A PRESSURE OF 16.5 KG/CM2 INCLUDING SUPPLY OF ALL TOOLS TACKLES, MACHINERY, EQUIPMENT’S, INSTRUMENTS, MANPOWER ETC. FOR COMPLETION OF THE JOB. JOB TO BE COMPLETED IN ALL RESPECT AS PER STANDARD SPECIFICATION AND DIRECTION OF ENGINEER-IN-CHARGE. THE SCOPE THE JOB INCLUDES BUT NOT LIMITED TO THE FOLLOWING: RECEIVING OWNER SUPPLIED MATERIALS, INCLUDING HANDLING, HAULING/LOADING, TRANSPORTATION TO WORK SITE, UNLOADING AND STRINGING. CUTTING, BEVELING, GRINDING, EDGE PREPARATION (INCLUDING ANY ADDITIONAL CUTTING, BEVELING, GRINDING REQUIRED FOR PERFECT FIT UP, BETWEEN THE EDGES OF THE PIPES, BENDS ETC.), ALIGNING, FIT-UP, WELDING OF PIPES AS PER APPROVED TECHNICAL SPECIFICATIONS/PROCEDURES OF THIS TENDER. JOB ALSO INCLUDE HYDRO-TESTING. ROOT RUN SHALL BE WITH E-6010 ELECTRODE AND INTERMEDIATE AND FINISHED WELDING SHALL BE WITH E-7018 ELECTRODES OF ESAB OR APPROVED EQUIVALENT. THE JOB ALSO INCLUDES FABRICATION OF ANY BENDS, TEES, ECCENTRIC OR CONCENTRIC REDUCERS SUPPLIED BY HPCL OR IN THE SCOPE OF THE CONTRACTOR. JOB TO BE COMPLETED IN ALL RESPECT AS PER DIRECTION OF ENGINEER-IN-CHARGE. NOTE: ALL PIPELINES, FLANGES, VALVES, BENDS, TEES, AND OTHER APPLICABLE WILL BE SUPPLIED BY HPCL. IF LEAKAGE THROUGH THE PIPE SEAM JOINT IS OBSERVED, CONTRACTOR SHALL REMOVE THE DEFECTIVE PORTION OF THE PIPELINE AND REPLACE WITH A NEW HPCL SUPPLIED PIPE AND RETEST IT. THE REPLACED PORTION OF THE PIPELINE WILL BE PAID EXTRA. LENGTH OF ALL PIPELINES SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF THE FLANGE, VALVES SHALL NOT BE MEASURED AS THEY ARE PAID SEPARATELY. EXECUTION OF THE JOB SHALL BE AS PER LATEST CODAL PROVISIONS, ATTACHED TECHNICAL SPECIFICATIONS AND AS DIRECTED BY ENGINEER-IN-CHARGE. | - | Meters |
| 8 | F/E 4"ERW, IS-1239,BE, HEAVY 12330- | F/E 4"ERW, IS-1239,BE, HEAVY 12330- — LAYING ABOVE GROUND HYDRANT PIPE-LAYING, INSTALLATION, FABRICATION, WELDING OF HPCL SUPPLIED PIPELINES AND PLACING ON THE PEDESTALS, GANTRY STRUCTURES, STRUCTURAL BRIDGES/CATWALKS ETC. INCLUDING WELDING OF PIPES, BENDS, REDUCERS, PIPELINE FITTINGS ETC., CARRYING OUT REPAIRS IF ANY, HOOK-UP WITH THE PIPELINE ON EITHER END, HYDRO-TESTING OF ENTIRE SECTION OF PIPES TO A PRESSURE OF 16.5 KG/CM2 INCLUDING SUPPLY OF ALL TOOLS TACKLES, MACHINERY, EQUIPMENT’S, INSTRUMENTS, MANPOWER ETC. FOR COMPLETION OF THE JOB. JOB TO BE COMPLETED IN ALL RESPECT AS PER STANDARD SPECIFICATION AND DIRECTION OF ENGINEER-IN-CHARGE. THE SCOPE THE JOB INCLUDES BUT NOT LIMITED TO THE FOLLOWING: RECEIVING OWNER SUPPLIED MATERIALS, INCLUDING HANDLING, HAULING/LOADING, TRANSPORTATION TO WORK SITE, UNLOADING AND STRINGING. CUTTING, BEVELING, GRINDING, EDGE PREPARATION (INCLUDING ANY ADDITIONAL CUTTING, BEVELING, GRINDING REQUIRED FOR PERFECT FIT UP, BETWEEN THE EDGES OF THE PIPES, BENDS ETC.), ALIGNING, FIT-UP, WELDING OF PIPES AS PER APPROVED TECHNICAL SPECIFICATIONS/PROCEDURES OF THIS TENDER. JOB ALSO INCLUDE HYDRO-TESTING. ROOT RUN SHALL BE WITH E-6010 ELECTRODE AND INTERMEDIATE AND FINISHED WELDING SHALL BE WITH E-7018 ELECTRODES OF ESAB OR APPROVED EQUIVALENT. THE JOB ALSO INCLUDES FABRICATION OF ANY BENDS, TEES, ECCENTRIC OR CONCENTRIC REDUCERS SUPPLIED BY HPCL OR IN THE SCOPE OF THE CONTRACTOR. JOB TO BE COMPLETED IN ALL RESPECT AS PER DIRECTION OF ENGINEER-IN-CHARGE. NOTE: ALL PIPELINES, FLANGES, VALVES, BENDS, TEES, AND OTHER APPLICABLE WILL BE SUPPLIED BY HPCL. IF LEAKAGE THROUGH THE PIPE SEAM JOINT IS OBSERVED, CONTRACTOR SHALL REMOVE THE DEFECTIVE PORTION OF THE PIPELINE AND REPLACE WITH A NEW HPCL SUPPLIED PIPE AND RETEST IT. THE REPLACED PORTION OF THE PIPELINE WILL BE PAID EXTRA. LENGTH OF ALL PIPELINES SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF THE FLANGE, VALVES SHALL NOT BE MEASURED AS THEY ARE PAID SEPARATELY. EXECUTION OF THE JOB SHALL BE AS PER LATEST CODAL PROVISIONS, ATTACHED TECHNICAL SPECIFICATIONS AND AS DIRECTED BY ENGINEER-IN-CHARGE. | - | Meters |
| 9 | F/E 6"ERW, IS-1239,BE, HEAVY 12330- | F/E 6"ERW, IS-1239,BE, HEAVY 12330- — LAYING ABOVE GROUND HYDRANT PIPE-LAYING, INSTALLATION, FABRICATION, WELDING OF HPCL SUPPLIED PIPELINES AND PLACING ON THE PEDESTALS, GANTRY STRUCTURES, STRUCTURAL BRIDGES/CATWALKS ETC. INCLUDING WELDING OF PIPES, BENDS, REDUCERS, PIPELINE FITTINGS ETC., CARRYING OUT REPAIRS IF ANY, HOOK-UP WITH THE PIPELINE ON EITHER END, HYDRO-TESTING OF ENTIRE SECTION OF PIPES TO A PRESSURE OF 16.5 KG/CM2 INCLUDING SUPPLY OF ALL TOOLS TACKLES, MACHINERY, EQUIPMENT’S, INSTRUMENTS, MANPOWER ETC. FOR COMPLETION OF THE JOB. JOB TO BE COMPLETED IN ALL RESPECT AS PER STANDARD SPECIFICATION AND DIRECTION OF ENGINEER-IN-CHARGE. THE SCOPE THE JOB INCLUDES BUT NOT LIMITED TO THE FOLLOWING: RECEIVING OWNER SUPPLIED MATERIALS, INCLUDING HANDLING, HAULING/LOADING, TRANSPORTATION TO WORK SITE, UNLOADING AND STRINGING. CUTTING, BEVELING, GRINDING, EDGE PREPARATION (INCLUDING ANY ADDITIONAL CUTTING, BEVELING, GRINDING REQUIRED FOR PERFECT FIT UP, BETWEEN THE EDGES OF THE PIPES, BENDS ETC.), ALIGNING, FIT-UP, WELDING OF PIPES AS PER APPROVED TECHNICAL SPECIFICATIONS/PROCEDURES OF THIS TENDER. JOB ALSO INCLUDE HYDRO-TESTING. ROOT RUN SHALL BE WITH E-6010 ELECTRODE AND INTERMEDIATE AND FINISHED WELDING SHALL BE WITH E-7018 ELECTRODES OF ESAB OR APPROVED EQUIVALENT. THE JOB ALSO INCLUDES FABRICATION OF ANY BENDS, TEES, ECCENTRIC OR CONCENTRIC REDUCERS SUPPLIED BY HPCL OR IN THE SCOPE OF THE CONTRACTOR. JOB TO BE COMPLETED IN ALL RESPECT AS PER DIRECTION OF ENGINEER-IN-CHARGE. NOTE: ALL PIPELINES, FLANGES, VALVES, BENDS, TEES, AND OTHER APPLICABLE WILL BE SUPPLIED BY HPCL. IF LEAKAGE THROUGH THE PIPE SEAM JOINT IS OBSERVED, CONTRACTOR SHALL REMOVE THE DEFECTIVE PORTION OF THE PIPELINE AND REPLACE WITH A NEW HPCL SUPPLIED PIPE AND RETEST IT. THE REPLACED PORTION OF THE PIPELINE WILL BE PAID EXTRA. LENGTH OF ALL PIPELINES SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF THE FLANGE, VALVES SHALL NOT BE MEASURED AS THEY ARE PAID SEPARATELY. EXECUTION OF THE JOB SHALL BE AS PER LATEST CODAL PROVISIONS, ATTACHED TECHNICAL SPECIFICATIONS AND AS DIRECTED BY ENGINEER-IN-CHARGE. | - | Meters |
| 10 | F/E 8"ERW, IS-3589, BE, 6.3MM 12330- | F/E 8"ERW, IS-3589, BE, 6.3MM 12330- — LAYING ABOVE GROUND HYDRANT PIPE-LAYING, INSTALLATION, FABRICATION, WELDING OF HPCL SUPPLIED PIPELINES AND PLACING ON THE PEDESTALS, GANTRY STRUCTURES, STRUCTURAL BRIDGES/CATWALKS ETC. INCLUDING WELDING OF PIPES, BENDS, REDUCERS, PIPELINE FITTINGS ETC., CARRYING OUT REPAIRS IF ANY, HOOK-UP WITH THE PIPELINE ON EITHER END, HYDRO-TESTING OF ENTIRE SECTION OF PIPES TO A PRESSURE OF 16.5 KG/CM2 INCLUDING SUPPLY OF ALL TOOLS TACKLES, MACHINERY, EQUIPMENT’S, INSTRUMENTS, MANPOWER ETC. FOR COMPLETION OF THE JOB. JOB TO BE COMPLETED IN ALL RESPECT AS PER STANDARD SPECIFICATION AND DIRECTION OF ENGINEER-IN-CHARGE. THE SCOPE THE JOB INCLUDES BUT NOT LIMITED TO THE FOLLOWING: RECEIVING OWNER SUPPLIED MATERIALS, INCLUDING HANDLING, HAULING/LOADING, TRANSPORTATION TO WORK SITE, UNLOADING AND STRINGING. CUTTING, BEVELING, GRINDING, EDGE PREPARATION (INCLUDING ANY ADDITIONAL CUTTING, BEVELING, GRINDING REQUIRED FOR PERFECT FIT UP, BETWEEN THE EDGES OF THE PIPES, BENDS ETC.), ALIGNING, FIT-UP, WELDING OF PIPES AS PER APPROVED TECHNICAL SPECIFICATIONS/PROCEDURES OF THIS TENDER. JOB ALSO INCLUDE HYDRO-TESTING. ROOT RUN SHALL BE WITH E-6010 ELECTRODE AND INTERMEDIATE AND FINISHED WELDING SHALL BE WITH E-7018 ELECTRODES OF ESAB OR APPROVED EQUIVALENT. THE JOB ALSO INCLUDES FABRICATION OF ANY BENDS, TEES, ECCENTRIC OR CONCENTRIC REDUCERS SUPPLIED BY HPCL OR IN THE SCOPE OF THE CONTRACTOR. JOB TO BE COMPLETED IN ALL RESPECT AS PER DIRECTION OF ENGINEER-IN-CHARGE. NOTE: ALL PIPELINES, FLANGES, VALVES, BENDS, TEES, AND OTHER APPLICABLE WILL BE SUPPLIED BY HPCL. IF LEAKAGE THROUGH THE PIPE SEAM JOINT IS OBSERVED, CONTRACTOR SHALL REMOVE THE DEFECTIVE PORTION OF THE PIPELINE AND REPLACE WITH A NEW HPCL SUPPLIED PIPE AND RETEST IT. THE REPLACED PORTION OF THE PIPELINE WILL BE PAID EXTRA. LENGTH OF ALL PIPELINES SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF THE FLANGE, VALVES SHALL NOT BE MEASURED AS THEY ARE PAID SEPARATELY. EXECUTION OF THE JOB SHALL BE AS PER LATEST CODAL PROVISIONS, ATTACHED TECHNICAL SPECIFICATIONS AND AS DIRECTED BY ENGINEER-IN-CHARGE. | - | Meters |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
21000155-HD-10157.pdf
TENDER_DOCUMENT • 24.56 MB
Download all tender documents and submit your bid