Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAccepted-AOC TUTICORIN TAMIL NADU | TUTICORIN | TAMIL NADU | 626202 | ₹13.0 L Quoted ₹14.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹15.3 LRejected-AOC | ₹15.3 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SEETHALAKSHMI ENTERPRISES | A.MURUGAN/GURU ENGINEERING |
|---|---|---|---|---|---|
| 1.00 | Clearing the ash deposits and debris accumulated in the catch pits and removing the chocking in the underground drains connecting the catch pits using water jets to ensure free flow of water between catch pits in the mill & boiler area once in a month including labour, lead, lift, disposing of the debris as directed labour, charges for coupling and handling water – hoses, tools & plants etc., complete. | 2,520 | Set | 9,07,200 ₹10.7 L | 8,54,280 ₹10.1 L |
| 2.00 | Cleaning the drains free of ash and debris in the Unit IV & V power house area to ensure free flow of water in the drains and disposing the ash & debris away from site with a maximum lead of 1 km including all labour charges conveyance & lead charges up to 1km, unloading, initial head load lead as per site conditions tools and plants, vehicle hire charges etc., complete. (The drains include the one along ‘C’ row wall on the south, drains around ESP IV & V control room buildings, around the sea water filtration plant, around the DG set II, the drain from DG set II to storm water pump house II and the East - West drain adjacent to the transformer yard II on the North side and around FOPH 1 & II and all the drains to be cleaned once in a month. Around the DG Set-II and drain from DG Set-II to Storm Water Pump House II to be cleaned once in a fortnight). | 2,088.2 | M3 | 6,26,460 ₹7.4 L | 5,99,313.4 ₹7.1 L |
Tender Value
Refer Docs
EMD Value
₹10,700
Closing Date
19 Jan 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Removal of Chocking in the Catch pits in the Mill and Boiler areas and Clearing the drains around the Power House Unit 4 and 5 Stage 3 and Drains around the Fuel Oil Tanks for the period from 01.04.2026 to 31.03.2027
2025_EB_637158_1
CE SE C TTPS Spec.No. 26 25 26
Open Tender
Civil Works - Others
365 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,700
Yes
24 Mar 2026
29 Dec 2025
20 Jan 2026
29 Dec 2025
19 Jan 2026
29 Dec 2025
Clearing the ash deposits and debris accumulated in the catch pits and removing the chocking in the underground drains connecting the catch pits using water jets to ensure free flow of water between catch pits in the mill & boiler area once in a month including labour, lead, lift, disposing of the debris as directed labour, charges for coupling and handling water – hoses, tools & plants etc., complete.
Cleaning the drains free of ash and debris in the Unit IV & V power house area to ensure free flow of water in the drains and disposing the ash & debris away from site with a maximum lead of 1 km including all labour charges conveyance & lead charges up to 1km, unloading, initial head load lead as per site conditions tools and plants, vehicle hire charges etc., complete. (The drains include the one along ‘C’ row wall on the south, drains around ESP IV & V control room buildings, around the sea water filtration plant, around the DG set II, the drain from DG set II to storm water pump house II and the East - West drain adjacent to the transformer yard II on the North side and around FOPH 1 & II and all the drains to be cleaned once in a month. Around the DG Set-II and drain from DG Set-II to Storm Water Pump House II to be cleaned once in a fortnight).
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_762577.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid