Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical As per tender Bid Document |
| 2 | Accepted-Technical ADD 5 SARDAR PATEL MARG CIVIL LINES PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | Accepted-Technical As per tender Bid Document |
| 3 | Rejected-Technical 538 KA 32 KA SITAPUR ROAD MAUSAMBAGH LUCKNOW UTTAR PRADESH 226020 | LUCKNOW | UTTAR PRADESH | 226020 | Rejected-Technical Not as per tender bid Document |
Tender Value
₹53.0 L
EMD Value
₹1.1 L
Closing Date
20 Mar 2026, 3:00 pmClosed
Executive Engineer
C.D. Prayagraj-02, U.P.A.V.P. Pratapgarh
Installation of CCTV camera at 11 nos various chauraha (Ghantagarh chauraha, Nirmal tiraha, Bhangwa chauraha, Ram- Ram chauraha, Jail tiraha, Thatheri bazar, Railway station mod, Chilbila chauki, Jila aspatal gate, Kapoor chauraha..
2026_UPHDB_1119116_1
279/J-08/18 Dated 17.02.2026
Open Tender
Electrical Works
Percentage
180 days
Pratapgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
Executive Engineer, C.D. Prayagraj-02, UPAVP.
₹1.1 L
Yes
24 Mar 2026
21 Feb 2026
20 Mar 2026
21 Feb 2026
20 Mar 2026
21 Feb 2026
S/F of CP- UNR-4 K5082-FI NVR proper completion of the work in all respect as per direction of E/I.
S/F of CP- UNP-E3241L18-DAQ proper completion of the work in all respect as per direction of E/I.
S/F of CP-UNC -TC81ZL6C-VMD-LQ 8MP IP BULLET CAMERA proper completion of the work in all respect as per direction of E/I.
S/ F of 4 TB HDD ( WD , SEAGTE TOSHIBA) (Storage Device) proper completion of the work in all respect as per direction of E/I.
S/F of POE SWITCH FULL GIGA D-LINK Power Switch proper completion of the work in all respect as per direction of E/I.
S/F of CAMERA HOUSING METEL proper completion of the work in all respect as per direction of E/I.
S/ F of RJ 45 CONNCETOR proper completion of the work in all respect as per direction of E/I.
S/F of 6 U RACK OUTDOOR MOUNT POE SWITCH proper completion of the work in all respect as per direction of E/I.
S/ F of CAMERA POLE proper completion of the work in all respect as per direction of E/I.
Construction of Plinth CAMERA POLE proper completion of the work in all respect as per direction of E/I.
S/ F of D-LINK WIRE 305 MTR OUTDOOR proper completion of the work in all respect as per direction of E/I.
S / F of LED T.V. 43 to 55 Inch proper completion of the work in all respect as per direction of E/I.
S / F CPU (I) 5 Processor 8 G.B RAM 512 GB SSD proper completion of the work in all respect as per direction of E/I.
S/F of Internet For one Year Broad Band for On Line Access proper completion of the work in all respect as per direction of E/I.
Electric Connection for Camera Point proper completion of the work in all respect as per direction of E/I.
Camera Installation, Testing and commissioning proper completion of the work in all respect as per direction of E/I.
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
T.pdf
Tender Documents • 24.97 MB
F.pdf
Tender Documents • 0.44 MB
BOQ_2080498.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .