| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAccepted-Finance | ₹3.4 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹3.4 Cr+₹7,324.30 (0.02%)Accepted-Finance | ₹3.4 Cr+₹7,324.30 (0.02%) | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | m/s tari hai enterprises L2 | MS IT enterprises L1 |
|---|---|---|---|---|---|
| 1.00EXCAVATION AND EARTH WORK | |||||
| 1.01 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30cm size, saturated soil and rock), lift upto 1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returing the stacked soil in 15cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. | 1,218 | cum | 413.5 ₹5,03,643 Lowest | 413.5 ₹5,03,643 Lowest |
| 1.02 | Re-filling excavated earth in foundations and plinth etc. in 15cm layer including ramming and watering etc. complete. | 300.44 | cum | 187.4 ₹56,303.02 Lowest | 187.4 ₹56,303.02 Lowest |
| 1.03 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 92.44 | cum | 1,008.5 ₹93,229.77 Lowest | 1,008.5 ₹93,229.77 Lowest |
| 1.04 | EARTH CUTTING- Site Clearance: Earth work in excavation in soils containing 50% or more of shingle or small size boulders upto 30 cm size including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions lead upto 50 m and lift upto 1.50 m. | 14,080 | cum | 203.5 ₹28,65,280 Lowest | 203.5 ₹28,65,280 Lowest |
| 2.00CONCRETE WORK | |||||
| 2.01 | Providing and laying in foundations and plinth cement concrete 1:4:8 (1 cement: 4 coarse sand : 8 graded stone aggregate 40mm nominal size) excluding the cost of centring and shuttering. | 214.18 | cum | 7,557.93 ₹16,18,757.45 Lowest | 7,557.93 ₹16,18,757.45 Lowest |
| 2.02 | Providing and laying damp proof course 38mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 12.5 mm nominal size) | 100.7 | sqm | 453.72 ₹45,688.24 Lowest | 453.72 ₹45,688.24 Lowest |
| 2.03 | Extra for providing and mixing water proofing material in cement concrete work in the proportion recommended by manufacturers. | 27.52 | per bag | 300.3 ₹8,264.26 Lowest | 300.3 ₹8,264.26 Lowest |
| 2.04 | Applying a coat of hot bitumen (mashphalte 80/100 or equivalent) using 1.70 kg. per sqm. on damp proof course after cleaing the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | 100.7 | sqm | 345.38 ₹34,778.38 Lowest | 345.38 ₹34,778.38 Lowest |
Tender Value
₹3.4 Cr
EMD Value
₹3.4 L
Closing Date
20 Mar 2026, 9:00 amClosed
Executive Engineer, PWD, Gensi Division
O/o the Executive Engineer Gensi Division,PWD,A.P
C/o PWD Circuit House at Siji PD Hq
2026_PWDAP_3070_1
GD/S-08/2025-26/08
Open Tender
Civil Works - Building
Item Rate
Siji
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
EE PWD Gensi
₹3.4 L
Yes
Likabali
20 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
13 Mar 2026 - 19 Mar 2026
16 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1EXCAVATION AND EARTH WORK | |||||
| 1.01 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30cm size, saturated soil and rock), lift upto 1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returing the stacked soil in 15cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. | - | cum | 413.5 | - |
| 1.02 | Re-filling excavated earth in foundations and plinth etc. in 15cm layer including ramming and watering etc. complete. | 0.2 | cum | 187.4 | ₹37.29 |
| 1.03 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 0.6 | cum | 1,008.5 | ₹605.1 |
| 1.04 | EARTH CUTTING- Site Clearance: Earth work in excavation in soils containing 50% or more of shingle or small size boulders upto 30 cm size including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions lead upto 50 m and lift upto 1.50 m. | - | cum | 203.5 | - |
| 2CONCRETE WORK | |||||
| 2.01 | Providing and laying in foundations and plinth cement concrete 1:4:8 (1 cement: 4 coarse sand : 8 graded stone aggregate 40mm nominal size) excluding the cost of centring and shuttering. | - | cum | 7,557.93 | - |
| 2.02 | Providing and laying damp proof course 38mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 12.5 mm nominal size) | 0.8 | sqm | 453.72 | ₹362.98 |
| 2.03 | Extra for providing and mixing water proofing material in cement concrete work in the proportion recommended by manufacturers. | 1 | per bag | 300.3 | ₹300 |
| 2.04 | Applying a coat of hot bitumen (mashphalte 80/100 or equivalent) using 1.70 kg. per sqm. on damp proof course after cleaing the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | 0.4 | sqm | 345.38 | ₹137.81 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_3270.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_3270.xls
BOQ • 0.40 MB
technicaldocuments.pdf
Tender Documents • 25.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .