Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 CrAccepted-AOC | ₹15.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹15.4 CrRejected-Finance | ₹15.4 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹18.6 CrRejected-Finance 67 AASANI BAS PALANA PALANA BIKANER BIKANER RAJASTHAN 334402 UDYAM RJ 08 0063520 | BIKANER | RAJASTHAN | 334402 | ₹18.6 Cr | L3 | Rejected-Finance L3 |
Tender Value
₹18.6 Cr
EMD Value
₹18.6 L
Closing Date
5 Feb 2026, 5:00 pmClosed
Chief Engineer, Buildings-II (I/c), Odisha, BBSR
O/o. the E.I.C. (Civil), Odisha, Unit-V, Nirman Soudha, Bhubaneswar.
Construction of 30 Bedded CHC Building (G plus 2) at Narayanpatna, Koraput.
2026_EICCL_124873_2
C.E. (B) - 41 / 2025-26
Open Tender
Civil Works - Buildings
Percentage
547 days
KORAPUT DIST.
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹18.6 L
Yes
21 Aug 2026
21 Jan 2026
6 Feb 2026
21 Jan 2026
5 Feb 2026
21 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORK Clearing and grubbing existing land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300mm ,removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of unserviceable materials to be used or auctioned , up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness, Complete as specification and direction of the Engineer-in-charge. | |||||
| 1.01 | Building Proper | 10,000 | Sqm | 2.8 | ₹28,000 |
| 2Excavation of Soil with hydraullic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross-section, and transporting to the embankment location if any within all lifts and lead up to 1000 mtr including the labour, machinery, loading & unloading, T&P, etc. complete as per the direction of Engineer-in-Charge. | |||||
| 2.01 | Building Proper | 58,115.84 | Cum | 75 | ₹43,58,688 |
| 3Excavation of hardrock (Blasting prohibited) with rock brakers including breaking the rock, loading in tippers, and disposal within all lifts and lead up to 1000 meters, trimming the bottom and side slope in accordance with requirement of line, grades, and cross-section including the labour, machinery, loading & unloading, T&P, etc. complete as per the direction of Engineer-in-Charge. | |||||
| 3.01 | Building Proper | 5,006.25 | Cum | 460 | ₹23,02,875 |
| 4Earth work in excavation of foundation trenches in all type of soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,labour cess,T&P,sundries etc. as directed by the Engineer in charge. | |||||
| 4.01 | Entrance Gate & Security Cabin | 130.09 | Cum | 276.9 | ₹36,021.92 |
| 4.02 | Boundary Wall | 480.75 | Cum | 276.9 | ₹1,33,119.68 |
| 4.03 | Internal Approach Road | 148.5 | Cum | 276.9 | ₹41,119.65 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
DTCN.pdf
Tender Documents • 36.24 MB
BOQ_577131.xls
BOQ • 0.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].