| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-AOC | 1 | Accepted-AOC Work awarded to L1 contractor Thiru E.Arumugam Asari,Alangulam |
Tender Value
₹5.0 L
EMD Value
₹6,300
Closing Date
8 Sept 2021, 2:00 pmClosed
SE / TEDC / Tuticorin
131,Ettaiapuram Road, Tuticorin -628002
Construction of Equipment room for keeping the materials of Video conferencing hall in roof top of the Urban South Sub Division office building along with RCC Staircase in Central office complex Tuticorin
2021_EB_208156_2
Specn. no.,10 / 2021 - 22 of SE / TEDC / Tuticorin
Open Tender
Civil Works
Item Rate
60 days
131, Ettaiapuram Road
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
SE / TEDC / Tuticorin
₹6,300
Yes
1 Apr 2022
3 Sept 2021
9 Sept 2021
3 Sept 2021
8 Sept 2021
3 Sept 2021
3 Sept 2021 - 8 Sept 2021
Amount
Dismantling the existing one course of pressed tiles and weathering course in cement mortar & clearing away from the site as directed by the engineer at site including cost of labours, lead, lift,t & p, etc.,complete.
Dismantling the existing RCC and clearing away the debrises from the site as directed by the engineer at site including cost of all labours, lead,lift, t & p,scaffolding charges, etc.,complete.
Dismantling the existing plain cement concrete and clearing away the debrises from the site as directed by the engineer at site including cost of all labours,lead,lift, t & p, scaffolding charges, etc., complete.
Earth work excavating and depositing on bank with an initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including cost of all labours, lead, lift, t & p, etc., complete.
Filling with M.Sand for filling in basement with watering and consolidation including cost of all materials,labours,lead,lift,etc., complete.
Providing PCC 1:5:10 for foundation with 40mm size machine crushed HBG metal and OPC 53 grade cement including plasticiser at the rate of 100 ml per bag of cement,all other materials,labours,lead, lift,curing,etc.,complete.
Providing centering and shuttering for RCC works upto 3m heights using M.S. sheets of size 90 x 60 cm with BG 10 guage stiffened with welded M.S. angles of size 25 x 25 x 3 mm laid over silver oak scantlings of size 10 x 6.50 cm at 90 cm c/c & supported by casurina props 10 to 13 cm. dia at 75 cm c/c complying with standard specifications including cost of all materials,labours,lead, lift,etc., complete.
Supplying & providing TMT rods including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials,labours,lead,lift, etc., complete.
Providing RCC 1:1.5:3 using 12 to 20mm machine crushed HBG metal and OPC 53 grade cement including plasticiser at the rate of 100 ml per bag of cement, all other materials, labours, lead, lift, curing, etc. complete but excluding cost of reinforcement and form work including lift charges upto 3.50 m height from floor level.
Providing RCC 1:1.5:3 using 12 to 20mm machine crushed HBG metal and OPC 53 grade cement including plasticiser at the rate of 100 ml per bag of cement, all other materials, labours,lead, lift, curing, etc., complete but excluding cost of reinforcement and form work including lift charges upto 4.50 m height from floor level.
Brick work in CM 1:5 using Fly ash bricks ( size - 230 x 110 x 70mm ) including plasticiser at the rate of 100 ml per bag of cement,all other materials, labours, lead, etc., complete.
Brick work in CM 1:5 using Fly ash bricks ( size - 230 x 110 x 70mm ) including plasticiser at the rate of 100 ml per bag of cement, all other materials, labours, lead, including lift charges upto 4.50 m height from floor level, curing, etc., complete.
Brick work in CM 1:3 using Fly ash bricks ( size - 230 x 110 x 70mm ) including plasticiser at the rate of 100 ml per bag of cement,all other materials, labours, lead, curing, etc. complete.
Ceiling plastering with OPC 53 grade cement C.M.1:3, 10 mm thick for RCC works including plasticiser at the rate of 100 ml per bag of cement,all other materials labours, lead, lift, curing, etc., complete.
Plastering in walls with OPC 53 grade cement C.M.1:5, 12 mm thick including plasticiser at the rate of 100 ml per bag of cement, all other materials,labours,lead, lift,curing,etc., complete.
Supplying & fixing in position of anodized aluminium glazed sliding window in two tracks with bottom frame gutter 61.85 x 37 mm x 1.055 kg / m and top & side 62 x 29.5 mm x 0.695 kg / m and shutter lock 39 x 20 mm x 0.605 kg / m, botom 41 x 20 mm x 0.355 kg / m, side & top 39 x 20 mm at 0.488 kg / m, 5.50 mm thk. plain glass, rubber beading, center lock including cost of all materials, labours,lead,lift,etc., complete.
Supplying, fabricating, erecting and fixing in position of Hilux (or) Equivalent Gypsum board perforated sheets 10mm thk. false ceiling arrangements to a grid work of size 1200 x 600mm, GI runners suspended from ceiling, GI perimeter channel of size 20 x 27 / 30 x 0.50mm screwed to wall with nylon sleeves & screws at 610mm c/c, GI intermediate channels of size 45 x 15 x 0.90 mm at 1220mm c/c, ceiling angle 25 x 10 x 0.55mm fixed to the soffit with GI cleat 22 x 37 mm and steel expansion fastener, ceiling section of size 80 x 26 x 0.50mm fixed to intermediate channels by connecting clip and in direction perpendicular to intermediate channel at 457 mm c/c, Gyp. board fixed to ceiling section with 25 mm dry wall screws at 230 mm c/c, filling & finishing edges of board with jointing compound, joint paper tape, puttied & painted with two coats of acrylic emulsion over a coat of primer including cost of all materials,labours,lead,lift,t & p,etc.,complete
Supplying and fixing of non slippery floor tiles of 305 x 305 x 6 mm first quality design ceramic tiles of approved colours in CM 1:3, 10 mm thick with OPC 53 grade cement including plasticiser at the rate of 100 ml per bag of cement and pointing with white cement 0.40 Kg / Sqm including cost of materials,labours, lead, lift,etc., complete.
Providing surki concrete with broken brick jelly of 40 mm size in pure slaked lime over RCC roof slab in the proportion 32:12.5 for a depth of 80mm for giving required slope and thickness to roof as required, well beaten with wooden beaters including cost of all materials, labours,lead, lift, curing,etc., complete.
Terrace flooring of one course of pressed tiles 230 x 230 x 20mm over CM 1:3, 20mm thk. with OPC 53 grade cement mixed with water proofing compound including plasticiser at the rate of 100 ml per bag of cement & mixed with crude oil 10% by weight of cement and pointing with the same cement mortar 1:3 mixed with water proofing compound & plasticiser with required slope over RCC roof slab including cost of all materials, labours, lead,lift,crude oil,curing, etc., complete.
Providing two coats of white cement over inner roof ceiling areas including cost of all materials, scaffolding charges, labours, lead, lift, etc., complete.
Providing two coats of oil bound distemper of approved quality, brand & colour for inner wall surfaces over a coat of white cement primer & Alkali Resistant distemper primer coat including cost of all materials, scaffolding charges, labours, lead, lift, etc., complete.
Providing two coats of ready mixed Plastic emulsion painting of approved colour & quality on outer walls over a coat of white cement primer & emulsion primer coat including cost of all materials,scaffolding charges, labours, lead,lift,etc.,complete.
Supply and fixing of 40 mm dia Heavy duty Ball valve including cost of other materials, lead, lift, labour charges, etc. complete as directed by the Engineer at site.
Supplying, jointing and fixing in position of 40 mm dia PVC water pipes ( ISI make ) 10 Kg / cm2 including PVC specials, cost of other materials, lead, lift, labour charges, etc. complete as directed by the Engineer at site.
Supply and fixing of 15 W LED panel ( Melon make ) Design lights complete fixed in ceiling with PVC unsheathed copper leads from terminals to the fitting.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .