Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.7 LAccepted-AOC DINDIGUL | DINDIGUL | DINDIGUL | TAMIL NADU | L1 | Accepted-AOC TENDER ACCEPTED | |
| 2 | L2₹81.8 L+₹14,801.80 (0.18%)Rejected-AOC | L2 | Rejected-AOC TENDER REJECTED |
| Sl No | Description | Qty | Unit | A RAMALINGAM CONTRACTOR L2 | VMSI CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Name of the work : 1. Strengthening the Road from Madurai road to Muthalagupatti H/o Pallapatty Estimate amount : Rs. 83.00 Lakhs | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,080 | Sqm | 8 ₹8,640 | 6 ₹6,480 Lowest |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 1,263.5 | Sqm | 24 ₹30,324 | 23.3 ₹29,439.55 Lowest |
| 4.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 435 | Sqm | 141 ₹61,335 | 140.4 ₹61,074 Lowest |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 568.58 | cum | 2,777 ₹15,78,946.66 | 2,770.3 ₹15,75,137.17 Lowest |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 3,790.5 | Sqm | 87 ₹3,29,773.5 | 85.76 ₹3,25,073.28 Lowest |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 3,790.5 | Sqm | 20 ₹75,810 | 19.9 ₹75,430.95 Lowest |
| 8.00 | Bituminous Macadam to 50mm thick (Grade - I) Using VG30 & Plastic Waste Providing and laying Bituminous Macadam to 50mm thick using 0.20 cum of 26.5-13.20mm,0.43 cum of 13.20-2.36mm and 0.26cum of 2.96 & below IRC HBG metal with 58.66 kgs of VG30 bitumen with 3.74kg of Plastic Waste for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH. | 189.53 | Sqm | 9,436.99 ₹17,88,592.71 | 9,436.9 ₹17,88,575.66 Lowest |
| 9.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 94.77 | Sqm | 11,961.2 ₹11,33,562.92 | 11,961 ₹11,33,543.97 Lowest |
| 10.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 225 | cum | 342 ₹76,950 | 341 ₹76,725 Lowest |
Tender Value
₹83 L
EMD Value
₹83,000
Closing Date
24 Nov 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer (BP)
Block Development Officer (BP)
MLACDS 2025-26 Madurai road to Muthalagupatti H/o Pallapatty
2025_RDTN_620285_1
MLACDS 2025-26 Madurai road to Muthalagupatti H/o Pallapatty
Open Tender
Civil Works
Works
MLACDS 2025-26 Madurai road to Muthalagupatti H/o
MLACDS 2025-26 Madurai road to Muthalagupatti H/o Pallapatty
4 documents required · 4 mandatory
₹0
₹83,000
Yes
Panchayat Union Office Dindigul
17 Feb 2026
5 Nov 2025
24 Nov 2025
5 Nov 2025
24 Nov 2025
5 Nov 2025
21 Nov 2025
Amount
Name of the work : 1. Strengthening the Road from Madurai road to Muthalagupatti H/o Pallapatty Estimate amount : Rs. 83.00 Lakhs
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Bituminous Macadam to 50mm thick (Grade - I) Using VG30 & Plastic Waste Providing and laying Bituminous Macadam to 50mm thick using 0.20 cum of 26.5-13.20mm,0.43 cum of 13.20-2.36mm and 0.26cum of 2.96 & below IRC HBG metal with 58.66 kgs of VG30 bitumen with 3.74kg of Plastic Waste for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH.
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Road Marking without applied Thermoplastic compound with Reflector Glass based on Bitumenous Surface
Construction of Retaining wall
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete for 10m3
Supplying and Erecting Centering for Drainage side with cost and conveyance of all materials and all labour charges etc., completed.
CC 1:3:6 mix using 40 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Construction of Pipe Culvert CH 0/030
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete for 10m3
CC 1:3:6 mix using 40 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Providing and laying Reinforced cement concrete pipe NP3 as per design in double row providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation ,protection works, backfilling, concrete and masonry works in head walls and parapets clause 1106
Refilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause 1204.3.8. Refilling with well gravely including labour for laying , filling watering including all leads for good water even if the season is worst drought, compacting and all other labour charges for ramming and all other incidental charges etc.,complete
Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete.
Supply of Kilometre stone of size 1.65m x 0.45 x 0.15m including all charges etc.,
Supply of Hectametre stone of size 0.90 x 0.15 x 0.15 metre
Provision for Name board cum Citizen Information Board
Provision for 60 cm Equilateral triangle cautionary Sign Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
A RAMALINGAM CONTRACTOR (BID ID -1514106)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.16 MB
Document
0.35 MB
Document
0.60 MB
BOQ
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .