Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹6.6 L+₹1.5 L (28.4%)Accepted-Finance | L2 | Accepted-Finance Admitted | |
| 3 | L3₹6.7 L+₹1.5 L (29.8%)Accepted-Finance | L3 | Accepted-Finance Admitted | |
| 4 | Rejected-Technical 307 D 211 B STREET MUNIRKA SOUTH WEST DELHI DELHI 110067 | NEW DELHI | DELHI | 110067 | - | Rejected-Technical Tehnically not Qualified | |
| 5 | Rejected-Technical B40 MEGAMAX HOUSE NOIDA SEC 57 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | - | Rejected-Technical Technically not Qualified |
| Sl No | Description | Qty | Unit | SYNCLAIRE POWER SYSTEMS L2 | SRI SAI LEELA ELECTRICAL PROJECTS L3 | Hindustan System L1 |
|---|---|---|---|---|---|---|
| 1.001) The estimated amount is inclusive of GST. 2) The Bidder should quote basic rates exclusive of GST and quote GST percentage separately. GST should be revised from time to time. | ||||||
| 2.00 | Supply, Installation, testing and commissioning of 50kW Solar system
a) on grid Power Conditioning Unit (PCU) / Solar inverter of 420-700 V DC Input Voltage range and 400 V AC, Three phase, 4 wire, 50 Hz+/- 2.5 Hz, output voltage suitable to generate AC power with efficiency not less than 97%, total harmonic distortion less than 3%, with IP65 protection rating, having 15 quick Input connections + fuses (both poles) + DC switch + surge arresters Type 2 in both DC and AC sides and suitable for ambient temperature form 0 to 50 degree C.
b) Data Monitoring system complete with accessories.
c) The PCU shall adjust the Voltage and frequency level to suit the Grid Voltage Frequency, and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc as required. | 2 | Nos | 2,63,000 ₹5,26,000 | 2,76,000 ₹5,52,000 | 2,04,000 ₹4,08,000 Lowest |
| 3.00 | Supply ,Transportation and installation of 320Wp PV Modules or equivalent wattage of 3200 Wp (Total 10 Nos) | 10 | Nos | 8,950 ₹89,500 | 10,000 ₹1,00,000 | 7,680 ₹76,800 Lowest |
| 4.00 | Dismantling of Inverter | 2 | Nos | 14,500 ₹29,000 | 5,000 ₹10,000 Lowest | 10,000 ₹20,000 |
| 5.00 | Dismantling of existing Solar PV Modules and removing from UoH Campus | 10 | Nos | 1,650 ₹16,500 | 628.35 ₹6,283.5 Lowest | 1,000 ₹10,000 |
Tender Value
₹7.8 L
EMD Value
₹15,545
Closing Date
28 Oct 2025, 3:00 pmClosed
Executive Engineer
UWD, Admin Bldg., UoH, Hyd 046
Replacement of 50Kw online Solar Inverters (02 Nos) and PV Modules in UoH campus
2025_UoH_881224_1
UH/ENGG/UWD/2025-26/06
Open Tender
Electrical Works
Item Rate
90 days
University of Hyderabad, Hyderabad
Please refer as per tender document
7 documents required · 7 mandatory
₹0
₹15,545
Yes
12 Nov 2025
13 Oct 2025
29 Oct 2025
13 Oct 2025
28 Oct 2025
13 Oct 2025
13 Oct 2025 - 28 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
50kwsec.pdf
Tender Documents • 1.34 MB
BOQ_926262.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .