Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹10.2 L+₹5,257.81 (0.52%)Rejected-AOC | L2 | Rejected-AOC REJECTED |
Tender Value
₹10.2 L
EMD Value
₹11,000
Closing Date
4 Oct 2024, 3:00 pmClosed
The Bdo Kelamangalam
The Bdo Kelamangalam
KRISHNAGIRI DISTRICT KELAMANGALAM BLOCK SIDS 2024 25 KLMG 001 1.REPAIRS AND RENOVATION OF PUP SCHOOL BUILDING 1 at DHADIKAL VILLAGE 2 REPAIRS AND RENOVATION OF PUP SCHOOL BUILDING 2 at DHADIKAL VILLAGE H O RATHINAGIRI PACKAGE AMT.RS.10.21 LAKHS
2024_RDTN_489154_1
1102/2024/A6
Open Tender
Civil Works
Item Rate
KELAMANGALAM
KRISHNAGIRI DISTRICT KELAMANGALAM BLOCK SIDS 2024 25 KLMG 001 1.REPAIRS AND RENOVATION OF PUP SCHOOL BUILDING 1 at DHADIKAL VILLAGE 2 REPAIRS AND RENOVATION OF PUP SCHOOL BUILDING 2 at DHADIKAL VILLAGE H O RATHINAGIRI PACKAGE AMT.RS.10.21 LAKHS
3 documents required · 3 mandatory
₹0
₹11,000
The Bdo Office,kelamangalam
14 Nov 2024
28 Sept 2024
4 Oct 2024
28 Sept 2024
4 Oct 2024
28 Sept 2024
30 Sept 2024
Amount
1. REPAIRS AND RENOVATION OF PUP SCHOOL BUILDING 2 @ DHADIKAL VILLAGE H/O RATHINAGIRI Est Amt Rs.5.02 /- Lakhs Package Amt.Rs.10.21 lakhs
Towards chipping and roughening the concrete surfaces including all cost and conveyance of men and materials
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Towards chipping and roughening the concrete surfaces including all cost and conveyance of men and materials
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
BALA PAINTING
Towards drawing Bala painting including all cost and conveyance of men and materials etc.,(the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Verandah Wall painting with pictures of various modes of transports, traffic symbols and multiplication tables with names both Tamil and English
Ceiling with Solar system painting including scaffolding charges, glitter paints, brushesetc., including all cost and conveyance of men and materials etc., all complete
Towards drawing clock dial with movable longer and shorter arm fixed with central achor nail inlcuding all cost and conveyance of men and materials etc.,
Towards drawing ENNUM EZHUTHUM logo inlcuding all cost and conveyance of men and materials etc.,
Providing for Name Board Charges etc.,
2. REPAIRS AND RENOVATION OF PUP SCHOOL BUILDING 1 @ DHADIKAL VILLAGE H/O RATHINAGIRI Est Amt Rs.5.19 /- Lakhs
Towards chipping and roughening the concrete surfaces including all cost and conveyance of men and materials
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Towards chipping and roughening the concrete surfaces including all cost and conveyance of men and materials
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
BALA PAINTING
Towards drawing Bala painting including all cost and conveyance of men and materials etc.,(the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Longer wall
Verandah Wall painting with pictures of various modes of transports, traffic symbols and multiplication tables with names both Tamil and English
Ceiling with Solar system painting including scaffolding charges, glitter paints, brushesetc., including all cost and conveyance of men and materials etc., all complete
Towards drawing clock dial with movable longer and shorter arm fixed with central achor nail inlcuding all cost and conveyance of men and materials etc.,
Towards drawing ENNUM EZHUTHUM logo inlcuding all cost and conveyance of men and materials etc.,
Supply and run of 2 of 1.5 sq.mm. (22 / 0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in suitable PVC rigid pipe on wall and ceiling with continuous earth wire connection 14 SWG TC wire with painting of suitable colour connection by means of 1.50 sqmm PVC insulated single core unsheathed copper conductor cable confirming to IS:694/1990 in suitable PVC rigid pipe 1.8mm thick concealed in wall for mains including the cost of PVC pipes and specials, cables, cement, brass screws, T.W plugs, saddles and labour etc., complete in all respects as directed by the departemental officers. (derived from SD 54) continious earth connection by means of 1.50 sqm PVC insulated single core unsheathed copper
Plug point SD 13
Meter Box cover
Providing & fixing PVC RAIN WATER DOWNFALL PIPE of the following dia with necessary T.W.Clamps Plugs, Shoes,Bemds, other clamps, screws nails etc.,complete complying with standard specification. The rate is inclusive of cost of removable iron gratings of appropriate size. The size of Teak Wood plugs used is 150X25mm in front & 200x75mm in rear (wall side) with a depth of 110mm. The pipe is to be fixed by means of "U" clamps at the centre of pipes to be fixed.110mm dia PVC Pipe [4 Kg/SqCm]
Towards the cost of Chappal Rack outside the class room
String Bandal
Providing for Name Board Charges etc.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SAKTHI BUILDERS (BID ID -1154618)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .