Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹94.0 L+₹2.3 L (2.50%)Admitted-Finance PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | L2 | Admitted-Finance | |
| 3 | L3₹97.8 L+₹6.1 L (6.61%)Admitted-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | L3 | Admitted-Finance | |
| 4 | L4₹1.1 Cr+₹22.0 L (24.0%)Admitted-Finance NO 9 CHAIRMAN JANAGARAJ STREET SRI RAGAVENDHRA GARDEN ALAMELUPURAM VILLUPURAM 605 602 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605602 | L4 | Admitted-Finance | |
| 5 | Rejected-Technical NO 172 VAZHAPANTAL ROAD STREET MAMBAKKAM ARCOT TALUK VELLORE DIST 632 318 | MAMBAKKAM | ARCOT TALUK | TAMIL NADU | 632318 | - | Rejected-Technical BQR NOT SATISFIED |
| Sl No | Description | Qty | Unit | K S CONSTRUCTION L2 | MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED L3 | K.S.MANJU L4 | H.Venkateswaran L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil and depositing on bank with initial lead of 10m and lift of 2m etc. | 166 | m3 | 150 ₹24,900 | 250 ₹41,500 | 333.33 ₹55,332.78 | 100 ₹16,600 Lowest |
| 2.00 | Sand filling including cost of sand, filling charges, labour for watering and consolidation leads and lift etc., complete. | 14.5 | m3 | 1,000 ₹14,500 | 1,000 ₹14,500 | 2,222.22 ₹32,222.19 | 500 ₹7,250 Lowest |
| 3.00 | Plain Cement Concrete 1:3:6 using 20mm HBG stone including cost of all materials, labour, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site . | 14.5 | m3 | 5,000 ₹72,500 | 5,000 ₹72,500 | 8,888.88 ₹1,28,888.76 | 4,000 ₹58,000 Lowest |
| 4.00 | R:C:C 1:1.5:3 using 12 to 20mm metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site | 25.5 | m3 | 6,500 ₹1,65,750 | 5,900 ₹1,50,450 Lowest | 9,999.99 ₹2,54,999.75 | 6,000 ₹1,53,000 |
| 5.00 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site-Wall | 22.5 | m3 | 12,000 ₹2,70,000 | 7,500 ₹1,68,750 | 11,111.11 ₹2,49,999.98 | 6,000 ₹1,35,000 Lowest |
| 6.00 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site-Cover Slab | 7.5 | m3 | 10,000 ₹75,000 | 10,000 ₹75,000 | 22,222.22 ₹1,66,666.65 | 6,000 ₹45,000 Lowest |
| 7.00 | Supplying, fabricating and placing in position of steel reinforcements including cost of steel,binding wire, labour, lead, lift etc complete as per standard specification and as directed by the dept. Engineer at site | 3.5 | MT | 55,000 ₹1,92,500 | 45,000 ₹1,57,500 Lowest | 88,888.88 ₹3,11,111.08 | 60,000 ₹2,10,000 |
| 8.00 | P:C:C 1:2:4 using 12 to 20mm HBG metal without form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site | 8 | m3 | 5,000 ₹40,000 | 5,000 ₹40,000 | 8,888.88 ₹71,111.04 | 4,000 ₹32,000 Lowest |
| 9.00 | P.C.C 1:2:4 using 12 to 20mm HBG stone for plinths with form work including cost of form work, all materials, curing, labour, lead,and lift etc. complete. as per standard specification as directed by the dept. Engineer at site | 47.5 | m3 | 6,500 ₹3,08,750 | 5,000 ₹2,37,500 | 9,999.99 ₹4,74,999.53 | 4,500 ₹2,13,750 Lowest |
| 10.00 | Fabriaction, galvanising and supply of foundation bolt and nuts with 2 nos. washer in High Tensile Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site. | 406.5 | Kgs | 125 ₹50,812.5 Lowest | 150 ₹60,975 | 222.22 ₹90,332.43 | 150 ₹60,975 |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
20 Nov 2023, 2:30 pmClosed
CE/TP-I/CNI
Guindy 230kV GIS SS Campus Guindy - 32
Supply fabrication and erection of lattice equipment structures providing equipment and structure plinths for the proposed Vembakkam 230 110 KV SS in the premises of the existing Vembakkam 110 KV SS
2023_EB_386603_1
TP1-60/2023-24
Open Tender
Civil Works - Others
Works
120 days
Vembakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.2 L
Yes
6 Feb 2024
7 Nov 2023
21 Nov 2023
7 Nov 2023
20 Nov 2023
7 Nov 2023
Amount
Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil and depositing on bank with initial lead of 10m and lift of 2m etc.
Sand filling including cost of sand, filling charges, labour for watering and consolidation leads and lift etc., complete.
Plain Cement Concrete 1:3:6 using 20mm HBG stone including cost of all materials, labour, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site .
R:C:C 1:1.5:3 using 12 to 20mm metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site-Wall
R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site-Cover Slab
Supplying, fabricating and placing in position of steel reinforcements including cost of steel,binding wire, labour, lead, lift etc complete as per standard specification and as directed by the dept. Engineer at site
P:C:C 1:2:4 using 12 to 20mm HBG metal without form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site
P.C.C 1:2:4 using 12 to 20mm HBG stone for plinths with form work including cost of form work, all materials, curing, labour, lead,and lift etc. complete. as per standard specification as directed by the dept. Engineer at site
Fabriaction, galvanising and supply of foundation bolt and nuts with 2 nos. washer in High Tensile Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site.
Fabrication of Template and assembling in correct position for various equipment plinth and grouting the foundation bolts including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Fabrication and supply of GI Tower Parts, inluding stub & cleats as per specification including cost of all materials, labour, leads and lifts etc., complete. GI – Tower Parts & Extenstions.
Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size).
Labour charges for transporting and erection of towers with bolt nut including sorting out of tower parts tightening, punching of bolts and nuts and rectification of defects if any during erection, cost of lead lift labour etc complete.
Plastering in CM 1:5 12 mm thick including cost of all materials, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site
Colour washing two coats using Exterior emulsion paint over one coat of white washing including cost of all materials, colur pigments labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site
Gravel Filling including cost of gravel, transport charges, spreading and consolidation of each layer 300 mm with power roller, labour, lead, lift etc., complete. as directed by dept. Engineer at Site
Filling with stone dust including cost of metal, labour all lead and lift etc., Complete.
Filling with 20 mm B.G metal including cost of metal, labour all lead and lift etc., Complete.
Providing and laying PVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. - 32mm Dia PVC Pipe
Providing and laying PVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. - 25mm Dia PVC Pipe
Providing and laying PVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. - 20mm Dia PVC Pipe
Providing and fixing wheel valve of various diameter of Gun metal made including cost of all materials, labour, lead and lift etc., complete. - 32mm Dia
Providing and fixing wheel valve of various diameter of Gun metal made including cost of all materials, labour, lead and lift etc., complete. - 25mm Dia
Providing and fixing PVC tap including cost of all materials, labour, lead and lift etc., complete. - 25mm Dia
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
K S CONSTRUCTION
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED
K.S.MANJU
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_460779.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .