| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.9 LAccepted-AOC | L1 | Accepted-AOC Quoted the lowest rate | |
| 2 | L2₹46.9 L+₹500 (0.01%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Nitin Agarwalla L2 | Rohit Agarwalla L1 |
|---|---|---|---|---|---|
| 1.00i)At Basapathar Heavy Dressing | |||||
| 2.00 | Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer | 3,007.5 | Sqm | 8.27 ₹24,872.03 Lowest | 8.27 ₹24,872.03 Lowest |
| 3.00 | Gravel/Soil-Aggregregate course (table 400.3)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 | 375.94 | Cum | 1,756.8 ₹6,60,451.39 Lowest | 1,756.8 ₹6,60,451.39 Lowest |
| 4.00 | Maintenance of Earthen shoulder (filling withfresh selected soil)
Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 | 600 | Sqm | 83.28 ₹49,968 Lowest | 83.28 ₹49,968 Lowest |
| 5.00 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 23.85 | Cum | 127.69 ₹3,045.41 Lowest | 127.69 ₹3,045.41 Lowest |
| 6.00 | Laying 1st class bedding on well compacted sand, moorum as per clause 115(ii)Granular bedding | 5.73 | Cum | 1,558.04 ₹8,927.57 Lowest | 1,558.04 ₹8,927.57 Lowest |
| 7.00 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 600mm dia. | 15 | Rm | 3,272.25 ₹49,083.75 Lowest | 3,272.25 ₹49,083.75 Lowest |
| 8.00 | Backfilling in Foundation Trenches as per drawing and technical specification Clause 1108. (I) sand filling | 21.45 | Cum | 1,644.26 ₹35,269.38 Lowest | 1,644.26 ₹35,269.38 Lowest |
| 9.00 | ii) At 1 No Rajapukhuri approach
Heavy Dressing
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer | 3,007.5 | Sqm | 8.27 ₹24,872.03 Lowest | 8.27 ₹24,872.03 Lowest |
| 10.00 | Gravel/Soil-Aggregregate course
(table 400.3)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 | 375.94 | Cum | 1,799.9 ₹6,76,654.41 Lowest | 1,799.9 ₹6,76,654.41 Lowest |
Tender Value
₹46.9 L
EMD Value
₹93,840
Closing Date
1 Dec 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
O/o the EE, PWRD, Sarupathar TRD
Improvement of Earthen Road i) At Basapathar, ii) At 1 No Rajapukhuri approach, iii) New Rajapukhuri to Bilgaon, iv) No 3 Santipur to Yampha, v) At Uriamghat Wabari, vi) At Jonakipathar, with Gravel Wearing Course (GWC) for the year 25-26
2025_PWD_48511_1
PWD/SPR/SOPD/01/2025/01
Open Tender
Civil Works – Roads
Item Rate
Sarupathar
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,400
₹93,840
O/o the EE, PWRD, Sarupathar TRD
28 Jan 2026
11 Nov 2025
1 Dec 2025
11 Nov 2025
1 Dec 2025
18 Nov 2025
11 Nov 2025 - 1 Dec 2025
17 Nov 2025
Amount
i)At Basapathar Heavy Dressing
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities, removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Gravel/Soil-Aggregregate course (table 400.3) Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Laying 1st class bedding on well compacted sand, moorum as per clause 115(ii)Granular bedding
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 600mm dia.
Backfilling in Foundation Trenches as per drawing and technical specification Clause 1108. (I) sand filling
ii) At 1 No Rajapukhuri approach Heavy Dressing Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Gravel/Soil-Aggregregate course (table 400.3) Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Laying 1st class bedding on well compacted sand, moorum as per clause 115(ii)Granular bedding
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 600mm dia.
Backfilling in Foundation Trenches as per drawing and technical specification Clause 1108. (I) sand filling
iii) New Rajapukhuri to Bilgaon Heavy Dressing Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Gravel/Soil-Aggregregate course (table 400.3) Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Laying 1st class bedding on well compacted sand, moorum as per clause 115(ii)Granular bedding
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 600mm dia.
Backfilling in Foundation Trenches as per drawing and technical specification Clause 1108. (I) sand filling
iv) No 3 Santipur to Yampha Heavy Dressing Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Gravel/Soil-Aggregregate course (table 400.3) Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Laying 1st class bedding on well compacted sand, moorum as per clause 115(ii)Granular bedding
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 600mm dia.
Backfilling in Foundation Trenches as per drawing and technical specification Clause 1108. (I) sand filling
v) Uriamghat Wabari Heavy Dressing Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Gravel/Soil-Aggregregate course (table 400.3) Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
vi) At Jonakipathar Heavy Dressing Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Gravel/Soil-Aggregregate course (table 400.3) Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Nitin Agarwalla (BID ID -286806)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
Tendernotice_2.pdf
PDF • 8.15 MB
Tendernotice_3.pdf
PDF • 0.54 MB
BOQ_77084.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .