Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC below |
| 2 | L2₹2.6 Cr+₹41.2 L (18.7%)Rejected-Finance | ₹2.6 Cr+₹41.2 L (18.7%) | L2 | Rejected-Finance high |
| 3 | L3₹2.7 Cr+₹50.2 L (22.8%)Rejected-Finance | ₹2.7 Cr+₹50.2 L (22.8%) | L3 | Rejected-Finance high |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
Tender Value
₹3.1 Cr
EMD Value
₹17.4 L
Closing Date
19 Mar 2026, 12:00 pmClosed
SE Banda Circle, PWD, Banda
Office of SE Banda Circle, PWD, Banda
Special repair work at Km. 1, 2 and 3 (500) of J.M. Biyawal to Sikrau link road
2026_CEBAN_1123873_1
1153/35 C-Banda Circle/2025-26 Date 10-03-2026
Open Tender
Civil Works
Fixed-rate
150 days
Chitrakoot
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
₹17.4 L
Office of SE Banda Circle, PWD, Banda
8 Apr 2026
11 Mar 2026
19 Mar 2026
11 Mar 2026
19 Mar 2026
11 Mar 2026
13 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 265.54 | Cum | 2,928 | ₹7,77,501.12 |
| 2 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 937.5 | Cum | 4,317.8 | ₹40,47,937.5 |
| 3 | Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 | 2,531.25 | Cum | 7,195.4 | ₹1,82,13,356.25 |
| 4 | Construction of embankment with approved material of obtained from borrowpit with a lift 1.5m transporting to site spreading, grading to required slope and compacting to wet requirement of table 300.1 (For Patri) | 5,388.17 | Cum | 88 | ₹4,74,158.96 |
| 5 | Providing Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread soil in place with Soil Stabilizer with 2 per cent slaked lime manually spread having minimum content of 70 per cent of CaO, grading with motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved sub grade | 4,153.25 | Cum | 335 | ₹13,91,338.75 |
| 6 | Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 8:4:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. SI No 281 | 27.85 | Cum | 4,200 | ₹1,16,970 |
| 7 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60metres. SI No. 692 | 105 | Cum | 350 | ₹36,750 |
| 8 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. SI No. 251 | 1,070.5 | Cum | 120 | ₹1,28,460 |
| 9 | Sand filling in plinth including supply of necessary quantity of sand the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. S.I.No. 255 | 54.5 | Cum | 1,000 | ₹54,500 |
| 10 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. SI No. 280 | 43.08 | Cum | 4,400 | ₹1,89,552 |
stage.html
html • 0.05 MB
technical_2094120.pdf
techsummary_2094120.pdf
finance_2094120.pdf
BOQ Comparative Chart
xlsx
finsummary_2094120.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_2094120.xls
BOQ • 0.37 MB
T2jmbiyawal.pdf
Tender Documents • 2.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .