Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC | ₹10.6 L Quoted ₹9.0 L | L1 | Accepted-AOC 1st Lowest amount |
| 2 | L2₹9.5 L+₹56,749.84 (6.33%)Rejected-Finance 0 ATMA PRAKASH BALUAGHAT SADAR JAUNPUR UTTAR PRADESH 222001 | JAUNPUR | UTTAR PRADESH | 222001 | ₹9.5 L+₹56,749.84 (6.33%) | L2 | Rejected-Finance 2nd Lowest amount |
| 3 | L3₹10.6 L+₹1.6 L (18.4%)Rejected-Finance | ₹10.6 L+₹1.6 L (18.4%) | L3 | Rejected-Finance 3rd Lowest amount |
| 4 | Rejected-Technical GRAM DATTOLI MUGHAL POST BEHDA SANDAL SINGH SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | - | - | Rejected-Technical document not ok |
| 5 | Rejected-Technical | - | - | Rejected-Technical document not ok |
Tender Value
₹14.2 L
EMD Value
₹1.2 L
Closing Date
26 May 2026, 3:00 pmClosed
E.O.
NPP Jaunpur
Civil work 1
2026_DOLBU_1149839_1
374/8-Nirman
Open Tender
Civil Works
Percentage
NPP Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,924
E.O.
₹1.2 L
15 Sept 2026
19 May 2026
26 May 2026
19 May 2026
26 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth up to a distance of 30m. from the foundation trenches including all T&P. Si no.-251 | 626.28 | Cum | 189 | ₹1,18,366.92 |
| 2 | Construction of granular sub base by providing coarse graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and conpacting with roller to achive desired density including all complete. | 34.65 | Cum | 2,431.4 | ₹84,248.01 |
| 3 | M-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants.ect. required for proper completion of work. SI No.-305B | 9.94 | Cum | 6,805.4 | ₹67,645.68 |
| 4 | Providing and laying Plaster in 1:4 including all complete | 45 | sqm | 175.5 | ₹7,897.5 |
| 5 | Barracading arragment woprk all item bamboo balli including all complete | 20 | nos | 1,000 | ₹20,000 |
| 6 | Sand filling in base of sewer pipe np3 including all complete | 30.85 | sqm | 850 | ₹26,222.5 |
| 7 | Supply and laying 450 mm dia RCC pipe np3 including collares jointed mixture of cement mortor including all complete | 125 | Rmt | 2,100 | ₹2,62,500 |
| 8 | Supply and laying 600 mm dia RCC pipe np3 including collares jointed mixture of cement mortor including all complete | 55 | Rmt | 3,200 | ₹1,76,000 |
| 9 | Construction of brick masonary R.C.C. Hume pipe 1.56m internal dia at and 0.90 dia at top in cement mortar 1:4 in side cement plaster in 1:3 in fondation including all complete | 12 | nos | 21,500 | ₹2,58,000 |
| 10 | Supply and laying 350 mm dia RCC pipe np3 including collares jointed mixture of cement mortor including all complete | 30 | Rmt | 1,600 | ₹48,000 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.46 MB
BOQ_2152948.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .