Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-Finance 110059 NEW DELHI NATIONAL CAPITAL TERRITORY OF DELHI 110059 | WEST DELHI | DELHI | 110059 | ₹2.8 L | L1 | Accepted-Finance Being L1 |
| 2 | L2₹3.0 L+₹19,190 (6.86%)Rejected-Finance | ₹3.0 L+₹19,190 (6.86%) | L2 | Rejected-Finance Other than L1 |
| 3 | L3₹3.0 L+₹19,650 (7.02%)Rejected-Finance | ₹3.0 L+₹19,650 (7.02%) | L3 | Rejected-Finance Other than L1 |
| 4 | L4₹3.0 L+₹21,200 (7.58%)Rejected-Finance AMAN NAGAR STREET NO 2 OLD CANTT ROAD FARIDKOT 151203 PB | FARIDKOT | FARIDKOT | PUNJAB | 151203 | ₹3.0 L+₹21,200 (7.58%) | L4 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | Vinod Kumar Bajaj L2 | M/S BSS AND SONS L3 | V R TRADERS L1 | GOURAV M ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | 1.1 Technician & equipment charges for draining of transformer oil from transformer into separate container via filtration plant and subsequent loading at site and unloading at workshop.
1.2 M&L for replacement of three HV/ LV limb strips/coil double paper cover (DPC) insulation ( approx wt LV 72kg and HV 105 kg) as per specification including replacement of burnt copper strip ( approx 20 Kg) of 11/0.433 KV transformer of capacity 250 KVA & and baking of core and winding assembly, dehydration and filteration of transformer oil, application of heat resistant paint inside the tank , replacement of gaskets complete to achieve designed voltage ratio all as per manufactures instruction complete and conduction of following routine test as per IS 2026 (Part I) -1977 at repairing workshop having NABL Lab accredition and valid calibration of test equipments :-
(i) Measurement of winding resistance.
(ii) Measurement of voltage ratio and check of voltage vector relationship.
(iii) Measurement of impedance voltage/short circuit impedance (principal tapping) and load loss .
(iv) Measurement of no load loss and current.
(v) Measurement of insulation resistance,
(vi) Dielectric tests of oil
(vii) Oil pressure test
(viii) Double voltage and double frequency test
(ix) Magnetic Balance test
1.3 Transportation charges from Faridkot to Bathinda Workshop and return after repair.
1.4 Installation & commisioning at site | 1 | Each Job | 2,98,990 ₹2,98,990 | 2,99,450 ₹2,99,450 | 2,79,800 ₹2,79,800 Lowest | 3,01,000 ₹3,01,000 |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
22 Aug 2026, 6:00 pmClosed
GE FARIDKOT
GE FARIDKOT MIL STN
REPAIR AND MAINT OF DISTRIBUTION TRANSFORMER 11/0 433 KV 250 KVA UNDER GE FARIDKOT
2026_MES_783904_2
3010/FDK-01/2026-27/E3
Limited
Electrical and Maintenance Works
Works
90 days
GE FARIDKOT
As Per Terms and Conditions
5 documents required · 5 mandatory
₹0
₹6,000
Yes
25 Aug 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
22 Aug 2026
12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.1 Technician & equipment charges for draining of transformer oil from transformer into separate container via filtration plant and subsequent loading at site and unloading at workshop.
1.2 M&L for replacement of three HV/ LV limb strips/coil double paper cover (DPC) insulation ( approx wt LV 72kg and HV 105 kg) as per specification including replacement of burnt copper strip ( approx 20 Kg) of 11/0.433 KV transformer of capacity 250 KVA & and baking of core and winding assembly, dehydration and filteration of transformer oil, application of heat resistant paint inside the tank , replacement of gaskets complete to achieve designed voltage ratio all as per manufactures instruction complete and conduction of following routine test as per IS 2026 (Part I) -1977 at repairing workshop having NABL Lab accredition and valid calibration of test equipments :-
(i) Measurement of winding resistance.
(ii) Measurement of voltage ratio and check of voltage vector relationship.
(iii) Measurement of impedance voltage/short circuit impedance (principal tapping) and load loss .
(iv) Measurement of no load loss and current.
(v) Measurement of insulation resistance,
(vi) Dielectric tests of oil
(vii) Oil pressure test
(viii) Double voltage and double frequency test
(ix) Magnetic Balance test
1.3 Transportation charges from Faridkot to Bathinda Workshop and return after repair.
1.4 Installation & commisioning at site | 1 | Each Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
TENDERDOC.pdf
Tender Documents • 0.37 MB
BOQ_878327.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .