Loading…
Loading…
Tender Value
₹80,000
EMD Value
₹2,400
Closing Date
14 Jul 2026, 6:00 pm6d left
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O X-ING NEAR HO FAROOQ AH. SHEIKH AT WARD NO. 02 BLOCK QAZIGUND
2026_RDPR_314901_14
ENIT54of2026-27
Open Tender
Civil Works
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹2,400
7 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site clearance by way of surface dressing/excavation, desilting removing of dumped garbage cutting of bushes /vegetation, dismentilling , and other obst. By Labours (sub to actual). | - | No. | - | - |
| 0.0 | Earthwork in excavation by manual means in trenches for foundations etc (not exceeding 1.5m in width) and not exceeding 10 sqm on plan,depth upto 1.5m including disposal of excavated earth upto 1m from cutting edge,disposed earth to be levelled and neatly dressed. | - | cum | - | - |
| 0.0 | P/L in position of stone soling/ nallah muck filling of tightly hand packed by tamping Including all carriages | - | cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) | - | cum | 1 | - |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 0.0 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement using M20 mix. (1:1.5:3) and by using 20 mm down aggregates. | 1 | cum | 1 | ₹1 |
| 0.0 | Reinforcement for RCC work incd.straightening,bending,cutting,placing in position and binding all complete, hot rolled deformed bars | - | Kg | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work | - | Sqm | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work | 1 | Sqm | - | - |
| 0.0 | carriage of materials by M.T | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_1020201.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid