Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.4 LAccepted-AOC | ₹35.4 L | L1 | Accepted-AOC Qualified in Quoted Rate |
| 2 | L2₹40.3 L+₹4.9 L (13.7%)Rejected-Finance | ₹40.3 L+₹4.9 L (13.7%) | L2 | Rejected-Finance Not Qualified in Quoted Rate |
| 3 | L3₹41.8 L+₹6.3 L (17.9%)Rejected-Finance | ₹41.8 L+₹6.3 L (17.9%) | L3 | Rejected-Finance Not Qualified in Quoted Rate |
| 4 | L5₹46.1 L+₹10.7 L (30.1%)Rejected-Finance AT PO NAYAKGUDA DIST MALKANGIRI 764044 | NAYAKGUDA | MALKANGIRI | ODISHA | 764044 | ₹46.1 L+₹10.7 L (30.1%) | L5 | Rejected-Finance Not Qualified in Quoted Rate |
| 5 | L5₹46.1 L+₹10.7 L (30.1%)Rejected-Finance | ₹46.1 L+₹10.7 L (30.1%) | L5 | Rejected-Finance Not Qualified in Quoted Rate |
Tender Value
₹57.6 L
EMD Value
₹57,630
Closing Date
29 Jun 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, MALKANGIRI
Special Repair to L050-Sariapalli to Banguru ( Boxcell Culvert (1x6x3)) 2 nos in the District of Malkangiri for the year 2026-27
2026_CERWI_132053_1
02/RWD-I,MKG/2026-27
Open Tender
Civil Works - Roads
Percentage
60 days
Malkangiri
GST,PANCARD,VALID REGN,AFFIDEVIT CORRECTNESS,REGARDING NO RELATION CERTIFICATE
2 documents required · 2 mandatory
₹10,000
₹57,630
Yes
14 Aug 2026
12 Jun 2026
30 Jun 2026
12 Jun 2026
29 Jun 2026
12 Jun 2026
12 Jun 2026 - 25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil with all leads & lifts including dressing the sides & leveling the bed of the foundation to the required width & required depth including shoring shuttering, propping bullah, pilling, dewatering from foundation supplying & working of pumps including hire & running charges of pumps & all machineries required for the work & providing coffer dam if required & stacking the excavated materials away from the working areas with Cess complete as per specification & direction of the Engineer-in-charge. | 544.58 | cum | 282.88 | ₹1,54,050.79 |
| 2 | Providing & filling good clean river sand of approved quality including watering to complete saturation & ramming complete including cost conveyance, royalty, additional charges, DMF 10% & EMF 5% over royalty Cess & taxes of all materials & cost of all labour & T&P required for the work etc complete as per specification & direction of Engineer-in Charge. | 466.5 | cum | 719.82 | ₹3,35,796.03 |
| 3 | Providing Plain Cement concrete M-15 in foundation upto a required depth below ground level and upto a required height above ground level/bed level using 40mm down graded hard granite aggregates of approved quality from approved quarry including hoisting, lowering, laying compacting in position in layers to proper slope & level including watering, curing and cost, conveyance, Cess, royality, additional charges, DMF 10% & EMF 5% over royalty taxes of all materials etc. with all labour and T&P required for the work including dewatering, shuttering if necessary complete as per direction of Engineer-in-charge. In Foundation | 86.5 | cum | 4,682.69 | ₹4,05,052.68 |
| 4 | Providing Plain Cement concrete M-15 in foundation upto a required depth below ground level and upto a required height above ground level/bed level using 40mm down graded hard granite aggregates of approved quality from approved quarry including hoisting, lowering, laying compacting in position in layers to proper slope & level including watering, curing and cost, conveyance, Cess, royality, additional charges, DMF 10% & EMF 5% over royalty taxes of all materials etc. with all labour and T&P required for the work including dewatering, shuttering if necessary complete as per direction of Engineer-in-charge. In substructure | 217.7 | cum | 4,824.73 | ₹10,50,343.72 |
| 5 | Plain Cement Concrete PCC Grade M 20 in open foundation complete as per drawing and technical specifications | 31.68 | cum | 4,741.17 | ₹1,50,200.27 |
| 6 | RCC M25 using 12mm size crusher broken HBG chips including centering, Shuttering , cost,conveyance, royality, taxes etc. of all materials complete. Raft | 58.72 | cum | 6,823.98 | ₹4,00,704.11 |
| 7 | RCC M25 using 12mm size crusher broken HBG chips including centering, Shuttering , cost,conveyance, royality, taxes etc. of all materials complete. Rib & Hunch | 81.68 | cum | 7,972.37 | ₹6,51,183.18 |
| 8 | RCC M25 using 12mm size crusher broken HBG chips including centering, Shuttering , cost,conveyance, royality, taxes etc. of all materials complete. Deck Slab | 46.58 | cum | 7,359.55 | ₹3,42,807.84 |
| 9 | Construction of precast RCC railing of M25 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. | 27.6 | mtr | 2,362.71 | ₹65,210.8 |
| 10 | Construction fo RCC guard posts of 200 mm dia M15 grade cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause. | 40 | each | 800.36 | ₹32,014.4 |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 0.70 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_596456.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .