| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹4.4 CrAdmitted-Finance | ₹4.4 Cr | Admitted-Finance |
| 2 | Rejected-Technical | - | Rejected-Technical REJECT BY PDMC EGIS INDIA PVT LTD DOCUMENT INSPECTION REPORT |
| Sl No | Description | Qty | Unit | VISHNU NETWORK AND ENGINEERING WORKS |
|---|---|---|---|---|
| 1.00Name of work | ||||
| 1.01 | 1. Design and build sewage treatment plant of installed capacity 2.25 MLD and all appurtenant structures and allied works;
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer including survey, design, Providing, Supplying, erection and construction of 3 No. of Pumping stations and all appurtenant structures and allied works;
3. Providing, laying, jointing, testing, commissioning of (i) Sewage pumping main of DI K-7 pipe having length of 2990 m of dia 150 mm (ii) Treated water pumping main of DI K-7 pipe having length of 745 m of dia 100 mm from Treated water Sump to nearby agriculture Land/River including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete.
4. Treated Water Sump with Pump House
5. Providing , Supplying and erection of Electric Sub Station including required electric conductor with all necessary equipments and fittings complete in all respect
6. Construction of 3 nos. of Interception Diversion Structure, Including receiving chamber & Arrangement of diversion of waste water. | 1 | Lump Sum | 2,34,56,176 ₹2,34,56,176 Lowest |
| 1.02Operation and Maintenance Cost next 10 Years | ||||
| 1.03 | 1st Year | 1 | Lump Sum | 12,50,000 ₹12,50,000 Lowest |
| 1.04 | 2nd Year | 1 | Lump Sum | 13,12,500 ₹13,12,500 Lowest |
| 1.05 | 3rd Year | 1 | Lump Sum | 13,78,125 ₹13,78,125 Lowest |
| 1.06 | 4th Year | 1 | Lump Sum | 14,47,031 ₹14,47,031 Lowest |
| 1.07 | 5th Year | 1 | Lump Sum | 15,19,383 ₹15,19,383 Lowest |
| 1.08 | 6th Year | 1 | Lump Sum | 15,95,351 ₹15,95,351 Lowest |
| 1.09 | 7th Year | 1 | Lump Sum | 16,75,119 ₹16,75,119 Lowest |
Tender Value
₹2.5 Cr
EMD Value
₹1.3 L
Closing Date
16 Feb 2026, 5:30 pmClosed
Cmo Nagar Parishad Satai
Nagar Parishad Satai
Interception and Diversion of Nallahs with STP works Project of Satai town under SBM 2.0
2026_UAD_473272_1
NIT/28/ETENDER/DATE12/01/2026
Open Tender
Civil Works - Water Works
Lump-sum
180 days
Satai
Please refer Tender documents.
6 documents required · 6 mandatory
₹15,000
₹1.3 L
28 Apr 2026
13 Jan 2026
17 Feb 2026
13 Jan 2026
16 Feb 2026
13 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Name of work | |||||
| 1.01 | 1. Design and build sewage treatment plant of installed capacity 2.25 MLD and all appurtenant structures and allied works;
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer including survey, design, Providing, Supplying, erection and construction of 3 No. of Pumping stations and all appurtenant structures and allied works;
3. Providing, laying, jointing, testing, commissioning of (i) Sewage pumping main of DI K-7 pipe having length of 2990 m of dia 150 mm (ii) Treated water pumping main of DI K-7 pipe having length of 745 m of dia 100 mm from Treated water Sump to nearby agriculture Land/River including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete.
4. Treated Water Sump with Pump House
5. Providing , Supplying and erection of Electric Sub Station including required electric conductor with all necessary equipments and fittings complete in all respect
6. Construction of 3 nos. of Interception Diversion Structure, Including receiving chamber & Arrangement of diversion of waste water. | 1 | Lump Sum | 2,52,57,000 | ₹2,52,57,000 |
| 1.02 | Operation and Maintenance Cost next 10 Years | - | - | - | - |
| 1.03 | 1st Year | 1 | Lump Sum | 14,90,000 | ₹14,90,000 |
| 1.04 | 2nd Year | 1 | Lump Sum | 15,79,400 | ₹15,79,400 |
| 1.05 | 3rd Year | 1 | Lump Sum | 16,74,164 | ₹16,74,164 |
| 1.06 | 4th Year | 1 | Lump Sum | 17,74,614 | ₹17,74,614 |
| 1.07 | 5th Year | 1 | Lump Sum | 18,81,091 | ₹18,81,091 |
| 1.08 | 6th Year | 1 | Lump Sum | 19,93,956 | ₹19,93,956 |
| 1.09 | 7th Year | 1 | Lump Sum | 21,13,593 | ₹21,13,593 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
Tender_Document.pdf
Tender Documents • 1.84 MB
Specifications.pdf
Other Document • 2.62 MB
BOQ_556512.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .