Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹35.5 L+₹1.2 L (3.49%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹45.1 L+₹10.8 L (31.6%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹45.2 L+₹11.0 L (31.9%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹48.1 L+₹13.8 L (40.1%)Admitted-Finance HOUSE NO 2 4 136 LINGREDDY MANSION BLOCK NO IV OPP HANUMAN TEMPLE TADBUND SECUNDERABAD 500009 | SECUNDERABAD | HYDERABAD | TELANGANA | 500009 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BHATNAGAR ASSOCIATES L3 | UNITY ENGINEERING TRADERS L4 | S.S.ENGINEERING CORPORATION L2 | CHITRA ENGINEERING CORPORATION L1 | BHAGYARAM ENTERPRISES L6 | omsai thermax engineers L5 | SUN LIGHT HOUSE L7 | SRI SAI ENTERPRISES L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Disconnecting and removing and replacing of the following unserviceable items from the Chiller of MEMS for smooth functioning complete all as specified and directed by the Engr-in-Charge. | |||||||||||
| 1.01 | Disconnecting and removing the unserviceable Fan contactor from its existing position and replace with new Fan contactor in repairs all as specified and directed | 2 | Each | 3,600 ₹7,200 Lowest | 9,200 ₹18,400 | 8,050 ₹16,100 | 8,000 ₹16,000 | 10,000 ₹20,000 | 9,320 ₹18,640 | 9,000 ₹18,000 | 10,000 ₹20,000 |
| 1.02 | Disconnecting and removing the unserviceable Fan MCCB from its existing position and replace with new Fan MCCB in repairs all as specified and directed | 2 | Each | 7,200 ₹14,400 Lowest | 9,900 ₹19,800 | 9,510 ₹19,020 | 9,500 ₹19,000 | 12,500 ₹25,000 | 11,250 ₹22,500 | 90,000 ₹1,80,000 | 10,000 ₹20,000 |
| 1.03 | Disconnecting electrically and mechanically the condensor fan motor from the existing position and rewinding, varnishing, insulation, ovening, greasing to the condensor motor, replacing of bearings all as specified and directed. | 2 | Each Job | 18,000 ₹36,000 | 7,800 ₹15,600 | 7,490 ₹14,980 Lowest | 7,500 ₹15,000 | 8,600 ₹17,200 | 8,000 ₹16,000 | 7,500 ₹15,000 | 8,000 ₹16,000 |
| 1.04 | Disconnecting and removing the unserviceable Drier Filter from its existing position and replace with new Drier Filter in repairs all as specified and directed | 2 | Each | 7,200 ₹14,400 | 2,250 ₹4,500 | 2,600 ₹5,200 | 2,500 ₹5,000 | 2,712 ₹5,424 | 2,500 ₹5,000 | 2,500 ₹5,000 | 2,000 ₹4,000 Lowest |
| 1.05 | Disconnecting and removing the unserviceable External Oil Filter from its existing position and replace with new External Oil Filter in repairs all as specified and directed | 1 | Each | 4,500 ₹4,500 Lowest | 44,800 ₹44,800 | 22,700 ₹22,700 | 22,500 ₹22,500 | 47,000 ₹47,000 | 45,000 ₹45,000 | 55,000 ₹55,000 | 45,000 ₹45,000 |
| 1.06 | Disconnecting and removing the unserviceable Internal Oil Filter from its existing position and replace with new Internal Oil Filter in repairs all as specified and directed | 2 | Each | 5,400 ₹10,800 Lowest | 26,000 ₹52,000 | 20,200 ₹40,400 | 20,000 ₹40,000 | 27,250 ₹54,500 | 26,000 ₹52,000 | 28,000 ₹56,000 | 26,000 ₹52,000 |
| 1.07 | Disconnecting and removing the unserviceable Ball Valve from its existing position and replace with new Ball Valve in repairs all as specified and directed | 1 | Each | 4,500 ₹4,500 Lowest | 18,000 ₹18,000 | 4,700 ₹4,700 | 4,500 ₹4,500 Lowest | 19,800 ₹19,800 | 19,000 ₹19,000 | 21,000 ₹21,000 | 20,000 ₹20,000 |
| 1.08 | Supply and replacing the unserviceable Screw Compressor Oil from compressor with new Screw Compressor Oil in repairs all as specified and directed | 1 | Each Job | 27,000 ₹27,000 Lowest | 75,000 ₹75,000 | 55,200 ₹55,200 | 55,000 ₹55,000 | 80,000 ₹80,000 | 77,000 ₹77,000 | 75,000 ₹75,000 | 80,000 ₹80,000 |
| 1.09 | Disconnecting and removing the unserviceable Temperature Sensor from its existing position and replace with new Temperature Sensor in repairs all as specified and directed | 4 | Each | 4,500 ₹18,000 Lowest | 13,500 ₹54,000 | 10,600 ₹42,400 | 10,500 ₹42,000 | 15,000 ₹60,000 | 14,000 ₹56,000 | 20,000 ₹80,000 | 15,000 ₹60,000 |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
9 Oct 2025, 6:00 pmClosed
GE(I) R AND D RCI, HYDERABAD
GE(I) RND RCI, MILITARY ENGINEER SERVICES, VIGNYANAKANCHA, RCI, HYDERABAD
REPAIR AND MAINTENANCE OF CENTRAL AIR CONDITIONERS AT VARIOUS LOCATION OF EMU AND CCE RND SOUTH AT RCI UNDER GE I RND RCI HYDERABAD
2025_MES_731564_1
8301
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE(I) R AND D RCI
MES enlisted Class D category c i Un enlisted Meeting enlistment criteria of D class in MES and having no recovery pending. For further details ref NIT
8 documents required · 8 mandatory
₹500
Yes
GE(I) R AND D RCI, HYDERABAD
₹96,000
Yes
22 Oct 2025
18 Sept 2025
11 Oct 2025
18 Sept 2025
9 Oct 2025
3 Oct 2025
Amount
Disconnecting and removing and replacing of the following unserviceable items from the Chiller of MEMS for smooth functioning complete all as specified and directed by the Engr-in-Charge.
Disconnecting and removing the unserviceable Fan contactor from its existing position and replace with new Fan contactor in repairs all as specified and directed
Disconnecting and removing the unserviceable Fan MCCB from its existing position and replace with new Fan MCCB in repairs all as specified and directed
Disconnecting electrically and mechanically the condensor fan motor from the existing position and rewinding, varnishing, insulation, ovening, greasing to the condensor motor, replacing of bearings all as specified and directed.
Disconnecting and removing the unserviceable Drier Filter from its existing position and replace with new Drier Filter in repairs all as specified and directed
Disconnecting and removing the unserviceable External Oil Filter from its existing position and replace with new External Oil Filter in repairs all as specified and directed
Disconnecting and removing the unserviceable Internal Oil Filter from its existing position and replace with new Internal Oil Filter in repairs all as specified and directed
Disconnecting and removing the unserviceable Ball Valve from its existing position and replace with new Ball Valve in repairs all as specified and directed
Supply and replacing the unserviceable Screw Compressor Oil from compressor with new Screw Compressor Oil in repairs all as specified and directed
Disconnecting and removing the unserviceable Temperature Sensor from its existing position and replace with new Temperature Sensor in repairs all as specified and directed
Disconnecting and removing the unserviceable MBB Board from its existing position and replace with new MBB Board in repairs all as specified and directed
Disconnecting and removing the unserviceable Display Board from its existing position and replace with new Display Board in repairs all as specified and directed
Disconnecting and removing the unserviceable TCPM Board from its existing position and replace with new TCPM Board in repairs all as specified and directed
Disconnecting and removing the unserviceable EXV Board from its existing position and replace with new EXV Board in repairs all as specified and directed
Disconnecting and removing the unserviceable Fan Board from its existing position and replace with new Fan Board in repairs all as specified and directed
Disconnecting and removing the unserviceable Flow Switch from its existing position and replace with new Flow Switch in repairs all as specified and directed
Inspection charges for testing, programming, commissioning etc for AC plant at Radar Seekar Lab
Disconnecting and removing and replacing of the following unserviceable items from the Chiller of Radar Seekar Lab for smooth functioning complete all as specified and directed by the Engr-in-Charge.
Disconnecting electrically and mechanically the condensor motor from the existing position and rewinding, varnishing, insulation, ovening, greasing to the condensor motor, replacing of bearings all as specified and directed.
Disconnecting and removing the unserviceable HP Switch MP-4 from its existing position and replace with new HP Switch MP-4 in repairs all as specified and directed
Disconnecting and removing the unserviceable LP Switch MP-5 from its existing position and replace with new LP Switch MP-5 in repairs all as specified and directed
Disconnecting and removing the unserviceable OSS Switch from its existing position and replace with new OSS Switch in repairs all as specified and directed
Disconnecting and removing the unserviceable Angle Valve from its existing position and replace with new Angle Valve in repairs all as specified and directed
Disconnecting and removing the unserviceable Copper Pipe from compressor line and replace with new Copper pipe in repairs all as specified and directed
Disconnecting and removing the unserviceable Flare Nuts from its existing position and replace with new Flare Nuts in repairs all as specified and directed
Disconnecting and removing the unserviceable Copper Tee from its existing position and replace with new Copper Tee in repairs all as specified and directed
Disconnecting and removing the unserviceable Voltage Protection Devise (VPD) from its existing position and replace with new Voltage Protection Devise (VPD) in repairs all as specified and directed
Disconnecting and removing the unserviceable Subzero from its existing position and replace with new Subzero in repairs all as specified and directed
Disconnecting and removing the burntout Copper 3 Core Cable, 1.5 Sqmm size with new Copper 3 Core Cable, 1.5 Sqmm size in repairs all as specified and directed
Disconnecting and removing the unserviceable Compressor Contactor from its existing position and replace with new Compressor Contactor in repairs all as specified and directed
Disconnecting and removing the unserviceable PVC / CPVC Pipe from its existing position and replace with new PVC / CPVC Pipe in repairs all as specified and directed
Disconnecting and removing the unserviceable MCCB, 250 Amps, 4P from its existing position and replace with new MCCB, 250 Amps, 4P in repairs all as specified and directed
Disconnecting and removing the unserviceable Chiller Pump Bearing from its existing position and replace with new Chiller Pump Bearing in repairs all as specified and directed
Opening of the screws, covers of the aircooled condensing units, Descaling of the aircooled condensing units to bring down the high pressure, Cleaning of the dust particles formed on the coil system with diluted 'ASFOCLEAN' chemical, Costic Soda by pouring on the coil with leg pump or mechanical system till the clearing of the dust on the coil as primary wash and detergent powder or surf water as final wash and testing complete of condensing units all as specified and directed.
Disconnecting and removing and replacing of the following unserviceable items from the Chiller of EHSV Lab for smooth functioning complete all as specified and directed by the Engr-in-Charge.
Disconnecting and removing the unserviceable TCPM Board from its existing position and replace with new TCPM Board in repairs all as specified and directed
Disconnecting and removing the unserviceable EXV Board from its existing position and replace with new EXV Board in repairs all as specified and directed
Disconnecting and removing the unserviceable Temperature Sensor from its existing position and replace with new Temperature Sensor in repairs all as specified and directed
Disconnecting and removing the unserviceable 5/8th Ball Valve from its existing position and replace with new 5/8th Ball Valve in repairs all as specified and directed
Disconnecting and removing the unserviceable Oil Filter from its existing position and replace with new Oil Filter in repairs all as specified and directed
Supply and replacing the unserviceable Compressor Oil from compressor with new Compressor Oil in repairs all as specified and directed
Inspection charges for testing, programming, commissioning etc for AC plant at Navigation Lab
Disconnecting, removing / replacing of the following unserviceable items from the Chiller at 0101B AC Plant Make Voltas for smooth functioning complete all as specified and directed by the Engr-in-Charge.
Disconnecting and isolating the compressor of 35 TR capacity, make Voltas at 0101B AC plant electrically and mechanically from the system. After pumping down the system, opening the end cover gear system, checking of the high speed gears, low speed gears, male & female rotors, bearings, overhauling of the same, replacing of the wornout spare parts, supply only unserviceable spares like trust anchor, roller, tapers, Gasket set re-assembling, refixing back to the system, flushing of the system with dry nitrogen (N2), charging of the oil checking of the oil pressure, leak testing and gas charging complete all as directed by Engr-in-Charge. Note :- (a) Supply of crank shaft, pistons, piston rings, Piston pin, connecting rods, half bearing, suction / discharge reeds, brass washer, thrust washer, shaft seal, internal oil filter, section filter, SH 68 Oil, suction / loading springs, wall plates, gasket seal etc which are mentioned in the scope of work and deemed to the amounte quoted. (b) Compressor oil, pressure testing and Refrigerant gas shall be measured and paid separately except Labour charges deemed to be included in the scope of the work.
Disconnecting, removing / replacing of the following unserviceable items from the Chiller at DOFI Building AC Plant Make Voltas for smooth functioning complete all as specified and directed by the Engr-in-Charge.
Disconnecting and removing the unserviceable Controller / PCB from existing position and replace with new Controller / PCB in repairs all as specified and directed
Disconnecting and isolating the compressor of 100 TR capacity, make Voltas at DOFI Building AC plant electrically and mechanically from the system. After pumping down the system, opening the end cover gear system, checking of the high speed gears, low speed gears, male & female rotors, bearings, overhauling of the same, replacing of the wornout spare parts, supply only unserviceable spares like trust anchor, roller, tapers, Gasket set re-assembling, refixing back to the system, flushing of the system with dry nitrogen (N2), charging of the oil checking of the oil pressure, leak testing and gas charging complete all as directed by Engr-in-Charge. Note :- (a) Supply of crank shaft, pistons, piston rings, Piston pin, connecting rods, half bearing, suction / discharge reeds, brass washer, thrust washer, shaft seal, internal oil filter, section filter, SH 68 Oil, suction / loading springs, wall plates, gasket seal etc which are mentioned in the scope of work and deemed to the amounte quoted. (b) Compressor oil, pressure testing and Refrigerant gas shall be measured and paid separately except Labour charges deemed to be included in the scope of the work.
Disconnecting and removing and replacing of the following unserviceable items from the Cooling Towers for smooth functioning complete all as specified and directed by the Engr-in-Charge.
Disconnecting and removing the unserviceable PVC Pipe 16 feet long from the Cooling Tower Hedder line and replace with new PVC Pipe 16 feet long in repairs all as specified and directed
Disconnecting and removing the unserviceable PVC Nozzles from the Cooling Tower Hedder line and replace with new PVC Nozzles in repairs all as specified and directed
Disconnecting and removing the unserviceable PVC Tee from the Cooling Tower Hedder line and replace with new PVC Tee in repairs all as specified and directed
Disconnecting and removing the unserviceable PVC Reducer Coupling 75 mm from the Cooling Tower Hedder line and replace with new PVC Reducer Coupling 75 mm in repairs all as specified and directed
Disconnecting and removing the unserviceable PVC Dummy Cap from the Cooling Tower Hedder line and replace with new PVC Dummy Cap in repairs all as specified and directed
Disconnecting and removing the unserviceable PVC 6" Coupling from the Cooling Tower Hedder line and replace with new PVC 6" Coupling in repairs all as specified and directed
Disconnecting and removing the Headder Line and servicing with chemical and refixing in original position all as specified and directed
Inspection charges for repairs / replacing of unserviceable items and re-fixing and restarting the cooling tower for smooth functioning etc for water cooled AC plants
Disconnecting, removing / replacing of the following unserviceable items from the Chiller at Hero Building AC Plant 22 TR capacity, Make Bluestar for smooth functioning complete all as specified and directed by the Engr-in-Charge.
(a) Disconnecting and removing the unserviceable Controller / PCB from existing position and replace with new Controller / PCB in repairs all as specified and directed
(b) Disconnecting and isolating the compressor of 22 TR capacity, make Bluestar at Hero Building AC plant electrically and mechanically from the system. After pumping down the system, opening the end cover gear system, checking of the high speed gears, low speed gears, male & female rotors, bearings, overhauling of the same, replacing of the wornout spare parts, supply only unserviceable spares like trust anchor, roller, tapers, Gasket set re-assembling, refixing back to the system, flushing of the system with dry nitrogen (N2), charging of the oil checking of the oil pressure, leak testing and gas charging complete all as directed by Engr-in-Charge. Note :- (a) Supply of crank shaft, pistons, piston rings, Piston pin, connecting rods, half bearing, suction / discharge reeds, brass washer, thrust washer, shaft seal, internal oil filter, section filter, SH 68 Oil, suction / loading springs, wall plates, gasket seal etc which are mentioned in the scope of work and deemed to the amounte quoted. (b) Compressor oil, pressure testing and Refrigerant gas shall be measured and paid separately except Labour charges deemed to be included in the scope of the work.
Leak / pressure testing of the system of water cooled / Air cooled chiller unit of any capacity at Central AC Plant with nitrogen (N2) pressure. After evacuating of existing gas from the system in to empty cylinder by separating the entire system like compressors, condensors, cooling coil and refrigerant lines and rectifying of the leakage including cutting, welding, brazing etc and reconnecting with ‘O’ rings, washers, gaskets etc and flushing out the Nitrogen and vacuumising, recharging the taken out refrigerant gas complete all as directed.
Supply and use Oxygen for brazing purpose after leak testing etc all as specified and directed
Supply and re-filling of Refrigerant gas R-134A / R-22 / 407 complete all as directed.
S.S.ENGINEERING CORPORATION (BID ID -3445606)
BHATNAGAR ASSOCIATES (BID ID -3442974)
UNITY ENGINEERING TRADERS (BID ID -3445271)
omsai thermax engineers (BID ID -3446105)
BHAGYARAM ENTERPRISES (BID ID -3445913)
SUN LIGHT HOUSE (BID ID -3446416)
SRI SAI ENTERPRISES (BID ID -3446400)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .