| 1 | L1₹6.5 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹6.5 L+₹1.60 (<0.01%)Rejected-Finance 11 | VIRUDHUNAGAR | TAMIL NADU | 626202 | L2 | Rejected-Finance L2 Rejected |
| Sl No | Description | Qty | Unit | MADASAMY L2 | MRS.USHA, CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B | 13.14 | Cum | 263.78 ₹3,466.07 | 263.77 ₹3,465.94 Lowest |
| 2.00 | Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete. | 7.79 | Cum | 45.85 ₹357.17 Lowest | 45.85 ₹357.17 Lowest |
| 3.00 | Supplying and filling in foundation and basement and trenches with FILLING SAND in layers of not more than 15cm thick, well watered,rammed and consolidated complying with standard specification etc.,complete. | 2.6 | Cum | 1,630.84 ₹4,240.18 | 1,630.83 ₹4,240.16 Lowest |
| 4.00 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete., | 4.75 | Cum | 5,389.28 ₹25,599.08 Lowest | 5,389.28 ₹25,599.08 Lowest |
| 5.00 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x43/8"x23/4" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. | 10.31 | Cum | 6,121.07 ₹63,108.23 | 6,121.06 ₹63,108.13 Lowest |
| 6.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 86.72 | Sqm | 1,095 ₹94,958.4 Lowest | 1,095 ₹94,958.4 Lowest |
| 7.00 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 1,200 | kg | 91.86 ₹1,10,232 Lowest | 91.86 ₹1,10,232 Lowest |
| 8.00 | R.Cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 11.65 | Cum | 9,162.07 ₹1,06,738.12 | 9,162.06 ₹1,06,738 Lowest |
| 9.00 | Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete | 19.33 | cum | 1,200.75 ₹23,210.5 Lowest | 1,200.75 ₹23,210.5 Lowest |
| 10.00 | Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the sta | 50.09 | Sqm | 1,497.09 ₹74,989.24 Lowest | 1,497.09 ₹74,989.24 Lowest |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
13 Sept 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO (B.Pt.)
Panchayat Union, Manur.
Bus shelter
2025_RDTN_600394_3
A3/173/2025 MPLAD
Open Tender
Civil Works - Others
Lump-sum
180 days
Manur
Refer tender doc
2 documents required · 2 mandatory
₹0
₹8,000
28 Sept 2025
4 Sept 2025
15 Sept 2025
4 Sept 2025
13 Sept 2025
4 Sept 2025
Amount
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
Supplying and filling in foundation and basement and trenches with FILLING SAND in layers of not more than 15cm thick, well watered,rammed and consolidated complying with standard specification etc.,complete.
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x43/8"x23/4" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
R.Cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the sta
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete.
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat ,inculding through scrapping, clean removal of dirt etc. complete and inculding necessary plasterof paris , putty whereever required .
MADASAMY (BID ID -1457497)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .