Loading…
Loading…
Tender Value
₹1.8 L
EMD Value
₹3,694
Closing Date
31 Jul 2026, 4:00 pm5d left
Ex Eng IFCD Kupwara
Ex Eng IFCD Kupwara
Construction of breast wall on Sogam Khul near stone crusher at Bedibera.
2026_IFC_315249_5
e-NIT No. IFCDK/02 of 2026-27
Open Tender
Civil Works
Percentage
15 days
KUPWARA
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
C.E IFC Kashmir
₹3,694
9 Jul 2026
9 Jul 2026
1 Aug 2026
9 Jul 2026
31 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kind of soil : | 8.16 | Cum | 479.3 | ₹3,911.09 |
| 2 | Providing of dry stone soling (incl. royalty and consideration chages and other taxes). | 1.19 | Cum | 1,146.66 | ₹1,364.53 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1.19 | Cum | 5,202.9 | ₹6,191.45 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters
buttresses, plinth and string course fillets, kerbs andsteps etc. | 61.2 | Sqm | 628.95 | ₹38,491.74 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level ; 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 13.77 | Cum | 7,564.8 | ₹1,04,167.3 |
| 6 | Provind and laying of 12mm Cement plaster of mix: 1:4 ( 1 cement : 4 fine sand). | 30.6 | Sqm | 283.8 | ₹8,684.28 |
| 7 | Proving and laying of HDPE pipes of required dia. (PN4) 4984/14151/12786/13488 (Complete job) 100mm dia. | 12 | RM | 583.86 | ₹7,006.32 |
| 8CARRIAGE OF MATERIALS By Mechanical Transport including loading, unloading and stacking | |||||
| 8.1 | Stone soling from avg 05km | 1.19 | Cum | 236.16 | ₹281.03 |
| 8.2 | Stone agg. 20mm from avg 1km from Bedibera | 12.39 | Cum | 128.75 | ₹1,595.21 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_1022148.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].