Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.9 CrAccepted-AOC SHOP NO 39 GEETA MARKET RED ROAD LADWA | 1 | Accepted-AOC ACCEPT | |
| 2 | 2₹14.8 Cr+₹92.0 L (6.63%)Rejected-AOC 476 SECTOR 15A HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | 2 | Rejected-AOC REJECT | |
| 3 | 3₹15.2 Cr+₹1.3 Cr (9.45%)Rejected-AOC ROHTAK | ROHTAK | HARYANA | 124001 | 3 | Rejected-AOC REJECT |
Tender Value
₹13.9 Cr
EMD Value
₹27.8 L
Closing Date
19 May 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Sampla W/S Division, Rohtak
Reconstruction of V.R. Bridges at RDs 175800, 188250, 190900 and 198875 of Drain No. 8.
2022_HRY_220742_1
4092-4116/12-A
Open Tender
Civil Works
Item-rate/Agreement basic
210 days
Rohtak
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
₹27.8 L
Yes
Rohtak
21 Jun 2022
11 May 2022
19 May 2022
11 May 2022
19 May 2022
11 May 2022
16 May 2022
135 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. HSR Item No. 4.12 including refilling around structure. | 54,713.01 | Cum | - | - |
| 2 | Dressing bed and preparation of sub grade for lining by mechanical/ mannual means HSR Item No. 14.1 | 11,027.31 | Sqm | - | - |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for : cum cum 6.29.1 Foundations, footings, bases for columns HSR Item no. 6.29.1 | 3,312.68 | Sqm | - | - |
| 4 | M-15 grade plain cement concrete cum 884 727 2686 4297 (cement content considered @ 240 kg/cum) HSR item No. 6.22.1.2 | 6,034.91 | Cum | - | - |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix). HSR item No. 6.25.1 upto plinth level. | 3,105 | Cum | - | - |
| 6 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix). HSR item No. 6.25.2 above plinth. | 3,320.05 | Cum | - | - |
| 7 | Laying CC 1:1.5:3 plin for wearing coat HSR 6.2.2 | 105.44 | Cum | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) sqm including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.HSR item no. 6.29.2 | 7,593.65 | Sqm | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and HSR item no. 6.30.3 | 1,000.85 | Sqm | - | - |
| 10 | Providing and fixing in position 12mm thick bitumen impregnated fibre board conforming to IS: 1838, including cost of primer, sealing compound Grade-A in expansion joints.HSR item No 6.58 | 10,327.51 | mtr/ cm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_289327.xls
BOQ Document • 0.30 MB
97915975.pdf
Tender Document • 0.24 MB
BID_1.pdf
Tender Document • 1.18 MB
97915977.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .