Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.5 L
EMD Value
₹3,700
Closing Date
19 Oct 2026, 4:33 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Directorate of Municipal Administration
Shri Prashant Patil JE
Soak Pit
DMA/2026-27/OW/WORK_INDENT62829
DMA/2026-27/OW/WORK_INDENT62829
Open
Other Works
Electronic Documents, First(One Cover)
DMA Town Panchayat Lokapur
5 documents required · 5 mandatory
₹500
₹3,700
8 Oct 2026
8 Oct 2026
19 Oct 2026
ಲೋಕಾಪೂರ ಪಟ್ಟಣ ಪಂಚಾಯತಿಯ ವ್ಯಾಪ್ತಿಯ ಘಣತ್ಯಾಜ್ಯ ವಿಲೇವಾರಿ ಘಟಕದಲ್ಲಿ ಸೋಕ್ ಪೀಟ್ ನಿರ್ಮಾಣ ಮಾಡುವುದು.
TOWN PANCHAYAT,LOKAPUR
[Paragraph 130 (a) of the Karnataka Public Works Department Code]
Sanctioned Estimate No. :
Estimate framed in the office of the ENGINEERING SECTION,TOWN PANCHAYAT LOKAPUR
Estimate for the work
ಲೋಕಾಪೂರ ಪಟ್ಟಣ ಪಂಚಾಯತಿಯ ವ್ಯಾಪ್ತಿಯ ಘಣತ್ಯಾಜ್ಯ ವಿಲೇವಾರಿ ಘಟಕದಲ್ಲಿ ಸೋಕ್ ಪೀಟ್ ನಿರ್ಮಾಣ ಮಾಡುವುದು.
Estimated Cost 1.48 Lakhs
Administratively approved under No. Date :
Technically sanctioned under No. Date :
Estimate prepared by : Sri Prashant.A.Patil JE
Checked by : Sri
Junior Engineer Chief Officer
Town Panchayat Town Panchayat
Lokapur Lokapur
¯ÉÆÃPÁ¥ÀÆgÀ ¥ÀlÖt ¥ÀAZÁAiÀÄvÀ
¸ÁªÀiÁ£Àå ªÀgÀ¢
ಲೋಕಾಪೂರ ಪಟ್ಟಣ ಪಂಚಾಯತಿಯ ವ್ಯಾಪ್ತಿಯ ಘಣತ್ಯಾಜ್ಯ ವಿಲೇವಾರಿ ಘಟಕದಲ್ಲಿ ಸೋಕ್ ಪೀಟ್ ನಿರ್ಮಾಣ ಮಾಡುವುದು.
¯ÉÆÃPÁ¥ÀÆgÀ ¥ÀlÖt ¥ÀAZÁAiÀÄvÀ ªÁå¦ÛAiÀÄ°èæ UÁæªÀÄ ¥ÀAZÁAiÀÄvÀ¢AzÀ ¥ÀlÖt ¥ÀAZÁAiÀÄvÀ zÀeÉðUÉ G£ÀßwPÀgÀtUÉÆÃArzÀÄÝ CzÀgÀAvÉ ¸ÁªÀðd¤PÀjUÉ ¤gÀAvÀgÀªÁV ªÀÄÆ®¨sÀÆvÀ ¸Ë®¨sÀåUÀ¼À£ÀÄß PÀ°à¸ÀĪÀzÀÄ ¯ÉÆÃPÁ¥ÀÆgÀ ¥ÀlÖt ¥ÀAZÁAiÀÄvÀ DzÀå PÀvÀåðªÀåªÁVgÀÄvÀÛzÉ ¸À£ï 2024-25 £É ¸Á°ನ ಎಸ್.ಬಿ.ಎಮ್ DAiÉÆÃUÀzÀ C£ÀÄzÁ£À ©qÀÄUÉÆÃArzÀÄÝ CzÀgÀAvÉ ªÀiÁ£Àå DqÀ½vÁ¢üPÁjUÀ¼ÀÄ, ¯ÉÆÃPÁ¥ÀÆgÀ ¥ÀlÖt ¥ÀAZÁAiÀÄvÀ gÀªÀgÀÄ QæAiÀiÁ AiÉÆd£É gÀƦ¹ C£ÀÄªÉÆzÀ£ÉUÁV f¯Áè¢üPÁjUÀ¼ÀÄ,f¯Áè¢üPÁjUÀ¼À PÁAiÀiÁð®AiÀÄ ,¨ÁUÀ®PÉÆl gÀªgÀÄ QæAiÀiÁ AiÉÆd£ÉUÉ ªÀÄAdÆgÁwAiÀÄ£ÀÄß ¤rzÀÄÝ EgÀÄvÀÛzÉ ,CzÀgÀAvÉ __F ªÉÄð£À__PÁªÀÄUÁjAiÀÄ£ÀÄß PÉåUÉÆ¼ÀÄîªÀzÀÄ ¸ÁªÀðf¤PÀgÀ »vÀ zÀȶ׬ÄAz Cw CªÀ±ÀåPÀªÁVzÀÄÝ , PÁgÀt CAzÁdÄ ¥ÀwæPAiÀÄ£ÀÄß vÀAiÀiÁj¹zÀÄÝ ¸À£ï 2023-24 ¸Á°£À ¯ÉÆPÉÆ¥ÀAiÉÆV E¯ÁSÉ(«zÀÄåvï/¹«í¯ï)/ PÁªÀÄUÁjUÀ¼À KPÀgÀÆ¥À C£ÀĸÀÆa zÀgÀ¥ÀnÖ : 2023-24 ¸ÀÀA¥ÀÅl – 5/ºÉ¸ÁÌA zÀgÀUÀ¼À£ÀÄß C¼ÀªÀr¹PÉÆÃAqÀÄ CAzÁdÄ ¥ÀwæPÉAiÀÄ£ÀÄß vÀAiÀiÁj¹zÀÄÝ vÁAwæPÀ C£ÀÄªÉÆÃzÀ£ÉUÁV ªÀÄvÀÄÛ ¤AiÀĪÀiÁ£ÀĸÁgÀ F-¥ÀæPÀÆågÀªÉÄAl mÉAqÀgÀ PÀgÉAiÀÄ®Ä ªÀÄAr¹zÉ.
Estimate Cost : 1.48 Lakhs
¸ÀzÀj CAzÁdÄ ¥ÀwæPÉAiÀÄ£ÀÄß ¸À£ï 2023-24 ¸Á°£À ¯ÉÆPÉÆ¥ÀAiÉÆV E¯ÁSÉ(«zÀÄåvï/¹«í¯ï)/zÀgÀ¥ÀnÖAiÀÄ zÀgÀUÀ¼À£ÀÄß ¥ÀjUÀt¹ vÀAiÀiÁj¸À¯ÁVzÉ.
QjAiÀÄ C©üAiÀÄAvÀgÀgÀÄ ªÀÄÄSÁå¢üPÁjUÀ¼ÀÄ
¥ÀlÖt ¥ÀAZÁAiÀÄvÀ, ¯ÉÆÃPÁ¥ÀÆgÀ ¥ÀlÖt ¥ÀAZÁAiÀÄvÀ,¯ÉÆÃPÁ¥ÀÆgÀ
TOWN PANCHAYAT,LOKAPUR
ಲೋಕಾಪೂರ ಪಟ್ಟಣ ಪಂಚಾಯತಿಯ ವ್ಯಾಪ್ತಿಯ ಘಣತ್ಯಾಜ್ಯ ವಿಲೇವಾರಿ ಘಟಕದಲ್ಲಿ ಸೋಕ್ ಪೀಟ್ ನಿರ್ಮಾಣ ಮಾಡುವುದು.
(PARA 133(i) OF K.P.W.D.)
i) Certified that Prashant A Patil Junior Engineer Town Panchayat Lokapur have personally visited the work spot, and prepared the estimate using sanctioned schedule of rates and providing most economical and safe way of executing the work.
ii) Certified that the provisions made in this estimate are not provided in any of the sanctioned estimate.
Town Panchayat Lokapur Town Panchayat Lokapur
TOWN PANCHAYAT,LOKAPUR
CHECK LIST ACCOMPANYING THE ESTIMATE
1) Face Sheet duly filled up with all relevant particulars and signed by all the concerned officers/officials is enclosed. : Yes
2) Whether administrative approval is accorded or not. If accorded the letter No. & date to be furnished. : Yes
3) General Report with all details highlighting the importance of work is enclosed or not. : Yes
4) Whether estimate is prepared as per current S.R. or not. : Yes
5) Abstract Sheet with details of specifications as per C.S.R. with all leads and lifts for all the items, is enclosed or not. : --
6) Detailed Measurement Sheet with specification as per C.S.R. with all leads and lifts, is enclosed or not. : Yes
7) Whether the approved quarry maps for different materials of construction are enclosed or not. : --
8) Rate Analysis with detailed specifications as per C.S.R. with necessary leads and lifts by adding difference in issue rate of materials duly signed for each item is enclosed or not. : --
9) If market rate is considered in the rate analysis the procedure followed as per rules is to be furnished in the form of certificate for such items with details. : --
10) Co-efficient considered in the estimate are one and the same with reference to schedule of rates approved. : No
11) Lead Statement based on approved quarry map is enclosed or not. : --
12) Measurements considered in the estimate are as per type plans approved by the competent authority is enclosed or not. : Yes
13) Whether trial pit results approved by competent authority are enclosed or not. : --
14) Approved plan, elevation and foundation details are enclosed or not : --
15) Whether provision is made in the estimate for draining away water from the building/road/bridges etc. : --
16) Whether provision is made for electricity, water supply, drainage and other items. : --
17) Whether required certificates as per conduct rule is enclosed or not. : Yes
18) Whether the work is included in programme of works or not. :
19) Whether the estimate has been neatly typed and submitted in duplicate or not. : Yes
TPC Lokapur TPC Lokapur
TOWN PANCHAYAT LOKAPUR
NAME OF WORK : ಲೋಕಾಪೂರ ಪಟ್ಟಣ ಪಂಚಾಯತಿಯ ವ್ಯಾಪ್ತಿಯ ಘಣತ್ಯಾಜ್ಯ ವಿಲೇವಾರಿ ಘಟಕದಲ್ಲಿ ಸೋಕ್ ಪೀಟ್ ನಿರ್ಮಾಣ ಮಾಡುವುದು.
ESTIMATE COST : 1.48 LAKHS
SL No Description S.R Rate Analysisi 2023-24 No L B D Qty Unit Rate Amount
1 Earth work in surface excavation by mechanical means for lowering & leveling the ground without blasting for all works other than foundation in Ordinary/ Soft rock & depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work In Ordinary/Soft rock upto 300 mm depth (PWD SR 2023-24 / VOLUME 1 / I NO 1.13 / P. NO 08)
Basic Rate 102 1.2
Area weightage @ 3% 3.06 0.97
2 Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work (PWD SR 2023-24 / VOLUME 3 / I NO 3.1 / P. NO 17)
Area weightage @ 3% 2.55
Final Rate 87.55 0.00 40
3 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24/Pg No.15 /I No2.1.6 vol-01)
Basic Rate 6243
Area weightage @ 3% 187.29 172.13
Final Rate 6430.29
4 Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (PWD SR 2023-24/Pg No.13 /I No6.1 vol-02)
Basic Rate 8,220.00
Area weightage @ 3% 246.6
Final Rate 8466.60
5 Supplying, filling, spreading &leveling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer, for all leads & lifts, all complete as per direction of Engineer -in-charge. (PWD SR 2023-24/Pg No.175 /I No17.3 vol-02)
Basic Rate 1,192.00
Area weightage @ 3% 35.76
Final Rate 1227.76
6 Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications. (PWD SR 2023-24/Pg No.11 /I No 1.23 vol-01)
Basic Rate 2,682.00
Area weightage @ 3% 80.46
Final Rate 2762.46
7 Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20Design Mix Using 20 mm nominal size graded crushed coarse aggregates. PWD CSR 2023-24 Volume -1 P.No 16. I.No 2.5.1
Basic Rate 6630
Formwork 50% 3315
Area weightage @ 3% 298.35
Final Rate 10243.35
8 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (PWD Vol-1 SR 2023-24, Item No. 2.11a, Page No. 18)
Basic Rate 89457
Area weightage @ 3% 2683.71
Final Rate 92140.71 1.21 10mm
9 Providing & fixing 455x610 mm cast iron cover with frame weight to be not less 38kgs (weight of cover 23 kgs and weight of frame 15 kgs)and necessary locking arrangements with M.S flats 32x6 mm etc & painting with two or more coats with black Japan paint etc. complete as directed by the engineer-in-charge. (PWD SR 2023-24/Pg No.221 /I No 18.3 vol-05)
Basic Rate 1,962.00
Area weightage @ 3% 58.86
Final Rate 2020.86
Total Rs. 125782.94
Total Rs. 148423.87
Miscelellaneous & Rounding Off 172.13 229.76
Total Amount Rs. 148596.00
1 The work spot has been inspected by me and founf necessary
2 The provisions made in estimate are necessary and economical
3 The estimate is based on PWD SR of 2023-24 6000
Junior Engineer Chief officer
TP Lokapur TP Lokapur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
SBM Soak Pit 1 48Lak.xlsx
Tender Document • 0.04 MB
Lokapura SWM DPR ACTION PLANE.pdf
Tender Document • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .