Tender Value
₹5.1 Cr
EMD Value
₹5.1 L
Closing Date
15 Sept 2026, 5:30 pm5d left
MS PRIYANKA SHARMA(DFLT)
CHIEF ENGINEER ( TENDER CELL)
NIT 1188 Construction& Maintenanc Road Under MMGSVY PKG No. Nawa Ratenga Paripatpara Mukhya Marg To Bade Badrenga , District-Bastar
198623
NIT 1188 Construction& Maintenanc Road Under MMGSVY PKG No , District-Bastar
RESTRICTED TENDER
WORKS
PERCENTAGE
12 days
CHIEF ENGINEER ( TENDER CELL)
Required Past Technical Experience: As per Tender document
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
15 documents required · 15 mandatory
Panchayat and Rural Development (PARD)
WORKS
MS PRIYANKA SHARMA(DFLT)
RESTRICTED TENDER
PERCENTAGE
A B
CHIEF ENGINEER ( TENDER CELL)
TENDER CELL
CGRRDA RAIPUR
120
12
No
1
198623
15 Sep, 2026 5:30:00 PM IST
18 Sep, 2026 5:40:46 PM IST
1 Sep, 2026 5:30:00 PM IST
NIT 1188 Construction& Maintenanc Road Under MMGSVY PKG No , District-Bastar
NIT 1188 Construction& Maintenanc Road Under MMGSVY PKG No. Nawa Ratenga Paripatpara Mukhya Marg To Bade Badrenga , District-Bastar
511000.00 INR
RTGS/CHALLAN (ONLINE) Internet Banking (ONLINE)
51069000.00
2
18 Sep, 2026 5:30:54 PM IST
51069000
AS PER NIT
AS PER NIT
As per Tender document
5000.00 INR
13d 22h 36m
15 documents required · 15 mandatory
₹5,000
₹5.1 L
1 Sept 2026
1 Sept 2026
18 Sept 2026
1 Sept 2026
18 Sept 2026
T-1 T-2 T-3 T-4 T-5 T-6 T-7 T-8 T-9 Remarks 2 PMC BM GIII GII WMM GSB SG Crust T-4 7 PMC BM GIII GII WMM GSB SG Crust T-4
3 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 GIII 3 PMC BM GIII GII WMM GSB SG Crust T-4 10 PMC BM GIII GII WMM GSB SG Crust T-4
5 0.100 0.100 0.100 SG 5 PMC BM GIII GII WMM GSB SG Crust T-4
PACKAGE No. CG- YEAR 2025-2026 Payment Design CRUST WIDTH & THICKNESS OF BT ROAD DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
DISTRICT BASTAR Top Width 7.5 For Bitumen Road NAME OF STA :- GURU GHASIDAS VISHWAVIDYALAYA, BILASPUR (C.G.)
BLOCK BASTAR Carriage Way 3.75 Top Width 7.5 0.0 Shoulder Width 1.875 CGRRDA, PIU 01 Jagdalpur Distt-Bastar (C.G.)
ROAD NAME NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Link / Throgh ROUTE NO. Shoulder 1.875 Layer Thickness Top Bottom Width
ROAD FROM NAWA RATENGA PARIPATPARA MUKHYAMARG T- Existing CW 0 PMC 0.02 1.875 1.915 3.750
ROAD TO BADE BADRENGA Traffice Category T-4 BM 0.000 1.915 1.915 3.750
EXISTING ROAD DETAILS :- TRAFFIC SURVEY DATE 15/Mar/25 CBR 5 GIII 0.000 1.915 1.915 3.750
Total Length of Road 5500.00 M FALSE GII 0.000 1.915 1.915 3.750
EX CC 3.0Mt WIDTH EX CC 3.75Mt WIDTH NEW BT ROAD EX CC GOOD CONDITION NEW PROPOSED CC WMM 0.150 1.915 2.215 3.750
Length of Flexible Pavement (N) FROM CH. TO WIDTH FROM CH. TO WIDTH FROM CH. TO WIDTH FROM CH. TO WIDTH FROM CH. TO WIDTH 0.020 GSB 0.150 2.065 2.365 4.050
1400.00 0.075 Av Top Bottom
Length of Flexible Pavement (U) 0.000 Soft Sh. 0.170 2.045 1.875 2.215
CRUST WIDTH & THICKNESS OF CC ROAD CRUST WIDTH & THICKNESS OF CC ROAD
For CC Road For CC Road
Top Width 7.5 0.0 Shoulder Width 1.875 Top Width 7.5 3.0 Shoulder Width 1.875
Layer Thickness Top Bottom Width Layer Thickness Top Bottom Width
School Village speed breakers RD BOARD Sl.No. Habitation benefited Population benefited PVTG UID Relocation of Utilities
0 0 TOTAL ST Electricpole 0 Av Top Bottom Av Top Bottom
2290 800 1 Bade Badrenga 122 0 - Transformer 0 Soft Sh. 0.000 1.875 1.875 1.875 Soft Sh. 0.100 1.975 1.875 2.075
2650 900 Handpump 0 Es Beside WMM 0.150 2.025 1.875 2.175 Es Beside Ex. CC 0.000 2.075 2.075 2.075
4 Start Point: latitude 19.3658
4 4 5 longitude 81.9293
End Point:- latitude 19.3463
Ex Road Summary longitude 81.929
Chainage Road crust Total Crust Available Width of Crust (in M) Width of road up to Shoulder (in M) Condition of road Proposal
From To G-III G-II CC GSB
(M) (M) (in m) (in m) (in m) (in m) (in m)
0 100 0.00 0.00 PROPOSED CC ROAD.
100 1300 0.00 0.00 EARTHEN ROAD PROPOSED BT ROAD.
1300 1650 0.15 0.15 0.30 3.00 5.00 EARTHEN ROAD PROPOSED CC ROAD.
1650 2800 0.00 0.00 EARTHEN ROAD PROPOSED BT ROAD.
2800 3100 0.00 0.00 EARTHEN ROAD PROPOSED CC ROAD.
3100 3350 0.00 0.00 3-4 EARTHEN ROAD PROPOSED BT ROAD.
3350 3450 0.1 0.15 0.25 5.00 5.50 EARTHEN ROAD PROPOSED CC ROAD.
3450 4400 0.00 0.00 3-4 EARTHEN ROAD PROPOSED BT ROAD.
4400 4500 EARTHEN ROAD PROPOSED CC ROAD.
4500 5510 0.1 0.15 0.25 3.00 5.50 EARTHEN ROAD PROPOSED BT ROAD.
Protection drn!L9 TW!M9 RT!M8`` BR W``
ITEM SIDE LENGTH HEIGHT From To From To From To From To From To From To From To From To From To From To
FOR CC DRAIN 1 440.00 300 630 4700 4810 #NAME?
TOE WALL 1 0.00 #NAME?
RETAINING WALL 1 0.00 #NAME?
BREAST WALL 1 0 #NAME?
SURFACE DRAIN 1 550 #NAME?
CC SHOULDER 1 0.00 #NAME?
CC SHOULDER IN BT ROAD 1 0.00 #NAME?
DRAIN WITH WALL 1 0.00 #NAME?
SURFACE DRAIN 1 0.00
Namef Road: NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5 0 1RX1000MM DIA HPC
Length: 5.5 Km Length No.
Existing CDs Structures Remarks Proposed CDs Structures Remarks Sr. No CD Type & Details No of CDs Ex CD Deduct 0.0 2 #NAME? #NAME? #NAME? #NAME? #NAME?
No. CH (m) CD Type & Details No. CH (m) CD Type & Details Ex CD List Deduction 5.4 13 15 1 1.5 3 6 12
1 225 2R X 1000MM DIA H.P.C GOOD CONDITION 1 5 1R X 1000mm Dia H.P.C REPLACEMENT Pro. CD List 1 1R X 1000mm Dia H.P.C 10 Field crossing
2 480 BRIDGE 470 TO 510M. GOOD CONDITION 2 215 1R X 1000mm Dia H.P.C REPLACEMENT 1 Abs. CD'!A1 1.5 1.50 m Span Slab Culvert 2 Sno. Chainage 215
3 920 1.50 m Span Slab Culvert DAMAGE CONDITION 3 1700 1R X 1000mm Dia H.P.C NEW PROPOSED 3 C2 n'!S286 3 3.0 m Span Slab Culvert 0 1 10 1700
4 1615 1.50 m Span Slab Culvert GOOD CONDITION 4 2200 1R X 1000mm Dia H.P.C NEW PROPOSED 1 6 6.0 m Span Slab Culvert 0 2 21 2200
5 2015 1.50 m Span Slab Culvert GOOD CONDITION 5 2680 1R X 1000mm Dia H.P.C NEW PROPOSED 1 12 2 X 6.0 m Span Slab Culvert 0 3 33 2680
6 2250 1.50 m Span Slab Culvert GOOD CONDITION 6 2760 1R X 1000mm Dia H.P.C REPLACEMENT 1.5 15 FLUSH CAUSEWAY 0 4 1538 2760
7 2400 1.50 m Span Slab Culvert GOOD CONDITION 7 2850 1R X 1000mm Dia H.P.C REPLACEMENT 20 Long Span Bridge 0 5 1801
8 2890 1.50 m Span Slab Culvert GOOD CONDITION 8 3100 1R X 1000mm Dia H.P.C REPLACEMENT PROPOSED CD 13 6
9 3110 1.50 m Span Slab Culvert GOOD CONDITION 9 3720 1.50 m Span Slab Culvert REPLACEMENT EXISTING CD 15 7
10 3475 1.50 m Span Slab Culvert GOOD CONDITION 10 3950 1R X 1000mm Dia H.P.C REPLACEMENT Replacement 7 8
11 3712 6.0 m Span Slab Culvert GOOD CONDITION 11 5060 1R X 1000mm Dia H.P.C NEW PROPOSED Field crossing 3 9
12 4476 3.0 m Span Slab Culvert GOOD CONDITION 12 5460 5R X 1000mm Dia H.P.C NEW PROPOSED 10
13 4575 1.50 m Span Slab Culvert GOOD CONDITION 13 5910 1.50 m Span Slab Culvert NEW PROPOSED 11
14 4685 1.50 m Span Slab Culvert GOOD CONDITION EXISTING CULVERT 12
15 5455 1.50 m Span Slab Culvert DAMAGE CONDITION TOTAL No of CDs CD Type & Details LENGTH 13
26.1 9 1.5 m SPAN SLAB CULVERT 2.9 X2 X4 15
8.8 2 3.0 m SPAN SLAB CULVERT 4.4 4 2.5 16
7.4 1 6.0 m SPAN SLAB CULVERT 7.4 5 5 17
0.0 0 6.0 m 2SPAN SLAB CULVERT 9.4 15 5 18
40.0 1 LONG SPAN BRIDGE 40.0 0 0
NH-43 To Bejgapara
CURVE DESIGN TABLE
Curve CH. of the Radius of Dev. L Ts H.I.P. V Ls(I) Ls(II) Ls Max 0s C Lc S Ts Es e BC EC Total Length of Curve (M.)
No. start point. Curve Angle (M) (M) (M) Km/ph (M) (M) (M) (Deg) (Deg) (M) (M) (M) (M) IN % (M) (M)
of curve in (Metre) (Deg)
TOTAL LENGTH OF CURVE 245.71
DPR Consultant Sub Engineer (CGRRDA PIU 02 Pathalgaon) Assistant Engineer (CGRRDA 02 Pathalgaon)
, % V- R- d- Ts-
S- Lc- Ls- Es- e-
, % V- R- d- Ts-
S- Lc- Ls- Es- e-
, % V- R- d- Ts-
S- Lc- Ls- Es- e-
, % V- R- d- Ts-
S- Lc- Ls- Es- e-
, % V- R- d- Ts-
S- Lc- Ls- Es- e-
, % V- R- d- Ts-
S- Lc- Ls- Es- e-
, % V- R- d- Ts-
S- Lc- Ls- Es- e-
, % V- R- d- Ts-
S- Lc- Ls- Es- e-
, % V- R- d- Ts-
S- Lc- Ls- Es- e-
, % V- R- d- Ts-
S- Lc- Ls- Es- e-
10 V-,R-,d-,Ts-
, % V- R- d- Ts-
S- Lc- Ls- Es- e-
11 V-,R-,d-,Ts-
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
DETAIL PROJECT REPORT
FOR RURAL ROADS CONNECTIVITY SCHEME
PRADHAN MANTRI GRAM SADAK YOJANA
JUGA & PMGSY-IV
DISTRICT :- BASTAR BLOCK :- BASTAR
NAME OF ROAD :-NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
PACKAGE : CG- LSB :- 0 No.
DPR Length:- BT-4.3 + CC-1.4 5.500 Incl.GST Cost : Kms Avg. Cost (K.M) Avg. Cost (K.M) With GST
Cost of Flexible Pavement (Rs. Lacs) 183.99 217.11 : Lacs 33.45 39.47
Cost of Rigid Pavement (Rs. Lacs) 85.66 101.08 : Lacs 15.58 18.38
Total Pavement Cost (Rs. Lacs) 269.65 318.19 : Lacs 49.03 57.85
Cost Of Protection Work (Rs. Lacs) 39.52 46.63 : Lacs 7.18 8.48
Cost Of P.C.C. Drain Work (Rs. Lacs) 12.69 14.97 : Lacs 2.31 2.72 390.02
Road Furniture & Other Work (Rs. Lacs) 8.67 10.23 : Lacs 1.58 1.86 15 18.75 281.25
Total Non-Pavement Cost (Rs. Lacs) 60.87 71.83 : Lacs 11.07 13.06 10 3.75 37.5
Cost of CDs (Rs. Lacs) Nos.13 80.27 94.72 : Lacs 14.59 17.22
Total Cost Pavement/Non-Pavement/ & CD Work (Rs. Lacs) 410.79 484.73 : Lacs 74.69 88.13 #REF!
Maintenance Cost (Rs. Lacs) 22.00 25.96 : Lacs 4.00 4.72 -38.71 C-2 C2 n'!T355
Total Cost (Rs. Lacs) #REF! #REF! : Lacs #REF! #REF! 0.00 BOQ BOQ!AG82
Total Cost Incl. Maintenance (Rs. Lacs) 432.79 510.69 : Lacs 78.69 92.85 0.00 BOQ
Executive Engineer cum Member Secretary
CGRRDA, PIU 01 Jagdalpur Distt-Bastar (C.G.)
M.R. Infrastructure
Street NO-1,Secter No-03,Profesor Colony,Raipur. Dist.-Raipur (C.G)
E-mail : [email protected] ( Mob No- +91- 9074306346 )
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
DETAIL PROJECT REPORT
FOR RURAL ROADS CONNECTIVITY SCHEME
PRADHAN MANTRI GRAM SADAK YOJANA
JUGA & PMGSY-IV
DISTRICT :- BASTAR BLOCK :- BASTAR
NAME OF ROAD :-NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
PACKAGE : CG- LSB :- 0 No.
DPR Length:- BT-4.3 + CC-1.4 5.500 Incl.GST Cost : Kms Avg. Cost (K.M) Avg. Cost (K.M) With GST
Cost of Flexible Pavement (Rs. Lacs) 183.99 217.11 : Lacs 33.45 39.47
Cost of Rigid Pavement (Rs. Lacs) 85.66 101.08 : Lacs 15.58 18.38
Total Pavement Cost (Rs. Lacs) 269.65 318.19 : Lacs 49.03 57.85
Cost Of Protection Work (Rs. Lacs) 39.52 46.63 : Lacs 7.18 8.48
Cost Of P.C.C. Drain Work (Rs. Lacs) 12.69 14.97 : Lacs 2.31 2.72 390.02
Road Furniture & Other Work (Rs. Lacs) 8.67 10.23 : Lacs 1.58 1.86 15 18.75 281.25
Total Non-Pavement Cost (Rs. Lacs) 60.87 71.83 : Lacs 11.07 13.06 10 3.75 37.5
Cost of CDs (Rs. Lacs) Nos.13 80.27 94.72 : Lacs 14.59 17.22
Total Cost Pavement/Non-Pavement/ & CD Work (Rs. Lacs) 410.79 484.73 : Lacs 74.69 88.13 #REF!
Maintenance Cost (Rs. Lacs) 22.00 25.96 : Lacs 4.00 4.72 -38.71 C-2 C2 n'!T355
Total Cost (Rs. Lacs) #REF! #REF! : Lacs #REF! #REF! 0.00 BOQ BOQ!AG82
Total Cost Incl. Maintenance (Rs. Lacs) 432.79 510.69 : Lacs 78.69 92.85 0.00 BOQ
Executive Engineer cum Member Secretary
CGRRDA, PIU 01 Jagdalpur Distt-Bastar (C.G.)
M.R. Infrastructure
Street NO-1,Secter No-03,Profesor Colony,Raipur. Dist.-Raipur (C.G)
E-mail : [email protected] ( Mob No- +91- 9074306346 )
A. Chapters Chapters 0 to 0
1 . Introduction
2 . Planning and Basic Design Consideration
Figure-1 Road Map of India and state
Figure-2 District Map
Figure-3 Block Maps showing all existing connectivity like District/block HQ, new townships, National and State highway network, mandis, hospitals, colleges, schools etc.
Figure-4 Strip plan showing land and alignment details
3 . Topographic Survey
4 . Soil and Materials Survey
Figure -5 Quarry Map
5 . Traffic Survey
6 . Hydrological Survey
7 . Geometric Design Standards
8 . Alignment Design
9 . Pavement Design
10 . Design of Cross Drainage
11 . Protective Works & Drainage
12 . Land Acquisition
13 . Utility shifting/relocation
14 . Road Safety and Traffic Management
15 . Specification
16 . Environmental Issues
17 New/Green Technologies
18 Climate Resilient and Carbon Reduction Strategies
19 Analysis of Rates
20 Cost Estimate
21 Construction Program
1 . #REF! to 241
15 . 15. Checklist for community consultation on engineering 299 to 302
Chhattisgarh to Launch ‘Janjatiya Unnat Gram Abhiyan(PM JGUA)’
Launch of Pradhan Mantri Janjatiya Unnat Gram Abhiyan (PM JUGA): The launch of the PM JGUA Scheme marks a major effort to improve the living standards of tribal families in 63,000 villages. The scheme will emphasise "saturation coverage" in tribal-majority villages and aspirational districts. It is anticipated to benefit around 5 crore tribal individuals by improving their access to essential services and socio-economic opportunities.
About: Launched on 25th December 2000, to provide all-weather road connectivity to unconnected habitations. Eligibility: Unconnected habitations with a population of 500+ in plain areas and 250+ in North-Eastern, Himalayan, Desert, and Tribal Areas (as per the 2001 census). Unconnected Habitation is a habitation located at least 500 metres (1.5 km in hills) from an all-weather road. Core Network: The essential network of roads required to provide basic access to social and economic services through at least one all-weather road. Funding Pattern: The Union Government covers 90% of project costs in North-Eastern and Himalayan States, and 60% in other states, with allocations based on sanctioned project values. Construction Standards: Rural roads are constructed according to the Indian Roads Congress (IRC) guidelines, which have been the apex body of highway engineers since 1934.
Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
1.1 Objectives of Pradhan Mantri Gram Sadak Yojana (PMGSY)
(PM JGUA) Rural Road connectivity is a key component of rural development by promoting access to economic and social services and thereby generating increased agricultural incomes and productive employment opportunities. It is also a key ingredient in ensuring poverty reduction.
Rural Road connectivity is not only a key component of Rural Road Development in the country but is also recognized as an effective poverty reduction program. Even after the efforts made so far over the years, all weather roads yet do not connect about 40% of the villages in the country.
The Pradhan Mantri Gram Sadak Yojana has indicated various guiding principles, which among others are as follows:
The rural roads to be connected /developed under the scheme will cover only Other District Roads and Village Roads.
An unconnected Habitation is one with a population upto 100 persons and located at a distance of at least 500 meters or more (1.50km path distance in case of hills) from an All-weather road or a connected village / Habitation.
The Unconnected Habitations are to be connected to nearby Habitations or to another existing all-weather road to ensure availability of educational, health and marketing facilities etc.
Providing road connectivity through good all-weather road – its surface depending upon the traffic and other rural requirements.
It was against this background of poor connectivity that the Prime Minister announced in Budget Speech 2023-24 to improve socio-economic condition of the Particularly Vulnerable Tribal Groups (PVTGs)
Janjatiya Unnat Gram Abhiyan(PM JGUA)
The PMGSY envisages consolidation of the existing Rural Road Network by upgradation of existing Through Routes and Major Rural Links that connect habitations to
i. Gramin Agricultural Markets (GrAMs)
ii. Higher Secondary Schools
PMGSY programme focus on Up-gradation of existing Through Routes and Major Rural Links based on priority giving importance to critical facilities like the rural markets and education & health facilities. This programme provides connectivity, easy access and faster movement from the habitations to Mandis, agricultural Markets, other farmer related enterprises, higher secondary schools, colleges, hospitals etc in order to improve the quality life of rural populous. This is a 5 years programme from 2019-20.
1.2 All Weather Road
An all-weather road is one which is negotiable during all weathers, with some permitted interruptions. Essentially this means that at cross-drainage structures, the duration of overflow or interruption at one stretch shall not exceed 12 hours for ODRs and 24 hours for VRs in hilly terrain, and 3 days in the case of roads in plain terrain. The total period of interruption during the year should not exceed 10 days for ODRs and 15 days for VRs.
Project Backgriound
1.3 The launch of the PM JGUA Scheme marks a major effort to improve the living standards of tribal families in 63,000 villages. The scheme will emphasise "saturation coverage" in tribal-majority villages and aspirational districts. It is anticipated to benefit around 5 crore tribal individuals by improving their access to essential services and socio-economic opportunities. The Sub-project road , is a link road with Code in block of District. This road directly connects the habitations of with populations of respectively. Thus this link road serves the total population of 122 . BASTAR is panchayat H.Q. As per guidelines of PWD habitation which are grampanchayat . Even if the population is Above 500 will qualify uner PWD norms. So, this proposal is proposed for sanction. .
HABITAION AND VILLAGE AS PER MOTA LIST
The Sub-project road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA , is a link road with Code NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA in BASTAR block of BASTAR District. This road directly connects the habitations of NAWA RATENGA PARIPATPARA MUKHYAMARG with populations of 122 respectively. Thus this link road serves the total population of 122 . BASTAR is panchayat H.Q. As per guidelines of PWD habitation which are grampanchayat . Even if the population is Above 500 will qualify uner PWD norms. So, this proposal is proposed for sanction.
As the proposed road i.e. NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA is in BASTAR block of BASTAR (C.G) district, having topography same as BASTAR
Bastar is a district in the state of Chhattisgarh in Central India. Jagdalpur is the district headquarters. Bastar is bounded on the northwest by Narayanpur District, on the north by Kondagaon district, on the east by Nabarangpur and Koraput Districts of Odisha State, on the south and southwest by Dantewada and Sukma. The district possesses a unique blend of tribal and Odia culture. Bastar and Dantewada districts were formerly part of the princely state of Bastar. Bastar was founded in the early 14th century, by Annama Deva, the brother of Kakatiya King Pratapa Rudra Deva of Warangal in Telangana. After India achieved independence in 1947, the princely states of Bastar and Kanker acceded to the Government of India, and were merged to form Bastar district of Madhya Pradesh. The district, which had an area of 39,114 km2 (15,102 sq mi), was one of the largest in India when formed.
The total population of 122 will be get benefited by this project road. Total 1 number of Village will be get benefited by this project road (1) BADE BADRENGA The total population of will be get benefited by this project road. Total number of Village will be get benefited by this project road (1)
1.5 Climatic Condition
Bastar is a part of the Northern Hills agro – climatic region of Chhattisgarh. The climate of the district is characterized by a hot summer and well distributed rainfall (average 125 cm) during the monsoon season.
1.6 The Sub-Project Road
The proposed road is a Village road. This road starts from NAWA RATENGA PARIPATPARA MUKHYAMARG. from Ch. 00 km to 5.5 km, it passes through village habitation BADE BADRENGA . In that proposed road there is 15 existing crossdrainage structure. 200 1.5m Span Slab Culvert (Under Construction G.P)
900 2 X 900 mm Dia H.P.C
District:- BASTAR
Road Name:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Package No.:- CG-
Road Length:- 5.5 Km
Start Point: latitude 19.3658 0 N23 23.645 E82 52.291
End Point:- latitude 19.3463 N23.222464
longitude 81.929 E84.008645
Age of the proposed road:
Existing surface details of proposed road:
Pavement Condition Index (PCI) of the proposed road:
If existing PMGSY road is proposed partly or fully for upgradation/reconstruction, the following details needs to be updated in the DPR
Category of Road Sanctioned under PMGSY – N/U
Year and Batch of sanction : (PM JGUA)
Name of the road as per sanction : NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
T route/L route no as per sanction: L route
Sanctioned cost Rs. In lakhs:
Date of completion as per OMMAS :
PCI of the road :
This road is proposed for Up-gradation/Riding quality Improvement.
The road is proposed for both Up-gradation and Riding Quality Improvement.
Upgradation is proposed for the chainage from 00 to 5.5 Km
Riding Quality Improvement for the chainage from 00 Km.
Total length 5.5Km
This road ends to connect a habitation BADE BADRENGA at outside of village.
SL. NO PVTG HABITATION Population benefited PVTG UID ST POPULATION
Population CODE
1 Bade Badrenga 122 - 0
#REF! 0 0 #REF!
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) #REF!
CHAPTER2.PLANNING AND BASIC DESIGN CONSIDERATION
2.2 Preliminary alignment investigation
Strip plan showing land and alignment details
Strip plan Show In valume - II
2.3 Site Photographs
Site Photographs are enclosed here.
2.4 Road Design Brief
Proposed road is designed as per specification given in IRC SP -72 2015 for flexible pavement and reference given in MORD Rural Road Manual.
Sl.No. Location Issue Design Solutions Deficiency in view of road safety and remedies proposed
1 0 to 30000m In this section alignment passing through open area, existing BT road in average condition with 3.75m width. As the sufficient width available, B.T. Road Proposed with proper cross drainage structure with maintain proper geometrics. Ex. BT Road are in damage condition, scarify ex, BT Road till WMM Layer , Due to lack of Road width both side widening by GSB +WMM , Take WMM+BM+OGPC with Seal Coat to achive 5.50 m Road top width. as per design.
2 0 to 8075m in this section road passes from habitation area having existing CC road in with 3.75 m width From CC Road are in damage condition, required wearing coat on top of the Ex. 3.75 m Carriage way. Due to lack of Road width both side widening by M-30 to achive 5.50 m Road top width.
3 8075 to 8350m in this section earthen road. New road proposed as per design.
4 8350 to 8625m in this section existing BT road in average condition with 3.00 m width. Loosening, Levelling and Compacting the existing BT Road then provide GSB, WMM & BT as per design.
5 8625 to 8900m in this section road passes from habitation area having existing CC road in good condition with 4.0 m width No Provision.
6 8900 to 15500m in this section existing BT road in average condition with 3.00 m width. Loosening, Levelling and Compacting the existing BT Road then provide GSB, WMM & BT as per design.
2.5 Transect Walk Summary
Proposed walk was coordinate on date 15-03-2025 along with department engineer, Revenue officials, sarpanch and member. Incorporated the suggestion and as per site condition the road is designed with RTL average 0.60m above ground level. The traffic survey, soil investigation, borrow material availability, Topographical survey and requirment was examined accordingly. The road was designed as per provisions of IRC: SP: 72 – 2015 and Rural road specifications. it is propose to provide all weather road with 20mm OGPC Seal Coat , carrigeway width with providing no13 cross drainage structure .................along with department engineer, Revenue officials, sarpanch and member. Incorporated the suggestion and as per site condition the road is designed with RTL average 1.05m above ground level. The traffic survey, soil investigation, borrow material availability, Topographical survey and requirment was examined accordingly. The road was designed as per provisions of IRC: SP: 72 – 2015 and Rural road specifications. it is propose to provide all weather road with 20mm OGPC Seal Coat , carrigeway width with providing .......... no. cross drainage structure 13
Chainage Existing Land Width* Additional Land Required Type of Loss Village Remarks/Suggestions
LHS RHS LHS RHS
0 7 2.5 2.5 Village Village
100 6 3 3 Village Village
350 6.5 2.75 2.75 Village Village
500 8 2 2 Village Village
600 7.5 2.25 2.25 Agl Land Agl Land 10
720 6.85 2.575 2.575 Agl Land Agl Land 605
800 7.65 2.175 2.175 Agl Land Agl Land 3250
830 8 2 2 Agl Land Agl Land 5550
900 10.25 0.875 0.875 Agl Land Agl Land
960 11 0.5 0.5 Agl Land Agl Land
1020 12 0 0 Agl Land Agl Land
1100 11.9 0.05 0.05 Agl Land Agl Land
1130 10 1 1 Agl Land Agl Land
1200 11.2 0.4 0.4 Agl Land Agl Land
1350 11.5 0.25 0.25 Agl Land Agl Land
1500 8 2 2 Agl Land Agl Land
1600 9 1.5 1.5 Agl Land Agl Land
1850 9.5 1.25 1.25 Agl Land Agl Land
2000 8 2 2 Agl Land Agl Land
2350 9 1.5 1.5 Agl Land Agl Land
2500 8.5 1.75 1.75 Agl Land Agl Land
2800 9 1.5 1.5 Agl Land Agl Land
3000 10.5 0.75 0.75 Agl Land Agl Land
3200 7.5 2.25 2.25 Agl Land Agl Land
3800 7 2.5 2.5 Village Village
4300 6 3 3 Village Village
4800 5.5 3.25 3.25 Village Village
5100 5 3.5 3.5 Village Village
7800 9 1.5 1.5 Village Village
8000 7.2 2.4 2.4 Village Village
8400 6.56 2.72 2.72 Village Village
8600 8 2 2 Village Village
9000 9.75 1.125 1.125 Village Village
9400 9.9 1.05 1.05 Village Village
9600 8.5 1.75 1.75 Village Village
1000 6.9 2.55 2.55 Village Village
10600 7.9 2.05 2.05 Village Village
10700 8 2 2 Village Village
10800 9 1.5 1.5 Village Village
1100 7.5 2.25 2.25 Village Village
11300 8 2 2 Village Village
11350 9.3 1.35 1.35 Village Village
11800 7.6 2.2 2.2 Village Village
12000 9 1.5 1.5 Village Village
12300 10.35 0.825 0.825 Village Village
12500 11 0.5 0.5 Village Village
12800 10.2 0.9 0.9 Village Village
12900 9.8 1.1 1.1 Village Village
13250 8.3 1.85 1.85 Village Village
13950 8.9 1.55 1.55 Village Village
14000 10 1 1 Village Village
14300 11.35 0.325 0.325 Village Village
14600 11.6 0.2 0.2 Village Village
14900 9 1.5 1.5 Village Village
15020 7.8 2.1 2.1 Village Village
15200 8.8 1.6 1.6 Village Village
15400 9.8 1.1 1.1 Village Village
15500 10.8 0.6 0.6 Village Village
1 Total No. of People present for the Transect walk :
Male : , Female: , Total :
2 Demographic information where the Walk was conducted :
3 No. of Govt. Employees present :
4 No. of Contractors Employees :
5 No. of participants from Minority community :
SC: , ST: Women :
6 No. of SHG members participated :
7 Enclose a separate sheet with names, designation (if Govt. Employee, or Elected Representative, SHG members) and Signatures of participants of transect walk
Transect walk done Yes No
Photographs of Transect walk attached Yes No
Transect walk summary table included Yes No
Minutes of Transect walk attached Yes No
Photographs at 100 m intervals taken Yes No
Major changes in alignment perceived Yes No
Design brief provided Yes No
Photographs of Grama Sabha attached Yes No
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
DPR Consultant Sub Engineer Assistant Engineer
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
Figure-IV ( ROAD ALLIGMENT MARK IN GOOGLE EARTH & POINT MARKS BY GARMIN HAND GPS.)
Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
NEW PROPOSED & REPLACE
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Length 5500.00 m
0 CD-14 0 0 Gali No 2 (L= 200 m) RHS
NEW PROPOSED CD-13 5910 1.50 m Span Slab Culvert
NEW PROPOSED CD-12 5460 5R X 1000mm Dia H.P.C
NEW PROPOSED CD-11 5060 1R X 1000mm Dia H.P.C
REPLACEMENT CD-10 3950 1R X 1000mm Dia H.P.C Gali No 1 (L= 400 m) RHS
REPLACEMENT CD-9 3720 1.50 m Span Slab Culvert
REPLACEMENT CD-8 3100 1R X 1000mm Dia H.P.C #REF! #REF!
REPLACEMENT CD-7 2850 1R X 1000mm Dia H.P.C #REF! #REF!
REPLACEMENT CD-6 2760 1R X 1000mm Dia H.P.C #REF! #REF!
NEW PROPOSED CD-5 2680 1R X 1000mm Dia H.P.C
NEW PROPOSED CD-4 2200 1R X 1000mm Dia H.P.C
NEW PROPOSED CD-3 1700 1R X 1000mm Dia H.P.C
REPLACEMENT CD-2 215 1R X 1000mm Dia H.P.C
REPLACEMENT CD-1 5 1R X 1000mm Dia H.P.C
NOT IN SCALE: START
NEW PROPOSED & REPLACE
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Length 5500.00 m
0 CD-35 0 0 Gali No 2 (L= 200 m) RHS
0 CD-31 0 0 Gali No 1 (L= 400 m) RHS
0 CD-29 0 0 #REF! #REF!
0 CD-28 0 0 #REF! #REF!
0 CD-27 0 0 #REF! #REF!
EXISTING CULVERT
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Length 5500.00 m
DAMAGE CONDITION CD-15 5455 1.50 m Span Slab Culvert
GOOD CONDITION CD-14 4685 1.50 m Span Slab Culvert Gali No 2 (L= 200 m) RHS
GOOD CONDITION CD-13 4575 1.50 m Span Slab Culvert
GOOD CONDITION CD-12 4476 3.0 m Span Slab Culvert
GOOD CONDITION CD-11 3712 6.0 m Span Slab Culvert
GOOD CONDITION CD-10 3475 1.50 m Span Slab Culvert Gali No 1 (L= 400 m) RHS
GOOD CONDITION CD-9 3110 1.50 m Span Slab Culvert
GOOD CONDITION CD-8 2890 1.50 m Span Slab Culvert #REF! #REF!
GOOD CONDITION CD-7 2400 1.50 m Span Slab Culvert #REF! #REF!
GOOD CONDITION CD-6 2250 1.50 m Span Slab Culvert #REF! #REF!
GOOD CONDITION CD-5 2015 1.50 m Span Slab Culvert
GOOD CONDITION CD-4 1615 1.50 m Span Slab Culvert
DAMAGE CONDITION CD-3 920 1.50 m Span Slab Culvert
GOOD CONDITION CD-2 480 BRIDGE 470 TO 510M.
GOOD CONDITION CD-1 225 2R X 1000MM DIA H.P.C
NOT IN SCALE: Start
EXISTING CULVERT
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Length 5500.00 m
0 CD-35 0 0 Gali No 2 (L= 200 m) RHS
0 CD-31 0 0 Gali No 1 (L= 400 m) RHS
0 CD-29 0 0 #REF! #REF!
0 CD-28 0 0 #REF! #REF!
0 CD-27 0 0 #REF! #REF!
NOT IN SCALE: Start
EXISTING CULVERT
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Length 5500.00 m
0 CD-34 0 0 Gali No 2 (L= 200 m) RHS
0 CD-30 0 0 Gali No 1 (L= 400 m) RHS
0 CD-28 0 0 #REF! #REF!
0 CD-27 0 0 #REF! #REF!
0 CD-26 0 0 #REF! #REF!
ROAD STRIP PLAN
NAME OF ROAD :-NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
PROPOSED ROAD END HERE 5510 PROPOSED ROAD END HERE
Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
CHAPTER 3.TOPOGRAPHIC SURVEY
Topographic survey true to ground realties have been done using auto levels, and bringing out data in digital form (x,y,z format) for developing digital terrain model (DTM) and using auto level for leveling survey.
The in-house standards, work procedures and quality plan has to be prepared with reference to IRC: SP 48-1984, IRC:73-1980, IRC: SP 19-2001, IRC: SP 20-2002, IRC: SP 13-2004 (in respect of surveys for rivers/streams) and current international practices to be followed during the above survey.
The traverse consists of a series of straight lines with their lengths and intermediates angles measured very carefully. In difficult terrain, the alignment may have to be negotiated through a series of short chords, preferably, the traverse should be done with a Theodolite with Electronic Distance Measurement (EDM) and all angles measured with double reversal method. Global Positioning System (GPS) is also very useful and appropriate for preliminary survey. The GPS will give locations in coordinates all the necessary points on the traverse. GPS is very fast reasonably accurate for preliminary system and computer friendly for data transfer. Control pillars in cement concrete should be fixed at suitable interval (ranging from 500 m to 2 kms) to have control on accuracy. It also helps in repeating the survey, if required, within the control pillars.
Traverse is to be done preferably by total station having angular measurement accuracy of ± 1 sec.
Levelling has been done by auto level interval of 25m taken offset from centre four reading both side. And bearing were taken by compass survey. For cross-checking fly survery has been done. Precise levelling is a particularly accurate method of differential levelling which uses highly accurate levels and with a more rigorous observing procedure than general engineering levelling. It aims to achieve high orders of accuracy such as 1 mm per 1 km traverse. A level surface is a surface which is everywhere perpendicular to the direction of the force of gravity. An example is the surface of a completely still lake. For ordinary levelling, level surfaces at different elevations can be considered to be parallel.
Precise levelling is a particularly accurate method of differential levelling which uses highly accurate levels and with a more rigorous observing procedure than general engineering levelling. It aims to achieve high orders of accuracy such as 1 mm per 1 km traverse. A level surface is a surface which is everywhere perpendicular to the direction of the force of gravity. An example is the surface of a completely still lake. For ordinary levelling, level surfaces at different elevations can be considered to be parallel.
A level datum is an arbitrary level surface to which elevations are referred. The most common surveying datum is mean sea-level (MSL), but as hydrological work is usually just concerned with levels in a local area, we often use: An assumed datum, which is established by giving a benchmark an assumed value (e.g. 100.000 m) to which all levels in the local area will be reduced. It is not good practice to assume a level which is close to the actual MSL value, as it creates potential for confusion.
A reduced level is the vertical distance between a survey point and the adopted level datum.
A bench mark (BM) is the term given to a definite, permanent accessible point of known height above a datum to which the height of other points can be referred. It is usually a stainless steel pin embedded in a substantial concrete block cast into the ground. At hydrological stations rock bolts driven into bedrock or concrete structures can be used, but structures should be used warily as they themselves are subject to settlement. The locations of benchmarks shall be marked with BM marker posts and/or paint, and recorded on the Station History Form.List of TBM atteched in 3.6
The first observation is made to the known point and is termed a backsight; the last observation is to the final point or the next to be measured on the run, and all other points are intermediates
A close is the difference between the starting level of the initial point for the outward run and that determined at the end of the return run. If the levels have been reduced correctly this value should be the same as the difference between the sum of the rises and falls and also the difference between the sum of the backsights and foresights.
Height of Collimation is the elevation of the optical axis of the telescope at the time of the setup.
3.4 Cross Section & Detailing
Cross sections were taken at 25 m interval and at closer interval in curved portion of the existing road. All physical features of the road were recorded.
Generally, cross section has been taken at every 25m interval, and taten four offset reading from centre both side of road. Offset distance are 0, 1.50, 3.0, 5.00, 7.50.
3.5 Data Processing
All data from topographic survey recorded by auto level were downloaded in Auto plotter and final alignment, plan, profile were prepared and presented in AutoCAD Format.
3.6 To facilitate the leveling work, bench marks, either temporary or permanent, should be established at intervals of 250 to 500 metres.The levels should be connected to GTS datum.
S. No. Description Location of BM/TBM REMARK Main!A1
TBM-1 TBM ON TREE 0
TBM-2 TBM ON E.P 477
TBM-3 TBM ON E.P 850
TBM-4 TBM ON E.P 1300
TBM-5 TBM ON K.M STONE 3000
TBM-6 TBM ON E.P 4650
Reference pillars given Yes No
TBM with northing-easting given Yes No
Traverse survey carried out Yes No
Cross section and detailing carried out Yes No
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur)
CHAPTER 4. SOIL AND MATERIALS SURVEY
The soil and material investigations were done following the guidelines of IRC: SP: 20-2002 and IRC: SP: 72-2015 and other relevant IS codes. The potential sources of borrow areas for soil and quarry sites will be identified
4.2 Soil sample collection and Testing
Soil samples are to be collected along and around the road alignment at three (3) locations per km, from the adjoining borrow areas, as well as one sample is to be collected from the existing road. Soil Classification tests like grain size analysis and Atterberg’s limit are to be conducted for all the samples collected. Standard Proctor test and the corresponding 4 day soaked CBR test are to be conducted either for a minimum of one test per km for soil samples of same group or more tests due to variation of soil type. The following tests are to be conducted as detailed below:
• • Grain size analysis as per IS : 2720 (Part 4) – 1985
• • Atterberg’s limit as per IS : 2720 (Part 5) – 1985
• • Standard Proctor density test as per IS : 2720 (Part 7) – 1980
• • 4 day soaked CBR test as per IS : 2720 (Part 16) – 1987
Summary of Test
S.No. Location CBR (%) MDD gm/cc OMC (%)
As the soil of CBR 5% to 6% available , it is suitable for embankement construction.
4.3 Analysis of Test Results
The laboratory soaked CBR value ranges from 5% to 6% The soil laboratory test results are summarized in Table 4.1
Table 4.1 CBR values for different stretches
Sl.No. Section CBR (%) MDD Optimum Moisture Content (OMC)
4.4 Coarse and Fine Aggregates
Quarries Details
Sr no Material Location/Description Distance (From '0' point of the road)
1 Sand Local 10-15 Km
2 GSB Local 5-10 Km
3 Cement RAIPUR 350-450 Km
4 Metal Local 35- 40Km
5 Emulsion RAIPUR 350-450 Km
4.5 Sub-soil investigation for bridges
Where the rock or some firm undisturbed soil stratum is not likely to be far below the alluvial bed of the stream , a trail pit should be dug down to such rock or firm soil . But if there is no rock or undisturbed firm soil for a great depth below the stream bed level , then the trail pit may be taken down roughly 2 to 3 meter below the lowest bed level . The location of each trail pit should be shown in the cross section of the proposed site . The trail pit section should be plotted to show the kind of soil passed through . However depth of trail pit in soil shall minimum 2 m for culverts and 3 m for small bridges .
Borrow pit suitable Yes No
SSI for existing ground Yes No
Investigation for coarse/fine aggregate Yes No
Quarry map Yes No
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
NO. Nme of road CH CBR (%) MDD gm/cc OMC (%)
1 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.52 1.76 14.94
2 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.44 1.76 15.04
3 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.94 1.77 15.14
4 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.75 1.78 15.44
5 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.67 1.79 15.54
6 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.75 1.8 15.69
7 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.25 1.81 15.79
8 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.40 1.83 15.79
9 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.75 1.81 15.89
10 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.33 1.74 16.04
11 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.59 1.75 15.04
12 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 960 5.40 1.76 15.19
13 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 1800 5.21 1.77 15.24
14 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 3000 5.59 1.78 15.49
15 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 4000 5.25 1.79 15.59
16 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 4800 5.48 1.8 15.79
17 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5500 5.40 1.81 15.75
18 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.17 1.83 15.78
19 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.63 1.81 15.85
20 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.52 1.74 16.16
21 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.59 1.75 15.06
22 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.69 1.71 15.34
23 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.57 1.72 15.4
24 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.74 1.72 15.53
25 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.90 1.79 15.69
26 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.63 1.8 15.8
27 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.59 1.81 15.78
28 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.21 1.83 15.75
29 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.82 1.81 15.81
30 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.90 1.74 16.29
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 1
Location:- Rd 0 Proving Ring Factor 1.580 2
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 8 8 10
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.52 %
Av. C.B.R. at 5.0 mm penetration: 4.73 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 8.99 8.89 8.79
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.44 %
Av. C.B.R. at 5.0 mm penetration: 4.80 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 8.98 8.88 8.78
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.94 %
Av. C.B.R. at 5.0 mm penetration: 4.93 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 8.98 8.88 8.78
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.75 %
Av. C.B.R. at 5.0 mm penetration: 5.01 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 8.96 8.86 8.76
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.67 %
Av. C.B.R. at 5.0 mm penetration: 4.85 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 8.965 8.865 8.765
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.75 %
Av. C.B.R. at 5.0 mm penetration: 5.06 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 8.962 8.862 8.762
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.25 %
Av. C.B.R. at 5.0 mm penetration: 4.57 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 8.963 8.863 8.763
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.40 %
Av. C.B.R. at 5.0 mm penetration: 4.73 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.75 %
Av. C.B.R. at 5.0 mm penetration: 4.96 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.33 %
Av. C.B.R. at 5.0 mm penetration: 4.70 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.59 %
Av. C.B.R. at 5.0 mm penetration: 4.85 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 960 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.40 %
Av. C.B.R. at 5.0 mm penetration: 4.65 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 1800 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.21 %
Av. C.B.R. at 5.0 mm penetration: 4.65 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 3000 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.59 %
Av. C.B.R. at 5.0 mm penetration: 4.90 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 4000 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.25 %
Av. C.B.R. at 5.0 mm penetration: 4.78 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 4800 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.48 %
Av. C.B.R. at 5.0 mm penetration: 4.73 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 5500 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.40 %
Av. C.B.R. at 5.0 mm penetration: 4.73 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.17 %
Av. C.B.R. at 5.0 mm penetration: 4.85 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.63 %
Av. C.B.R. at 5.0 mm penetration: 4.83 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.52 %
Av. C.B.R. at 5.0 mm penetration: 4.73 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.59 %
Av. C.B.R. at 5.0 mm penetration: 4.83 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.69 %
Av. C.B.R. at 5.0 mm penetration: 4.79 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.57 %
Av. C.B.R. at 5.0 mm penetration: 4.76 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.74 %
Av. C.B.R. at 5.0 mm penetration: 4.93 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.90 %
Av. C.B.R. at 5.0 mm penetration: 4.98 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.63 %
Av. C.B.R. at 5.0 mm penetration: 4.78 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.59 %
Av. C.B.R. at 5.0 mm penetration: 4.78 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.21 %
Av. C.B.R. at 5.0 mm penetration: 4.60 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.82 %
Av. C.B.R. at 5.0 mm penetration: 5.06 %
CBR Test of Soil
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0 Proving Ring Factor 1.580
Time of Penetration @ 1.25mm/Min Penetration Coordinate at X axis for the Penetration Values Proving Ring Reading Unsoaked/Soaked CBR (%) C x 100/D Average CBR (%) 9 9.1 9.2
Min - Sec. (mm) (mm) I II III I II III I II III Std. I ii iii
Av. C.B.R. at 2.5 mm penetration: 5.90 %
Av. C.B.R. at 5.0 mm penetration: 5.08 %
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6000 gm
Wt of mould (gm) 4450
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.760
Optimum moisture content 14.9 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6250 gm
Wt of mould (gm) 4650
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.760
Optimum moisture content 15.0 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6500 gm
Wt of mould (gm) 4840
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.770
Optimum moisture content 15.1 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 7000 gm
Wt of mould (gm) 5430
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.780
Optimum moisture content 15.4 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6800 gm
Wt of mould (gm) 5130
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.790
Optimum moisture content 15.5 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6300 gm
Wt of mould (gm) 5360
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.800
Optimum moisture content 15.7 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6150 gm
Wt of mould (gm) 5430
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.810
Optimum moisture content 15.8 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6400 gm
Wt of mould (gm) 5580
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.830
Optimum moisture content 15.8 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6740 gm
Wt of mould (gm) 5790
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.810
Optimum moisture content 15.9 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 7150 gm
Wt of mould (gm) 6050
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.740
Optimum moisture content 16.0 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6830 gm
Wt of mould (gm) 5500
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.750
Optimum moisture content 15.0 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 960
Weight of Dry Soil: 6740 gm
Wt of mould (gm) 5680
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.760
Optimum moisture content 15.2 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 1800
Weight of Dry Soil: 6450 gm
Wt of mould (gm) 5190
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.770
Optimum moisture content 15.2 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 3000
Weight of Dry Soil: 6380 gm
Wt of mould (gm) 4680
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.780
Optimum moisture content 15.5 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 4000
Weight of Dry Soil: 6550 gm
Wt of mould (gm) 4880
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.790
Optimum moisture content 15.6 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 4800
Weight of Dry Soil: 6750 gm
Wt of mould (gm) 5000
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.800
Optimum moisture content 15.8 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 5500
Weight of Dry Soil: 6850 gm
Wt of mould (gm) 5200
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.810
Optimum moisture content 15.8 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6580 gm
Wt of mould (gm) 4980
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.830
Optimum moisture content 15.8 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6850 gm
Wt of mould (gm) 4730
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.810
Optimum moisture content 15.9 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 7150 gm
Wt of mould (gm) 5480
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.740
Optimum moisture content 16.2 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6900 gm
Wt of mould (gm) 5050
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.750
Optimum moisture content 15.1 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6330 gm
Wt of mould (gm) 5010
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.710
Optimum moisture content 15.34 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6840 gm
Wt of mould (gm) 5760
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.720
Optimum moisture content 15.4 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6390 gm
Wt of mould (gm) 4770
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.720
Optimum moisture content 15.5 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6550 gm
Wt of mould (gm) 4970
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.790
Optimum moisture content 15.7 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 7050 gm
Wt of mould (gm) 5130
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.800
Optimum moisture content 15.8 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 5730 gm
Wt of mould (gm) 4760
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.810
Optimum moisture content 15.8 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6850 gm
Wt of mould (gm) 4730
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.830
Optimum moisture content 15.8 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 6130 gm
Wt of mould (gm) 4540
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.810
Optimum moisture content 15.8 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
Proctor Density Test of Soil
AS PER (IS: 2720 Part-7) - 1983
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Location:- Rd 0
Weight of Dry Soil: 7150 gm
Wt of mould (gm) 5560
Type of test ;- Standard Proctor
Volume of mould (cc) : CC 1000
Moisture content determination
Sr. Weight of mould + compacted soil (gms) Weight of wet soil (gms) Wet density (gn./cc) Container No. Weight of container (gms) Weight of container + wet soil (gms) Weight of dry soil (Ws) (gms) Weight of water (gms) Weight of container +Dry soil (gms) Moisture Content (%) Dry density (gm/cc)
Maximum dry density 1.740
Optimum moisture content 16.3 %
Maximum dry density 1.7
Optimum moisture content 15.5
Checked By: Tested By:
NO. Nme of road Location date LL PL PI 2 0.425 0.075
1 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 32.13 20.96 11.17 #REF! #REF! #REF!
2 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 31.53 20.83 10.69 #REF! #REF! #REF!
3 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 31.57 20.22 11.35 #REF! #REF! #REF!
4 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 30.43 20.10 10.33 #REF! #REF! #REF!
5 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 28.57 16.88 11.69 #REF! #REF! #REF!
6 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 31.17 19.87 11.30 #REF! #REF! #REF!
7 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 31.66 20.34 11.32 #REF! #REF! #REF!
8 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 31.36 20.83 10.53 #REF! #REF! #REF!
9 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 34.57 20.71 13.86 #REF! #REF! #REF!
10 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 30.79 20.58 10.21 #REF! #REF! #REF!
11 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 36.20 25.88 10.32 #REF! #REF! #REF!
12 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 960 15/Mar/2025 36.72 26.08 10.65 #REF! #REF! #REF!
13 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 1800 15/Mar/2025 36.76 25.92 10.84 #REF! #REF! #REF!
14 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 3000 15/Mar/2025 36.69 26.55 10.14 #REF! #REF! #REF!
15 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 4000 15/Mar/2025 37.18 26.39 10.79 #REF! #REF! #REF!
16 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 4800 15/Mar/2025 37.27 27.05 10.23 #REF! #REF! #REF!
17 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5500 15/Mar/2025 37.99 27.73 10.26 #REF! #REF! #REF!
18 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 38.53 28.46 10.08 #REF! #REF! #REF!
19 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 38.62 28.27 10.35 #REF! #REF! #REF!
20 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 34.29 23.30 11.00 #REF! #REF! #REF!
21 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 27.56 17.09 10.47 #REF! #REF! #REF!
22 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 27.06 16.28 10.78 #REF! #REF! #REF!
23 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 36.54 25.62 10.92 #REF! #REF! #REF!
24 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 39.55 27.52 12.02 #REF! #REF! #REF!
25 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 33.16 22.27 10.90 #REF! #REF! #REF!
26 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 27.65 16.59 11.05 #REF! #REF! #REF!
27 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 36.74 25.62 11.12 #REF! #REF! #REF!
28 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 35.59 24.47 11.12 #REF! #REF! #REF!
29 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 27.98 17.62 10.36 #REF! #REF! #REF!
30 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 0 15/Mar/2025 33.91 22.81 11.10 #REF! #REF! #REF!
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 32.13 20.96
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 31.53 20.83
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 31.57 20.22
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 30.43 20.10
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 28.57 16.88
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 31.17 19.87
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 31.66 20.34
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 31.36 20.83
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 34.57 20.71
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 30.79 20.58
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 36.20 25.88
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 960
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 36.72 26.08
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 1800
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 36.76 25.92
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 3000
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 36.69 26.55
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 4000
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 37.18 26.39
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 4800
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 37.27 27.05
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 5500
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 37.99 27.73
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 38.53 28.46
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 38.62 28.27
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 34.29 23.30
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 27.56 17.09
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 27.06 16.28
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 36.54 25.62
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 39.55 27.52
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 33.16 22.27
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 27.65 16.59
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 36.74 25.62
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 35.59 24.47
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 27.98 17.62
Checked By Tested By
PRADHAN MANTRI GRAM SADAK YOJNA
Atterberg Limits Test
Type of Sample Embankement Soil
Name of the Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Date of testing :- 15-Mar-25
Sample submitted / collected by _
Other Details (if any) PIU BASTAR Location :- 0
Description Liquid Limit (LL) Plastic Limit (PL)
AVERAGE 33.91 22.81
Checked By Tested By
NAME OF ROAD:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
DISTRICT NAME BASTAR
BLOCK NAME BASTAR
DATE 15/Mar/2025
WEIGHT OF SAMPLE 12000 GRAM
Construction of rural Road under Pradhan Mantri Gram Sadak Yojna (PMGSY)
(Ministry of Rural Roads Govt. of India)
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
Project Implementation Unit - CHHATTISGARH
DETERMINATION OF PARTICLE SIZE DISTRIBUTION (WET/DRY)
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Source /Location 0
Name of District BASTAR Date of testing 15/Mar/25
Name of Block BASTAR Wt. of Sample 12000 gm
CLAY CLAY SAND GRAVEL
FINE MEDIUM COARSE FINE COARSE
SIEVE 40mm 25mm 20mm 10mm 4.75mm 2.36mm 1.18mm 600m 300m 150m 75m
Construction of rural Road under Pradhan Mantri Gram Sadak Yojna (PMGSY)
(Ministry of Rural Roads Govt. of India)
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
Project Implementation Unit - CHHATTISGARH
DETERMINATION OF PARTICLE SIZE DISTRIBUTION (WET/DRY)
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Source /Location 0
Name of District BASTAR Date of testing 15/Mar/2025
Name of Block BASTAR Wt. of Sample 11000 gm
CLAY CLAY SAND GRAVEL
FINE MEDIUM COARSE FINE COARSE
SIEVE 40mm 25mm 20mm 10mm 4.75mm 2.36mm 1.18mm 600m 300m 150m 75m
Construction of rural Road under Pradhan Mantri Gram Sadak Yojna (PMGSY)
(Ministry of Rural Roads Govt. of India)
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
Project Implementation Unit - CHHATTISGARH
DETERMINATION OF PARTICLE SIZE DISTRIBUTION (WET/DRY)
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Source /Location 960
Name of District BASTAR Date of testing 15/Mar/2025
Name of Block BASTAR Wt. of Sample 11800 gm
CLAY CLAY SAND GRAVEL
FINE MEDIUM COARSE FINE COARSE
SIEVE 40mm 25mm 20mm 10mm 4.75mm 2.36mm 1.18mm 600m 300m 150m 75m
Construction of rural Road under Pradhan Mantri Gram Sadak Yojna (PMGSY)
(Ministry of Rural Roads Govt. of India)
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
Project Implementation Unit - CHHATTISGARH
DETERMINATION OF PARTICLE SIZE DISTRIBUTION (WET/DRY)
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Source /Location 1800
Name of District BASTAR Date of testing 15/Mar/2025
Name of Block BASTAR Wt. of Sample 12500 gm
CLAY CLAY SAND GRAVEL
FINE MEDIUM COARSE FINE COARSE
SIEVE 40mm 25mm 20mm 10mm 4.75mm 2.36mm 1.18mm 600m 300m 150m 75m
Construction of rural Road under Pradhan Mantri Gram Sadak Yojna (PMGSY)
(Ministry of Rural Roads Govt. of India)
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
Project Implementation Unit - CHHATTISGARH
DETERMINATION OF PARTICLE SIZE DISTRIBUTION (WET/DRY)
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Source /Location 3000
Name of District BASTAR Date of testing 15/Mar/2025
Name of Block BASTAR Wt. of Sample 12400 gm
CLAY CLAY SAND GRAVEL
FINE MEDIUM COARSE FINE COARSE
SIEVE 40mm 25mm 20mm 10mm 4.75mm 2.36mm 1.18mm 600m 300m 150m 75m
Construction of rural Road under Pradhan Mantri Gram Sadak Yojna (PMGSY)
(Ministry of Rural Roads Govt. of India)
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
Project Implementation Unit - CHHATTISGARH
DETERMINATION OF PARTICLE SIZE DISTRIBUTION (WET/DRY)
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Source /Location 4000
Name of District BASTAR Date of testing 15/Mar/2025
Name of Block BASTAR Wt. of Sample 13100 gm
CLAY CLAY SAND GRAVEL
FINE MEDIUM COARSE FINE COARSE
SIEVE 40mm 25mm 20mm 10mm 4.75mm 2.36mm 1.18mm 600m 300m 150m 75m
Construction of rural Road under Pradhan Mantri Gram Sadak Yojna (PMGSY)
(Ministry of Rural Roads Govt. of India)
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
Project Implementation Unit - CHHATTISGARH
DETERMINATION OF PARTICLE SIZE DISTRIBUTION (WET/DRY)
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Source /Location 4800
Name of District BASTAR Date of testing 15/Mar/2025
Name of Block BASTAR Wt. of Sample 12800 gm
CLAY CLAY SAND GRAVEL
FINE MEDIUM COARSE FINE COARSE
SIEVE 40mm 25mm 20mm 10mm 4.75mm 2.36mm 1.18mm 600m 300m 150m 75m
Construction of rural Road under Pradhan Mantri Gram Sadak Yojna (PMGSY)
(Ministry of Rural Roads Govt. of India)
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
Project Implementation Unit - CHHATTISGARH
DETERMINATION OF PARTICLE SIZE DISTRIBUTION (WET/DRY)
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Source /Location 5500
Name of District BASTAR Date of testing 15/Mar/2025
Name of Block BASTAR Wt. of Sample 13200 gm
CLAY CLAY SAND GRAVEL
FINE MEDIUM COARSE FINE COARSE
SIEVE 40mm 25mm 20mm 10mm 4.75mm 2.36mm 1.18mm 600m 300m 150m 75m
Construction of rural Road under Pradhan Mantri Gram Sadak Yojna (PMGSY)
(Ministry of Rural Roads Govt. of India)
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
Project Implementation Unit - CHHATTISGARH
DETERMINATION OF PARTICLE SIZE DISTRIBUTION (WET/DRY)
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Source /Location 0
Name of District BASTAR Date of testing 15/Mar/2025
Name of Block BASTAR Wt. of Sample 14000 gm
CLAY CLAY SAND GRAVEL
FINE MEDIUM COARSE FINE COARSE
SIEVE 40mm 25mm 20mm 10mm 4.75mm 2.36mm 1.18mm 600m 300m 150m 75m
Construction of rural Road under Pradhan Mantri Gram Sadak Yojna (PMGSY)
(Ministry of Rural Roads Govt. of India)
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
Project Implementation Unit - CHHATTISGARH
DETERMINATION OF PARTICLE SIZE DISTRIBUTION (WET/DRY)
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Source /Location 0
Name of District BASTAR Date of testing 15/Mar/2025
Name of Block BASTAR Wt. of Sample 13800 gm
CLAY CLAY SAND GRAVEL
FINE MEDIUM COARSE FINE COARSE
SIEVE 40mm 25mm 20mm 10mm 4.75mm 2.36mm 1.18mm 600m 300m 150m 75m
Construction of rural Road under Pradhan Mantri Gram Sadak Yojna (PMGSY)
(Ministry of Rural Roads Govt. of India)
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
Project Implementation Unit - CHHATTISGARH
DETERMINATION OF PARTICLE SIZE DISTRIBUTION (WET/DRY)
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Source /Location 0
Name of District BASTAR Date of testing 15/Mar/2025
Name of Block BASTAR Wt. of Sample 13500 gm
CLAY CLAY SAND GRAVEL
FINE MEDIUM COARSE FINE COARSE
SIEVE 40mm 25mm 20mm 10mm 4.75mm 2.36mm 1.18mm 600m 300m 150m 75m
Construction of rural Road under Pradhan Mantri Gram Sadak Yojna (PMGSY)
(Ministry of Rural Roads Govt. of India)
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
Project Implementation Unit - CHHATTISGARH
DETERMINATION OF PARTICLE SIZE DISTRIBUTION (WET/DRY)
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Source /Location 0
Name of District BASTAR Date of testing 15/Mar/2025
Name of Block BASTAR Wt. of Sample 12000 gm
CLAY CLAY SAND GRAVEL
FINE MEDIUM COARSE FINE COARSE
SIEVE 40mm 25mm 20mm 10mm 4.75mm 2.36mm 1.18mm 600m 300m 150m 75m
Construction of rural Road under Pradhan Mantri Gram Sadak Yojna (PMGSY)
(Ministry of Rural Roads Govt. of India)
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
Project Implementation Unit - CHHATTISGARH
DETERMINATION OF PARTICLE SIZE DISTRIBUTION (WET/DRY)
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Source /Location 0
Name of District BASTAR Date of testing 15/Mar/2025
Name of Block BASTAR Wt. of Sample 11800 gm
CLAY CLAY SAND GRAVEL
FINE MEDIUM COARSE FINE COARSE
SIEVE 40mm 25mm 20mm 10mm 4.75mm 2.36mm 1.18mm 600m 300m 150m 75m
Construction of rural Road under Pradhan Mantri Gram Sadak Yojna (PMGSY)
(Ministry of Rural Roads Govt. of India)
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
Project Implementation Unit - CHHATTISGARH
DETERMINATION OF PARTICLE SIZE DISTRIBUTION (WET/DRY)
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Source /Location 0
Name of District BASTAR Date of testing 15/Mar/2025
Name of Block BASTAR Wt. of Sample 11500 gm
CLAY CLAY SAND GRAVEL
FINE MEDIUM COARSE FINE COARSE
SIEVE 40mm 25mm 20mm 10mm 4.75mm 2.36mm 1.18mm 600m 300m 150m 75m
Construction of rural Road under Pradhan Mantri Gram Sadak Yojna (PMGSY)
(Ministry of Rural Roads Govt. of India)
PANCHAYAT AND CHHATTISGARH RURAL ROAD DEVELOPMENT DEPARTMENT
Project Implementation Unit - CHHATTISGARH
DETERMINATION OF PARTICLE SIZE DISTRIBUTION (WET/DRY)
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Source /Location 0
Name of District BASTAR Date of testing 15/Mar/2025
Name of Block BASTAR Wt. of Sample 10900 gm
CLAY CLAY SAND GRAVEL
FINE MEDIUM COARSE FINE COARSE
SIEVE 40mm 25mm 20mm 10mm 4.75mm 2.36mm 1.18mm 600m 300m 150m 75m
Certificate For Similar Road Traffic Survey
As the proposed road is earthen road there is the traffic on the road is not representative of the future traffic that will us the road once It is constructed .To have a realistic idea of traffic ,traffic summary on a road similar is in construction as the proposed road was undertaken and the traffic summary details for the similar road is enclosed .
PROPOSED ROAD – NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
CHAPTER 5. TRAFFIC SURVEY
Road Name: NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
In the present scenario of new connectivity/upgradation road, 3 day, 24 hr traffic volume count has been conducted on the already completed or similar type of PMGSY road in the vicinity of the project road. The Classified Volume Count survey has been carried out in accordance with the requirements of the TOR and relevant codes (IRC: SP: 19-2001, IRC: SP: 20, IRC: SP: 72-2015).The surveys have been carried out by trained enumerators manually under the monitoring of Engineering Supervisor.
5.2 Traffic Data and Analysis
The traffic count done was classified into different vehicle category as given below:
Motorized vehicle comprising of light commercial vehicle, medium commercial vehicle, heavy commercial vehicle, trucks, buses, agricultural tractors with trailers, car, jeep, two wheelers etc.
Non- motorized vehicles comprising of cycle, rickshaw, cycle van, animal drawn vehicle etc.
The number of laden and un-laden commercial vehicles was recorded during the traffic counts. Traffic volume count for this project road was done during Harvesting season. It is assumed that peak harvesting season traffic is double of non harvesting season.
Average of 3 day traffic data is presented in Table 5.1. (adjacent road at which traffic survey carried out,
Sl. No. Type of Vehicle Day-1 Day-2 Day-3 Av. Traffic after two year @ 6% Growth PCU CONVERSION FACTOR P.C.U.
15/Mar 16/Mar 17/Mar Main!A1
1 Car, Jeep, Van,three wheeler 246 293 190 243 273 1.00 273
2 Auto Rickshaw 0 0 0 0 0 0.75 0
2 Scooters/Motorbikes 305 267 242 271 305 0.50 153 0.06
5 Tractors with trailer 32 32 35 33 37 4.50 167
6 Tractor without trailer 0 0 0 0 0 3.00 0
8 Cycle Rickshaw / Hand Cart 0 0 0 0 0 4.00 0
9 Horse cart / Bullock Cart 156 208 183 182 205 8.00 1640
Total commercial vehicle per day (cvpd) 54 PCU 2435 BELOW 3000
Total motorised vehicle per day 568
Total non-motorised vehicle per day 741
5.3 Traffic Growth Rate and forecast
Table 5.2 Average Annual Daily Traffic at Start Point (both ways)
Sl. No. TYPE OF VEHICLE ADT AADT GROWTH RATE Sl. No. Type of Vehicle ADT AADT Growth Rate
1 Car, Jeep, Van,three wheeler 1 Car, Jeep, Van,three wheeler 273 226.8767123 6%
2 Auto Rickshaw 2 Auto Rickshaw 0 0 6%
3 Scooters/Motorbikes 3 Scooters/Motorbikes 259 322.8630137 6%
4 Bus / Minibus 4 Bus / Minibus 0 0 6%
5 Trucks 5 Trucks 22 27.42465753 6%
6 Tractors with trailer 6 Tractors with trailer 32 39.89041096 6%
7 Tractor without trailer 7 Tractor without trailer 0 0 6%
8 Cycles 8 Cycles 262 326.6027397 6%
9 Cycle Rickshaw / Hand Cart 9 Cycle Rickshaw / Hand Cart 0 0 6%
10 Horse cart / Bullock Cart 10 Horse cart / Bullock Cart 46 57.34246575 6%
11 Pedestrian 11 Pedestrian 279 347.7945205 6%
Total commercial vehicle per day (cvpd) Total commercial vehicle per day (cvpd) 48.33333333
Total motorised vehicle per day Total motorised vehicle per day 440.6666667
Total non-motorised vehicle per day Total non-motorised vehicle per day 522.3333333
This Road is adjacent to ………………………………………………………………. And start which is already constructed and severing from PMGSY I .This road found traffic of T 4 found traffic survey conducted in this road because this road ……………………. Traffic will divert to this road after construction of this road.
Independent traffic survey details shall be attached where the projected traffic is more than 1 MSA duly certified by the STA. Further, Axial load survey must be carried out on such proposed roads which are to be designed for projected traffic more than 2 MSA and carriageway width of 5.5 m. The geo-tagged photographs and videography for the peak hour traffic should be attached with the DPR to justify the traffic plying on the proposed road.
{Tick the relevant box}
a) Traffic volume and mix do not vary along the road
b) Traffic volume and mix vary along the road
c) Traffic volume and mix will vary along the road in the future
d) There is a potential for through traffic using the road
e) % of loaded vehicles
5 PROJECTED ANNUAL AVERAGE DAILY TRAFFIC AADT( FOR 2 YEAR PERIOD) 0
6 PROPORTION FACTOR #DIV/0!
7 PROJECTED TRAFFIC
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
8 VEHICLE DAMAGE FACTOR VDF
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
9 TOTAL ESAL ( EQUIVALENT STANDARD AXLE LOAD)PER DAY #DIV/0!
10 CUMULATIVE ESAL OVER 10 YEARS @ 6% GROWTH RATE #DIV/0! #DIV/0!
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA
3 day, 24 Hr Traffic volume count Sheet
Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA FROM 15-Mar-25
Location 100 Mt. Block BASTAR District BASTAR TO 17-Mar-25
Time HCV -Truck (Laden) HCV - Truck (Unladen) HCV - Truck (Overloaded) HCV - Bus (Laden) HCV - Bus (Unladen) HCV - Bus (Overloaded) MCV -Agricultural Tractor-trailor (Laden)
Day Day 1 Day 2 Day 3 Day 1 Day 2 Day 3 Day 1 Day 2 Day 3 Day 1 Day 2 Day 3 Day 1 Day 2 Day 3 Day 1 Day 2 Day 3 Day 1 Day 2 Day 3
Time MCV -Agricultural Tractor-trailor (Unladen) MCV -Agricultural Tractor-trailor (Overloaded) LCV - Cars/ Vans/ Jeeps/Three Wheelers (Laded, Unladen & Overloaded) Two Wheelers Cycles Animal Drawn Cart Pedestrian 1.70
Day Day 1 Day 2 Day 3 Day 1 Day 2 Day 3 Day 1 Day 2 Day 3 Day 1 Day 2 Day 3 Day 1 Day 2 Day 3 Day 1 Day 2 Day 3 Day 1 Day 2 Day 3
PRADHAN MANTRI GRAM SADAK YOJANA
DESIGN OF FLEXIBLE PAVEMENT
As per IRC: SP:72-2015
Road Name: NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block: BASTAR Distcict: BASTAR
Average Daily Traffic in non Harvesting Season
HCV -Truck (Lodad) 10 MCV -Agricultural Tractor-trailor (Unlodad)) 20
HCV -Truck (Unlodad) 11 MCV -Agricultural Tractor-trailor (Overloded) 0
HCV -Truck (Overloded) 0 LCV - Cars/ Vans/ Jeeps/Three Wheelers 243
hcv - Bus (Lodad)) 0 Two Wheelers 271
hcv - Bus (Unlodad) 0 Cycles 233
hcv - Bus (Overloded) 0 Animal Drawn Cart 182
MCV -Agricultural Tractor-trailor (Lodad) 13 Pedestrian 325
Total Traffic: 983 Duration of Harvesting Season in Days ( From Local Enquiry) t = 75
Total Motorized: 568 Average Traffic During Non Harvesting Season (Considered half of the total Traffic in peak Season ) T= 983
Total Non Motorized: 415 Average Increase in Traffic During Harvesting Season nT= 983
Pedestrian : 325 Avg. Annual Daily Traffic AADT = T+((1.2 x nT x t)/365) AADT= 1225
It is presumed that road will open for traffic after 2 yrs. - -
therefore ADT after 2 yrs by considering 6.0% growth rate ADT = AADT x (1+0.06)n ADT 1377
PROPORTION FACTOR 1.40
For Pavement Design consider the Propotionate value of HCV, MCV & SWC out of ADT
Sr. No. Vehicle Type VDF Value ESAL Per Day (T0) ESAL = (vdf x No.) Cumulative ESAL N = T0 x 365 x L x [ ((1+ 0.06)n - 1)/0.06] N = T0 x 4811 x L
2 HCV -Truck (Unlodad) 12 0.31 3.831476 18433
3 HCV -Truck (Overloded) 0 2.86 0 0
4 hcv - Bus (Lodad)) 0 2.58 0 0
5 hcv - Bus (Unlodad) 0 0.31 0 0
6 hcv - Bus (Overloded) 0 2.86 0 0
7 MCV -Agricultural Tractor-trailor (Lodad) 15 0.31 4.528108 21785
8 MCV -Agricultural Tractor-trailor (Unlodad)) 22 0.02 0.44944 2162
9 MCV -Agricultural Tractor-trailor (Overloded) 0 0.344 0 0
TOTAL ESAL 181846
Hence Adopted T-4 Traffic Category .
Desing CBR = 5-6%
Design Pavement thickness as per Fig 4 of IRC-SP - 72 - 2015
Design Pavement thickness = 320mm
Open-Graded Premix Carpet 20 mm
G.S.B. : 150 mm
Thickness Modified Soil : 0 mm
Total Crust Thickness : 320 mm
Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
Provide 20 mm Thick Premix carpet with seal Coat Type "B" as wearing course
Case 1 Only wheel load stress : Case 2 Temperature and wheel load stresses without fatigue: Case 3 fatigue analysis considering load and temperature
Case 1 /2/3 (without temperature-1/ with temperature 2/with temparature and fatigue analysis-3) 1 1 Transverse joint spacing,m 4.00
Temperature Zone (1 to 6) 3 Spacing of wheels Sd (mm) 310 Ratio of L/l NO NEED TO CALC TEMP STRESS
Modulus of the subgrade reaction, k Mpa/m 42 wheel load, P kN 50 Co-efficient of thermal expansion 0.00001
Elastic modulus of concrete E, Mpa 30000 Tyre pressure, q MPa 0.80 Correction factor C
0.15 Radius of contact, a (mm) 141.05 Design life of pavement, yrs 20
19.00 Trial thickness, h m 0.20 Rate of increase of traffic 0.06
Modulus of rupture of concrete, fcr 4.22 No. of commercial vehicels per day 0 Truck with 50kN Wheel load,% 10
RESULTS FOR ONLY WHEEL LOAD CONSIDERATION RESULTS FOR WHEEL LOAD AND TEMPARATURE STRESS
Radius of relative stiffness, l m 835.44 temparature stress at edge, Mpa Pavement Composition For Case -1 Below CC Pavement in mm
3.1805 Wheel load Stresses at edge, Mpa
Design is Safe Total stresses, σ, Mpa GSB 150
Design is WBM-3 0
Pavement Composition For Case -2 Below CC Pavement in mm RESULTS FOR FATIGUE ANALYSIS
GSB 100 Design No.of vehicles for fatigue analysis 0.00
WBM 75 Stresses due to wheel load,σ, Mpa
Correction factor C
stresses due to temparature,σ, Mpa
negative stress due to nonlinear temparature diffrential,σ, Mpa
Total stress for Fatigue calculation,σ, Mpa
Allowable repetititons
Cummulative fatigue damage
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
CHAPTER 6. HYDROLOGICAL SURVEY
Hydrological survey is necessary for design of adequate and safe Cross Drainage Structures so that the rain water can pass as per natural slope. Hydrological survey of the proposed road is based on the following observations:
Hydrological survey is necessary for idesign of adequate and safe Cross Drainage Structures so that the rain water can pass as per natural slope. The hydrological and hydraulic studies are to be conducted in accordance with IRC: SP: 13-2004 and IRC: 5-2015. Hydrological survey of the proposed road is based on the following observations:
Catchments Area
Time of Concentration
Existing Cross Drainage Structures
Drainage of road refers to the satisfactory disposal of surplus water within the road limits. The water involved may be precipitation falling on the road, surface runoff form the adjacent land, seepage water moving through sub-terrain channels, or moisture rising by capillary action. Adequate information about drainage patterns is necessary to devise an effective drainage system, which brings into focus the need for requisite studies and investigations
Drainage studies have the following principal objectives
Fixing the grade line of the road
Design of pavement and
Design of the surface/sub-surface drainage system
• Main components of drainage investigation are determination of HFL and ponded water level, depth of water table, range of tidal levels and amount of surface runoff. Besides this, for cut sections in rolling and hilly areas, it would be necessary to carry out special investigations for sub-terrain flows and seepage of irrigation water from fields situated above the road.
• Extent of studies and the data to be collected will depend on the type and scope of the project. Usually good deal of information could be collected through site inspection, simple measurements and local enquiry. Most appropriate time for such enquiries is during the stage of preliminarysurvey so that the information gathered can be of use in fixing the alignment and finalizing the broad strategy for improving the drainage. Detailed investigations could continue till the final location survey when any adjustment in the light of further data could still be made before the projects in finally ready. In the case of cut sections, investigations for seepage and sub-terrain flows may generally have to be done again at the stage of formation cut when new features may come to light warranting modifications in design or the need for special measures.
6.2 Rainfall Data
Rainfall Data as applicable for the project road were collected with maximum Rainfall occurring in the months of July/ August.
6.3 Catchment Area
The Catchments area is to be calculated by gathering local information and topographical survey data.
6.4 Time of Concentration
Time of concentration (tc) in hours is calculated from the formula of (0.87 x L3/H)0.385, where L is distance from the critical point to the structure site in km and H is the difference in elevation between the critical point and the structure site in meters.
6.5 Existing Cross Drainage Structures
There are 15 number of cross drainage structures along the existing project road as listed below:
Table-6.1 List and condition of existing culverts
Sl. Chainage (km) Description of Existing Structure
Type & Span/ Dia. (m) Condition
1 225 2R X 1000MM DIA H.P.C GOOD CONDITION
2 480 BRIDGE 470 TO 510M. GOOD CONDITION
3 920 1.50 m Span Slab Culvert DAMAGE CONDITION CD
4 1615 1.50 m Span Slab Culvert GOOD CONDITION
5 2015 1.50 m Span Slab Culvert GOOD CONDITION
6 2250 1.50 m Span Slab Culvert GOOD CONDITION
7 2400 1.50 m Span Slab Culvert GOOD CONDITION
8 2890 1.50 m Span Slab Culvert GOOD CONDITION
9 3110 1.50 m Span Slab Culvert GOOD CONDITION
10 3475 1.50 m Span Slab Culvert GOOD CONDITION
11 3712 6.0 m Span Slab Culvert GOOD CONDITION
12 4476 3.0 m Span Slab Culvert GOOD CONDITION
13 4575 1.50 m Span Slab Culvert GOOD CONDITION
14 4685 1.50 m Span Slab Culvert GOOD CONDITION
15 5455 1.50 m Span Slab Culvert DAMAGE CONDITION
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
CHAPTER 7. ADOPTED GEOMETRIC DESIGN STANDARDS
The geometric design standards for this project conform to PMGSY guidelines and the guidelines as stated in IRC-SP 20:2002. Recommended design standards vis-à-vis the standards followed for this road are described below. {Consultants shall review these guidelines with respect to the Expert Committee recommendations to review Standards, Specifications and Design of Rural Roads issued vide letter no. Lr.#P-17035/1/2007-Tech dated 13th October, 2010 shall be followed. Copy of circular available under circular head of www.pmgsy.nic.in.)
The classification of terrain is selected from plain/rolling/hilly/steep classification for which following criteria will be applicable.
Terrain classification Cross slope of the country
Plain 0-10% More than 1 in 10
Rolling 10-25% 1 in 10 to 1 in 4
Mountainous 25-60% 1 in 4 to 1 in 1.67
Steep Greater than 60% Less than 1 in 1.67
7.3 Design Speed
The proposed design speed along this project road will be selected from the following table:
Road classification Plain terrain Rolling terrain Mountainous terrain Steep terrain
Ruling Min. Ruling Min. Ruling Min. Ruling Min.
Rural Roads (ODR) 65 50 50 40 30 25 25 20
Rural Roads (VR) 50 40 40 35 25 20 25 20
7.4 Right of Way (ROW)
The requirement of ROW for this road is as follows (as specified in IRC-SP 20:2002):
Road classification Plain and Rolling Terrain Mountainous and Steep Terrain
Open Area Built-up Area Open Area Built-up AreaBuilt-up Area
Normal Range Normal Range Normal Exceptional Normal Exceptional
Rural roads (ODR and VR), (m) 15 15-25 15 15-20 12 12 12 9
7.5 Roadway Width
As the road is link road way width is reduced to 9.0m
Carriageway (m) Roadway Width (m)
Plain and Rolling Mountainous and Steep
Desired Minimum
7.6 Carriageway Width
The width of carriageway for this project road is 3.75m.
It is proposed to have 1.875 m wide shoulder in open area and in builtup area as per space available.
It is proposed to have 1.875 m wide shoulder as the case may be on both sides of which at least 1.00 m is hard shoulder with well compacted unscreened gravel.
Shoulder width will be one half of the difference between the roadway width and carriageway width. The earthen/hard shoulder can be proposed as per the site requirements.
7.8 Roadway width at cross-drainage structures
The roadway width at culvert locations for this road is 7.50 m in plain terrain.
7.9 Sight Distance
The safe stopping sight distance is applicable in the geometric design. The sight distance values for this road as per IRC recommendations are presented below:
Design Speed (km/hr) Safe Stopping Sight Distance (m)
In built-up area, in sharp curves necessary signages will be provided.
7.10 Radius of Horizontal Curve
According to IRC recommendations/standards, the minimum radius of horizontal curve for this project road is given below:
Terrain Category Radius of Horizontal Curve (m)
Ruling Minimum Absolute Minimum
Mountainous 30 20
To minimize extra land arrangement, minimum radius used is 20 m and design speed in these curves are also restricted to 20 km/hr.
7.11 Camber & Super elevation
A camber to be adopted on this road section is given below. The maximum super elevation is 5.0% for this project road.
Surface type Camber (%)
Low rainfall (Annual rainfall <1000mm) High rainfall (Annual rainfall >1000mm)
Earth road 4.0 (1 in 25) 5.0 (1 in 20)
WBM Gravel Road 3.5 (1 in 28.5) 4.0 (1 in 25)
Thin bituminous Road 3.0 (1 in 33.33) 3.5 (1 in 28.57)
Rigid Pavement 2.0 (in in 50) 2.5 (1 in 40)
7.12 Vertical Alignment
The present road is in plain/hilly terrain and vertical alignment has been designed well within ruling gradient. (Longitudinal gradients should be as per the Expert Committee recommendations to review Standards, Specifications and Design of Rural Roads issued vide letter no. Lr.#P-17035/1/2007-Tech dated 13th October, 2010 shall be followed. Copy of circular available under circular head of www.pmgsy.nic.in.)
Generally, minimum gradient of 0.3% for drainage purpose is considered for designing the vertical alignment of this road.
7.13 Vertical Curves
For satisfactory appearance, the minimum length of vertical curve for different design speed is given in IRC-SP 20:2002 and Expert committee recommendations of PMGSY roads to be referred. Vertical curves are to be designed to provide the visibility at least corresponding to the safe stopping sight distance. Valley curves to be designed for headlight sight distance.
7.14 Side slope
Side slope for this rural road embankment height is less than 1.05m from gruound level. is given in the table below.
Condition Slope (H:V)
Embankment in silty/sandy/gravel soil 2:1,
Embankment in clay or clayey silt or inundated condition 2.5:1 to 3:1
Cutting in silty/sandy/gravelly soil 1:1 to 0.5:1
Radius of Curve (m) Upto 20 21 - 60 Above 60
Cutting in disintegrated rock or conglomerate 0.5:1 to 0.25:1
Cutting in soft rock like shale 0.25:1 to 0.125:1
Cutting in medium rock like sandstone, phyllite 0.083:1 to 0.0625:1
Cutting in hard rock like quartzite, granite Near vertical
7.15 Extra Widening of Pavement
The Extra Widening of Pavement at Curve as is given below:
Radius of Curve (m) Upto 20 21 - 60 61 - 100 101 - 300 Above 300
Extra Widening for 3.75 m wide single lane carriageway (m) 0.9 0.6 Nil Nil Nil
Extra Widening for 5.5 m wide intermediate lane carriageway (m) 1.25 1.0 0.8 0.5 Nil
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
CHAPTER 8. ALIGNMENT DESIGN
The basic aim of highway design is to identify technically sound, environment-friendly and economically feasible highway alignment. The most appropriate alignment is to be proposed considering the effect of climate change and past history of natural disasters in the area. The selection of the alignment is to be made after economic, social and environmental analysis, the details of the same is presented in succeeding chapters. The ensuing sections deals with obligatory points, which control highway alignment, design of cross-section, highway geometric design & methodology, design of miscellaneous items.
The main components included in the highway design are:
Cross-sectional elements
Horizontal alignment
Vertical profile
Junctions and/or Interchanges
Miscellaneous items
i. The road alignment is to be planned considering following aspects:
ii. Finalization of road alignment, their design and construction methodology based upon the recommendations of the geologist, geotechnical engineer, hydrologist, soil conservation experts contained in their reports
iii. Alignment of the road on sun facing side of the hill
iv. Efforts to avoid series of hair-pin bends on steep slopes
v. Staggering the location of the hair-pin bends so that they are not aligned one above the other
vi. Ensuring safe horizontal and vertical distance from river banks and the water level
vii. Avoidance of hill cutting in the form of huge vertical cuts and adoption of benching for mitigating slope instability
viii. Adoption of the balance and cut and fill methodology where possible
ix. Study of the roads already constructed in the immediate vicinity to better understand the behaviour of the hill slopes along the roads
x. Excavation of bore holes at major change in pavement condition or in deflection readings (for up-gradation works), or at 2 km intervals, whichever is lesser
xi. Excavation as required where major changes in soil condition or change in strata is observed
xii. Testing of samples from the bore holes to determine suitability of various materials for use in widening of existing embankments or in new pavement structure
xiii. In case of hill roads, identification of the dumping sites in the DPR so as to use them for developing parks, playground, parking area etc.
xiv. Consultation with the local public on the hazards occurring in the area in the past
xv. Study of possible alternate alignments
8.2 Horizontal alignment
Table 8.1 – Features of Horizontal Alignment
Chainage Length Description Reason for deviation from existing alignment, if necessary
From (km) To (km) (km)
0 5.500 5.50 N.A No existing alignment deviated
a) Centre line of the existing and proposed horizontal alignment coincide
b) Centre line of the existing and proposed horizontal alignment deviate at certain sections
Chainage LHS Existing alignment RHS Chainage shift Approx land required (m)
No existing alignment shift
Figure 8.1 Schematic diagram showing location and offsets from existing alignment
Table 8.2 – Horizontal Curve details
Horizontal curve details show in voll-II
Curve No. IP Chainage Radius Ls Speed S.E. Def Angle Curve Length total Curve Length total
(m) (m) (Kmph) (m) (m)
8.3 Vertical alignment 249.94
Table 8.3 – Vertical Curve Details (Example)
Sl. NO. Chainage (m) Level of pvi Length of curve Type of curve Grade in (%) Grade out (%) Grade difference (%) Chainage Level
St. of Curve End of Curve St. of Curve End of Curve
2 no vertical curve required
8.4 Design of Junctions
The proposed alignment intersects cross roads and forms junctions. The locations of junctions are given below:
Table 8.4 – List intersections, type and proposed modifications
Sl. Type of intersection Location (km) Exiting condition Proposed modification
1 Tee-junction 0.00 EARTHEN ROAD Bell mouth joint provide 0 3
2 Tee-junction 0.00 EARTHEN ROAD Bell mouth joint provide 840
3 Tee-junction 5500.00 EARTHEN ROAD Bell mouth joint provide
5 Tee-junction EARTHEN ROAD Bell mouth joint provide
6 Tee-junction EARTHEN ROAD Bell mouth joint provide
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
CURVE DESIGN TABLE
Curve CH. of the Radius of Dev. L Ts H.I.P. V Ls(I) Ls(II) Ls Max 0s C Lc S Ts Es e BC EC Total Length of Curve (M.)
No. start point. Curve Angle (M) (M) (M) Km/ph (M) (M) (M) (Deg) (Deg) (M) (M) (M) (M) IN % (M) (M)
of curve in (Metre) (Deg)
TOTAL LENGTH OF CURVE 249.94
SUMIF(C9:C33,"<60",U9:U33)
CHAPTER 9. PAVEMENT DESIGN
Considering the sub grade strength, projected traffic and the design life, the pavement design for low volume PMGSY roads is to be carried out as per guidelines of IRC: SP: 72 – 2015, IRC SP:77-2008 “Design of Gravel Road”, IRC SP:62-2014 “Cement Concrete roads” and IRC:37-2018 “Guidelines for Design of Flexible Pavement for roads having higher category of traffic. In built up area for hygienic and safety reasons, C.C. pavement to be provided with a hard shoulder and drain appropriate line drain. Drainage plan needs to be attached with the DPR.
i. Pavement roughness measurement using bump integrator (or alternative calibrated instrument) and measurement of rutting, cracking and ravelling
ii. Measurement of road deflections utilizing the Benkleman Beam Deflection Test
iii. CBR tests at sufficient intervals to indicate extent and severity of the problem when pavements are too distressed to give meaningful deflection results
iv. Survey for assessment of the surface, sub-surface and roadside drainage condition of the road section
v. Detailed subsurface investigations for all the road sections where there has been subgrade failure
vi. Overlay thickness clause2.2.3 of IRC SP72:2015 should be referred.
9.2 Pavement Design Approach
9.2.1 Design Life
A design life of 10 years is to be considered for the purpose of pavement design of flexible and granular pavements.
9.2.2 Design Traffic
The average annual daily traffic (AADT) for the opening year as well as the total commercial vehicle per day (CVPD) is to be presented in Table 5.2.
9.2.3 Determination of ESAL applications
Only commercial vehicles with a gross laden weight of 3 tonnes or more are considered. The design traffic was considered in terms of cumulative number of standard axles to be carried during the design life of the road. The numbers of commercial vehicles of different axle loads are converted to number of standard axle repetitions by a multiplier called the Vehicle Damage Factor (VDF). An indicative VDF value was considered as the traffic volume of rural road does not warrant axle load survey.
For calculating the VDF, the following categories of vehicles was considered as suggested in paragraph 3.4.4 of IRC: SP 72-2015.
Vehicle type Laden Un-laden /Partially laden
Indicative VDF values considered 10% of laden MCV and 10% laden HCV as overloaded & given below:
Lane distribution factor (L) for Single lane road = 1.0 Cumulative ESAL application = To x 4811 x L, where To = ESAL application per day. The Cumulative ESAL application for the project road as per paragraph 3.5 of IRC: SP: 72 – 2015 is presented in Annexure
9.2.4 Subgrade CBR
The subgrade CBR range of 5% to 6% was considered and the traffic falls in the T-4 category.
9.3 Design Alternatives
Design alternatives considered
Chainage Design alternatives considered
Pavement Shoulder Soil stabilization and use of locally available marginal materials. Specify design alternative selected Justification
Flexible Rigid Earthen full width Hard Full width
RD-0-300,700-4700,-,-M Yes NO Yes Yes NEW PROPOSED BT
RD-1100-1300,-,-,-M NO Yes NO Yes EX CC 3.00Mt WIDTH
RD--,-,-,-M NO Yes NO Yes EX CC 3.75Mt WIDTH
RD--,-,-,-M NO Yes NO Yes EX CC GOOD CONDITION
RD-300-700,4700-5500,-,-M NO Yes NO Yes NEW PROPOSED CC
9.4 Pavement composition
i. Flexible Pavement
The designed pavement thickness and composition is to be calculated by refering Figure 4 (Pavement design catalouge) of IRC: SP- 2015. The ratio between heavy commercial vehicles and medium commercial vehicles as given in Chapter 5 should be maintained as far as possible.
ii. The pavement layers provided are given below:
Table 5.2 Average Annual Daily Traffic at Road
S. No. HCV MCV LCV Car/Jeep Mcycles Carts
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1 Total Motorised Vehicle
2 Total Non Motorised Vehicle
5 Projected Annual Average Daily Traffic AADT( For 2 Year Period)
6 Proportion Factor
7 Projected Traffic
#REF! #REF! #REF! #REF!
8 Vehicle Damage Factor VDF
#REF! #REF! #REF! #REF! #REF!
9 Total ESAL ( Equivalent Standard Axle Load )Per Day
10 Cumulative ESAL Over 10 Years @ 6% Growth Rate
Layers Items Thickness for pavement Thickness of Pavement in Widening portion
Top Layer/Surface course Premix Carpet with Seal Coat/ SDBC/BC /Surface dressing 20mm
Bituminous layer BM/DBM/BC -
Base Layer WMM 150 mm
Grading II /WBM 0.495
Sub – Base Layer Granular Sub-base 150 mm
Total thickness 320mm
Top layer of WBM is to be treated with bituminous surface.
Evaluation of Subgrade Strength
i) Design CBR = 5.4%
PAVEMENT THICKNESS AND COMPOSITION Quality of Subgrade Class Range (CBR%)
T1 : 10,000 to 30000 ESAL applications
T2 : 30,000 to 60,000 ESAL applications Very Poor S1 2%
T3: 60,000 to 1,00,000 ESAL applications Poor S2 3% - 4%
T4: 1,00,000 to 2,00,000 ESAL applications Fair S3 5% - 6%
T5: 2,00,000 to 3,00,000 ESAL applications Good S4 7% - 9%
T6: 3,00,000 to 6,00,000 ESAL applications Very Good S5 10% - 15%
T9: 15,00,000 to 20,00,000 ESAL applications
For commulative ESAL applications of 181846 reffering to to the Traffic category in the
range 2,00,000 to 3,00,000 and the subgrade category of CBR 5% to 6 %, Fig 4, IRC:SP:72-2015
Sub Grade )= 0 mm
GSB (CBR not less than 20, in exceptional cases may be relaxed to 15= 150 mm
Bituminous surface treated WBM/CRMB 150 mm
Base of Gravel/CRMB/WBM (CBR not less than 100) 0 mm
Total Crust = 300 mm
FLEXIBLE PAVEMENT
Chainage Length (in M) Design CBR GSB (in mm) WBM (in mm) WBM (in mm) PMC REMARK
Chainage Length (in M) Remark GSB (in mm) Width CC M-30 Grade (in mm)
iii. Rigid Pavement Design Pavement thickness as per Clause no. 1502 Page no.398 MORD Specipication
Top Layer/Surface course PANAL CONCRETE 100mm
Base Layer DLC/WMM/WBM 75mm
Sub – Base Layer Granular Sub-base 150mm
Total thickness 325mm
CC pavement design as per IRC:SP:62-2004
9.5 Embankment Design
As there is no high embankement in proposed road , hence Need not required to design embankement
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
CHAPTER 10. DESIGN OF CROSS DRAINAGE WORKS
10.2 Hydrological Design
Agricultural conduits, which basically act as balancers, have also been provided as listed below in Table 10.2. The existing structures in poor condition that are proposed for replacement as listed below. Agricultural conduits, which basically act as balancers, have also been provided as listed below.
Sr. No. Chainage (m) Span (m) C.A. (Ha) Q= CM¾ where C=14 M = CA in Sq Km As per Article 7.6.1 of IRC SP -20 WaterWay Area Required = CA (Ha)/10.9 Width of Opening Provided Height of OpeningProvided Waterway area Provided (Sqm) Bed Level RTL Foundation Level
10.3 Design Feature
Design Standards for culverts is to be been prepared based on standard codes and guidelines of IRC: SP: 20: 2002 and similar type of ongoing projects. General features of the designed cross drainage structures are given below:
1 For hume pipe culvert, minimum road width has been taken as 7.50m,
Width of culvert : 7.50 m with parapet.
Width of Bridge: 5.5 m with parapet
10.4 Justification for retaining/widening and replacement of culverts
There are four no eisting culvrt and four no. of field crossing along theproject road are present as follows
10.5 Hydraulic calculation for Culvert
i. The design discharge is to be calculated by the rational method considering peak runoff from catchment using the formula,
Q = 0.028 x P x A x Ic
Where P = Coefficient of Run Off for the catchments characteristics, A = Catchments Area in Hectares & Ic = Rainfall Intensity
ii. Small bridge-site length of which exceeds 15 m to be jointly visited by STA and S.E. Design – as per IRC: SP: 20-2002 & IRC: SP:13-2004 and relevant IRC Codes for Bridges.
iii. Causeways and submersible bridges – Design to be done as per IRC: SP: 20-2002 and SP-82:2008.
Detailed hydraulic calculation of all replaced and proposed new culverts and attached as Annexure-2 of this report.
List of c/d works proposed/upgraded, type, location, span/dia in a tabular form. This should connect to the decisions taken during transect walk.
TABLE 10.2 PROPOSED CULVERTS
Sl. NO CHAINAGE TYPE OF CULVERT REMARK
1 5 1R X 1000mm Dia H.P.C REPLACEMENT CD
2 215 1R X 1000mm Dia H.P.C REPLACEMENT Abs. CD'!A1
3 1700 1R X 1000mm Dia H.P.C NEW PROPOSED
4 2200 1R X 1000mm Dia H.P.C NEW PROPOSED
5 2680 1R X 1000mm Dia H.P.C NEW PROPOSED
6 2760 1R X 1000mm Dia H.P.C REPLACEMENT
7 2850 1R X 1000mm Dia H.P.C REPLACEMENT
8 3100 1R X 1000mm Dia H.P.C REPLACEMENT
9 3720 1.50 m Span Slab Culvert REPLACEMENT
10 3950 1R X 1000mm Dia H.P.C REPLACEMENT
11 5060 1R X 1000mm Dia H.P.C NEW PROPOSED
12 5460 5R X 1000mm Dia H.P.C NEW PROPOSED
13 5910 1.50 m Span Slab Culvert NEW PROPOSED
Assistant Engineer PIU,CGRRDA, MANENDRAGARH
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
CHAPTER 11. PROTECTIVE WORKS & DRAINAGE
11 Protective Works & Drainage
11.1 General- Explore the new technologies for protection work to reduce the cost of protection work e.g. Gabian structure, use of Geosynthetic material, turffing etc.
11.2 Road side drain
As the insufficient drainage of surface water leads to rapid damage of road, road side drain as shown in drawing volume is to be provided particularly on the location of habitation areas. Sketch for a standard roadside drain should be made available.
Table 11.1 List of Drain works
Sl. No. Chainage Type of protective works Comments
0.15 Section Toe Wall
Drain 0.6 X 0.6 0.2
11.3 Protective Works
Table 11.1 List of protective works
Sl. No. Length Chainage Type of protective works Comments Main
1 440 #NAME? CC Drain
2 0 #NAME? CC Drain Both Side
3 0 #NAME? Stone Pitching & Toe Wall
4 570 #NAME? Stone Pitching & Toe Wall Both Side
5 0 #NAME? Retaining Wall
6 0 #NAME? Retaining Wall Both Side
7 0 #NAME? Breast Wall
8 0 #NAME? Breast Wall Both Side
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
Chapter 11. Protective Works & Drainage
Typical Cross Section of C.C. Drain
Table 11.1 List of protective works
P.C.C. DRAIN RD & SIDE.
Sl. No. Chainage Length Side (Single / Both ) Total Length Side ( Left / Right ) #REF!
1 0 0 0 2 0 BOTH SIDE
5 0 0 0 1 0 ONE SIDE
Total Length of P.C.C. DRAIN 770
TOE WALL & RETAINING WALL RD & SIDE.
Sl. No. Chainage Length Side (Single / Both ) Total Length Side ( Left / Right ) #REF!
5 0 0 0 2 0 R/W ONE SIDE
6 0 0 0 1 0 R/W BOTH SIDE
Total Length of Toe Wall & Retaining Wall 340
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
CHAPTER 12. LAND REQUIREMENT
The existing road is generally an WBM road in poor condition, rest is earthen road in some strech. Thus the project road is a new connectivity road. The existing Right of Way (ROW) is varying from 6.0 m to 8.0m.
12.2 Proposed ROW
The width of carriageway is to be considered as 3.75 m / 5.5 m in accordance with the IRC-SP 20: 2002. The total roadway width is limited to 7.5 m/9 m. The proposed ROW generally varies from 12 m – 15 m depending upon the embankment height and the proposed ROW is even less than 10 m in some stretches of habitation area and in areas having tree plantation.
12.3 Additional Land
Local administration and local panchayat need to apprise the villagers about requirement of minor areas in places for development of the road. Villagers are generally highly enthusiastic during site visits for selection of the road. Table 12.1 provides the chainage-wise additional land required.
Table 12.1 Additional Land Required
Sl. No. Chainage Width of Land Required in m Comments
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
CHAPTER 13. UTILITY SHIFTING / RELOCATION
13.1 Existing utilities
There is no existing utilities that require relocation along the project road. That were connect to the decisions taken during transect walk.
13.2 List of departments responsible for utility shifting-
a) Electric pole :- C.S.E.B.
b) Hand pump :- P.H.E.
13.4 An estimate for relocation of utilities is given below in Table 13.1
{Provide an estimate with breakdown of costs for relocation of utilities}
Table 13.1 Estimated Cost for Relocation of Utilities
Sl. No. Utility Type Qty Estimated Rate Estimated Cost
1 Electricpole 0 25000 0
2 Transformer 0 250000 0
3 Handpump 0 100000 0
Estimated Total Cost 0.00
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
ROAD SAFETY MEASURES AND TRAFFIC MANAGEMENT
C-14 Safety Guidelines for Planning (Section 2 of DPR) and Design of Alignment (Section 8 of DPR)
Road safety starts from planning stage itself. A road hierarchy system of network planning has been one of the important tools used for road network and land use planning. Basic approach is for defining each roadway in terms of its main functions (of accessibility and mobility) and appropriate design criteria. Rural road comprise other District Roads and Village Roads for which geometric design standards are given in IRC Codes. These roads basically serve the accessibility function. Normally a rural road should not join or intersect a national highway or even a state highway. It should join a major district road for better network efficiency and more importantly for better safety.
Following points should be kept into consideration for safe design of alignment and profile:
(i) Road should be designed with characteristics of self-explaining, consistent, ‘forgiving’, and for safe use of all categories of users, and with consideration of human factors.
(ii) Ruling standards of geometric design be adopted, with largest practical radius and sight distance.
(iii) Sharp bends/ 90° turn should be avoided and improved if present on existing roads or tracks. These are hazardous locations and need to be eliminated even if, it requires acquisition of land. The requirement and locations be identified during transect walk and field surveys. The state should make provisions for the acquisition of land at critical locations. In cases where it is not feasible/ impossible then speed management measures should be planned and provided.
(iv) Visibility is an important requirement for safety on roads especially in hills. Therefore it is necessary that prescribed sight distance (related to speed) is available to permit drivers enough time and distance to control their vehicles and avoid accidents. In order to ensure prescribed sight distance, it may be necessary to have additional right of way. Additional land may also be acquired at locations of deep cut, high fills and unstable or landslide prone areas. Where this is not feasible, traffic calming measures as per IRC: 99-2018 need to be planned and provided.
(v) The roads in hilly terrain should avoid hairpin bends or kept to minimum and should be located on stable and flat ground. In unavoidable circumstances, Hair-pin Bends may be designed as Circular Curves with Transitions or as Compound Circular curves as prescribed in Hill Roads Manual. The widening required should be achieved towards hill side.
(vi) Extra widening must be provided at sharp horizontal curves to facilitate safe passage of vehicles. Blind curves and hairpin bends should be made 2-lanes for improving safety.
(vii) Designing vertical profile compatible with natural topography for optimum and balanced cut-fill quantities hence generating less spoil.
(viii) Keeping finished road level and fill slopes higher than the high flood level (HFL). While designing the roads, provision be made for grade compensation at curves, vertical and lateral clearances and co-ordination of horizontal and vertical alignments.
(ix) Besides other drawings, the DPR would necessarily include drawings for :
(a) Horizontal Alignment and Longitudinal Vertical Profile,
(b) Cross-section at required interval along the alignment within ROW, Typical Cross-Sections with details of pavement structure,
(c) Detailed Drawings of intersections layout with traffic signs, pavement markings and speed management measures.
(d) Detailed Working Drawings for individual Culverts and Cross-Drainage Structures.
(e) Detailed Working Drawings for individual Bridges, Tunnels, subways and Structures.
(f) Detailed Drawings showing each traffic sign with its type and location, pavement markings of edge lines and pedestrian crossings at required locations.
(g) Drawing showing location and layout of bus bays, if required and to be provided.
(h) Detailed drawings showing safety measures (traffic signs, markings, delineators or other special treatment) for sharp/ blind curves if part of alignment
14.2 Take off point of rural roads from higher category road needs to be carefully planned with well-designed intersection. Following points be kept into consideration for the selection and design of takeoff point:
(i) Take off should be perpendicular to higher category road. In any case, the angle should not be less than 700
(ii) It should preferably be at flat ground level (zero grade).
(iii) In cases where existing cart tracks meet the higher category roads at some angle (not perpendicular) then intersection layout should be modified to the ‘right angle’ intersection and extra land, if required should be made available (acquired).
(iv) The intersection should be designed as ‘priority’ intersection.
(v) The intersection should have prescribed sight distance for users of the main road as well as for the rural road. Obstructions like tree branches and/or other objects are to be removed.
(vi) Intersections should be designed for safe crossing by vulnerable road users (VRUs). Provision of pavement markings, as per IRC: 35 should be ensured.
(vii) Suggestive layout of Priority Intersections is given in Fig. 14.2, below for guidance. Besides well designed layout, the intersection must be provided with required and correct traffic signs, pavement markings and speed management measures as per relevant IRC codes.
(Note: It would be desirable for NRIDA to prepare a separate document on “Type Design for Intersections on Rural Roads” for design and layout of intersection.)
Fig. 14.2: Suggestive Layout of Priority Intersection
(Insert figures from ADB Manual on Rural Road Safety)
(viii) NRIDA Guidelines recommends provision of speed humps at junction of rural road with higher order roads, near Schools/ Anganwadi Centers / Health Centers and entry points of habitation. Its design should be as prescribed in IRC: 99-2018.
14.3 The other (dead) end of rural road should be taken, a little beyond the habitation so that there is space for turning of vehicles especially buses ambulances and fire tenders. A suggestive layout is shown in Fig.14.3, for guidance, which is based on US practice. It may be suitably modified as per site conditions.
Fig. 14.3: Suggestive Layout for Space for Turning of Vehicles at the End of Rural Road
14.4 In cases, where public transport buses ply on the main road then they may be providing facilities for villagers as well. Therefore provision of bus bays be part of development of rural road. Also if there is possibility or planning for public transport buses to start plying (with the improvement of rural road), then bus bays must be provided for efficient and safe movement on rural roads. Its location and layout should be based on IRC: 80 – 1981 ‘Type Design for Pick up Bus Stop on Rural (ie. Non – Urban) Highways’. Bus bays should be provided for both direction of travel and located about 300m but not less than 60m on the farther side of intersection such that bus commuters cross the main road (for going to and from village) at the back of stopped bus. Typical layout is given in Fig, 14.4, for guidance.
Fig. 14.4: Typical Layout for Bus Bays
14.5 Facilities for Vulnerable Road Users (VRUs) such as pedestrians and cyclist should be crucial part of safe design of rural roads. If separate provision for their movement is not made, then they would use and share same road space as by motorized vehicles which could be dangerous for them. Rural Roads Manual prescribes 3.75 m width of carriageway and 7.5 m width for roadway. Therefore, width of 1.875 m should be available on both sides for shoulders. This width meets the requirement of minimum width of 1.8 m, prescribed for pedestrian movements, by IRC: 103- 2012. Maintaining this width with well compacted gravel (non soft soil) material would greatly facilitate pedestrian movement especially for school going children. The photographs in Fig. 14.5, should give a fair idea for well provided and maintained facility for pedestrians to walk. This would be useful for movement for cyclists.
Fig. 14.6: Pedestrian crossing Markings on Rural Roads.
14.6 Traffic Signs: Traffic signs and pavement markings are effective and essential tools for safety on rural roads and should be integral part in DPR. The important points to be kept into consideration are:
(i) The material, shape, size, configuration and placement of traffic signs must conform to the standard prescribed in IRC: 67 – 2012. If any non-standard and wrong sign exists on the road, it must be replaced by correct and standard sign.
(ii) Section 6.7 of IRC: 67 – 2012 provides guidance on the types of retro- reflective sheeting. For rural roads, Class B, Type IV sheeting by IRC 67 – 2012 may be used for better conspicuity especially in night time use.
(iii) GI pipes or rectangular hollow section as support post, should be used for sign support.
(iv) Signs should be so placed that that their bottom edge should not be less than 2 m above the kerb.
(v) If the meaning of the sign is required to be made more explicit, then a rectangular definition plate may be provided, placed below the sign as prescribed in Section 13 of IRC: 67 – 2012.
(vi) The general size of the sign should be 600 mm unless prescribed otherwise for some signs, in IRC: 67 – 2012.
(vii) Over head signs on rural roads are not required to be provided, they being single lane with low speeds.
(viii) The traffic signs prescribed by IRC 67 – 2012 , ‘Code of Practice for Road Signs’ which can be commonly used for rural roads are given below:
(a) Mandatory/ Regulatory Signs
Stop Sign Maximum Speed Limit Overtaking Prohibited Yield Sign
(b) Cautionary/ Warning Signs
Left Hand Curve Right Hand Curve Right Hairpin Bend Left Hairpin Bend
Narrow Bridge Ahead School Ahead Pedestrian Crossing
Steep Ascent Steep Descent Men at Work
Speed Hump Rumble Strips Cattle Crossing
Hazard Marker (Left) Hazard Marker (Right) Single Chevron Double Chevron Triple Chevron
(c) Information Sign– The color pattern shall be white background with black border, letters and arrows.
14.7 Rural Roads shall be provided with pavement markings as per material (thermoplastic paints with glass beads) and pattern, prescribed by IRC: 35- 2015, ‘Code of Practice for Road Markings. Essential ones are, edge line markings, STOP line and pedestrian crossing:
(a) Edge Line Markings
(b) STOP LINE (c) Pedestrian Crossing Markings
14.8 Delineators: Rural roads especially in hilly terrain for travel in night time become much safer if they are properly delineated. IRC: 79 – 2019, ‘Recommended Practice for Road Delineators’, prescribes guidance on road delineators. But, care needs to be taken that they are only of plastic material with reflectors, instead of materials such as metal, concrete, timber or cut stone since they may pose safety hazard for out of control vehicles. They can be rectangular, circular or plastic drums as shown in Fig.14.7.
Fig. 14.7: Road Delineators
14.9 Crash barriers may be provided at hazardous locations such as, where height of embankment is more than 3 m, on approaches to bridges (Fig. 14.8) as prescribed in IRC:119 - 2015, ‘Guidelines for Traffic Safety Barriers. They should also be fitted with reflective markers for enhancing night time visibility. It is important to provide suitable end treatment for such type of barrier for safety. The ends of this barrier must either be embedded into ground by tapering down or these must be embedded into the rigid parapet wall of a culvert or specially prepared rigid parapet for the purpose of embedding.
14.1 Road Studs: Provision of road studs to supplement longitudinal/ transverse reflectorised pavement markings greatly improves visibility in night time and in inclement weather. They should be provided as per Section 5 of IRC: 35 – 2015.
14.11 Hazard markers should be provided at all pipe culvert headwalls (Fig. 14.9), at each end of all box culverts, river crossing causeways and similar CD structures and at any discontinuity in the shoulder.
Fig. 14.9: Hazard Markers at Narrow Culvert
Fig.14.10: Guard Posts as recommended by IRC: SP: 82 – 20
14.13 The DPR shall provide for identification/ marking of objects (as prescribed in IRC: 35 –2015; painting of the objects such as guard rails, guard stones or trees, with white paint, up to a height of 1.25 m above the road level with 300 m band with black paint in the middle of 1.25 m height to enhance visibility. It should also provide that all objects located within 2.4m from shoulder shall be painted. In addition to the object markings, (Fig. 14.11) as provided in IRC: 79 – 2019, shall be placed in front objects to enhance visibility. The height of object marker shall be at least 1.2 m above the traffic lane.
Fig. 14.11: Object Markers as per IRC: 79 – 1981
14.14 Ramps should be provided where field paths and cattle crossings intersect the road.
14.15 Sharp, blind curves are highly hazardous locations and must be eliminated even if, it requires acquisition of land. In cases, where acquiring of extra land is somewhat impossible, then following measures should be adopted:
(i) The carriage way should be widened to two lanes at the bend.
(ii) Traffic Signs for ‘Overtaking prohibited’, ‘Speed Limit’ and ‘Compulsory Horn’ should be provided at both ends of the curve. Instead of placing them on separate support poles, they should be placed on single post as shown in Fig.14.12. Chevron sign should also be provided at the bend.
(iii) Reflective delineators or Chevron signs (Fig. 14,13) should be provided on the both sides of approaches and on the bend as specified in IRC: 79 - 2010.
(iv) Double chevron signs at the apex of curve be provided, for both direction of travel.
14.16 14.16 Rumble strips/ markings also should be provided on approaches to schools if they exist on rural roads.
14.17 The rural road entering/ passing through villages poses a serious challenge especially in Indian situation where rural roads are generally used by villagers, as the back yard of their homes. They sometimes even cook food on road besides using for their livestock. The design and safety measures/treatment will have to be site specific. Some of the design features are given here which are expected to enhance safe use of road:
(i) The stretch within the village should be treated as 20kmph zone. For some villages, it may be 15kmph zones. Therefore speed limit signs are to be installed on approaches along with gradual transitional reduced speed limit signs. Rural Roads Manual prescribes design speed for rural roads as 50 km/h (ruling) and 40kmph (minimum) in plain terrain and still lower in mountainous terrain.
(ii) ‘Village Gateways’ as per IRC:99 Guidelines on Traffic Clamming Measures may be provided.
(iii) Pre Cast Interlocking Concrete Blocks (Fig. 14.15) as prescribed by IRC; SP 63- 2004, ‘Guidelines for Interlocking Concrete Block Pavement’ and in ‘Grameen Sampark’ 2007 edition by NRRDA or Stone (granite) brick paving (if available at economic cost) can be used in the village stretch, instead of traditional bituminous one. It would help in speed reduction, avoid surface damage in rains, provide least life cycle cost due to low maintenance and give longer service life.
(iv) Concrete drains with covers should be provided in the village stretch. The level of drains with covers should be at the same level as the pavement but drainage system should provide for storm water and household drainage going into these drains. They should have self-cleansing gradient and taken to the nearest natural drain. Covers should be removable for ease of cleaning and maintenance.
14.18 Guidelines for Safety During Construction Safety in Work Zones during Construction: There could be two situations in construction of rural roads. One could be green field i.e. construction of all together, a new link road. The other could be on existing cart track/ alignment. Rural Roads Manual suggests that generally, most new roads will also have to follow the existing cart tracks and other such existing alignments. This implies that there is movement of vehicles on the road. Therefore, the situation requires careful Work Zone Traffic Management Plan (WZTMP) in work zones. The Guidelines given in IRC SP: 55–2014 –Guidelines on Traffic Management in Work Zones’ should be adopted. These are contractual requirements as these are also part of MoRD specifications for Rural Roads.
(a) Construction of rural roads may comprise mostly construction of road stretch and construction of cross drainage structure. Fig. 14.16 shows the layout of signs for road construction and 14.17 shows layout for construction of cross drainage structure.
Fig. 14.16: Typical Layout for Signs in Road Work Zone
Fig. 14.17: Temporary Diversion on Construction of Cross Drainage Structure
Road markings only for speed breaker
Cautionary, mandatory and information signs
KM stones and 200m stones
Delineators and object markers
Guard posts, crash barriers and speed breakers
Median & footpath barriers
14.1.1 Road Markings
Road markings perform the important function of guiding and controlling traffic. In village road traffic volume has low only given marking for speed breaker for safety.
14.1.2 Cautionary, Mandatory and Informatory Signs
Cautionary, mandatory and informatory signs are provided depending on the situation and function they perform in accordance with the IRC: 67-2001 guidelines for Road Signs.
Overhead signs are proposed in accordance with IRC: 67-2001.
Type of cautionary board Location ( m )
Village board ,,,,,m
14.1.3 Kilometer Stone and Hectometer Stone
The details of kilometre stones are in accordance with IRC: 8-1980 guidelines. Both ordinary and fifth kilometre stones are provided as per the schedule. Kilometre stones are located on both the side of the road.
The details of 200m stones conform to IRC: 26-1967. 200m stones are located on the same side of the road as the kilometre stones. The inscription on the stones shall be the numerals 2,4,6 and 8 marked in an ascending order in the direction of increasing kilometerage away from the starting station. Table 14.1 gives the details of Km. stone.5th km. stone and boundary pillars provided. {Insert figures in the table below and this should be shown in the drawings also}
Sl. Name of Road Chainage (km) 5th. Km. stone (nos.) Km. stone (nos.) 200m stone (nos.) Boundary Pillar
1 AMBIKAPUR PRATAPPUR ROAD To KERTA DUBKAPARA 1.75 0 3 7 70
14.1.4 Delineators and Object Markers
Roadway delineators are intended to mark the edges of the roadway to guide drivers on the alignment ahead. Object markers are used to indicate hazards and obstructions within the vehicle flow path, for example, channelising islands close to the intersections.
Roadway delineators are intended to mark the edges of the roadway to guide drivers on the alignment ahead. Object markers are used to indicate hazards and obstructions within the vehicle flow path, for example, channelising islands close to the intersections.
Delineators and object markers are provided in accordance with the provisions of IRC: 79-1981. They are driving aids and should not be regarded as substitutes for warning signs, road markings or barriers.
Delineators and object markers are provided in accordance with the provisions of IRC: 79-1981. They are driving aids and should not be regarded as substitutes for warning signs, road markings or barriers
14.1.5 Guard Posts, Crash Barriers and Speed Breakers
Guard posts are proposed on embankments of height more than 1.5m and bridge approaches. The spacing of guard post shall be 10.0 m c/c in these areas. Typical Guard post consists of pre-cast (M20) CC post of size 200 mm x 200 mm and a height of 600 mm above ground level. They are encased in M15 cement concrete to a depth of 450 mm below ground level. Guard posts are painted with alternate black and white reflective paint of 150 mm wide bands. Table 14.2 gives the details of guard posts, crash barrier and speed breakers. A layout of a typical speed breaker is given below.
Sl. Chainage (km) Guard post (nos.) Crash Barrier (m) Speed breakers (nos)
14.2 Temporary traffic control
The road under consideration has to be widened alongwith the bridges and culvert. The list below provides the c/d structures to be widened/reconstructed and temporary traffic control measures to be implemented.
Table 14.3 gives the section-wise details of temporary traffic control measures to be adopted.
(b) Table 14.1 gives the section-wise details of temporary traffic control measures to be adopted.
Sl. Chainage (km) Temporary traffic control measures to be adopted
1 5 Not Reqired diversion
2 215 Not Reqired diversion
3 1700 Not Reqired diversion
4 2200 Not Reqired diversion
5 2680 Not Reqired diversion
6 2760 Not Reqired diversion
7 2850 Not Reqired diversion
8 3100 Not Reqired diversion
9 3720 Not Reqired diversion
10 3950 Not Reqired diversion
11 5060 Not Reqired diversion
12 5460 Not Reqired diversion
13 5910 Not Reqired diversion
14 0 Not Reqired diversion
15 0 Not Reqired diversion
16 0 Not Reqired diversion
17 0 Not Reqired diversion
18 0 Not Reqired diversion
19 0 Not Reqired diversion
20 0 Not Reqired diversion
21 0 Not Reqired diversion
22 0 Not Reqired diversion
23 0 Not Reqired diversion
24 0 Not Reqired diversion
25 0 Not Reqired diversion
14.19 Checklist for Road Safety Measures
Sl Road Safety Checklist
1 Has the road been planned as per the concept of hierarchical road network Yes , provided
2 Is the road taking off from MDR and not SH or NH MDR
3 Has the transect walk realistically assessed the availability of land, identified hazardous locations and possible countermeasures acceptable to local people Yes
4 Is the roadway width of 7.5 m in plain and 6.0 m in hills is available on selected alignment without any encumbrance such as hand pumps and electric poles installed by other Departments of the Government. Yes , provided
5 Does DPR include following: (a) Horizontal Alignment and Longitudinal Vertical Profile, (b) Cross-section at required interval along the alignment within ROW, Typical Cross-Sections with details of pavement structure, (c) Detailed Drawings of intersections layout with traffic signs, pavement markings and speed management measures, (d) Detailed Working Drawings for individual Culverts and Cross-Drainage Structures, (e) Detailed Working Drawings for individual Bridges, Tunnels, Subways and Structures. (f) Detailed Drawing showing each traffic sign with its type and location, pavement markings of edge lines and pedestrian crossings at required locations. (g) Drawing showing location and layout of bus bays, if required and to be provided. (h) Detailed drawings showing safety measures (traffic signs, markings, delineators or other special treatment) for sharp/ blind curves if part of alignment. Yes , provided
6 Is the alignment on raised ground level for better drainage and side slopes not steeper than 2:1. Not Applicable
7 Is the take off point at right angle or nearly right angle with main road and at level ground. Yes , provided
8 Has the takeoff intersection been well designed and provided with Stop Line markings and signs provided. Not Applicable
9 Does the road end provide space for turning of vehicles especially buses and emergency vehicles. Yes , provided
10 Yes , provided
11 Has the road the provision for well compacted shoulders for movement of VRUs. Not Applicable
12 Has bus bays been planned and provided as per guideline of IRC: 80 – 1981 if there exists or planned bus operations. Yes , provided
13 Have the traffic signs been provided with Class B, Type IV retro reflective sheeting, at required locations and configurations as prescribed by IRC 67 – 2012 and each sign is shown in alignment plan. Yes , provided
14 Has the road been provided with pavement markings of edge lines, pedestrian markings at required locations and stop line with thermo plastic paints as prescribed in IRC: 35 – 2015 Yes , provided
15 Has the road been provided with delineation where embankment height is more than 1.5 m and at sharp bends. Not Applicable
16 Has the road been provided with delineators of plastic material with reflectors, at required locations so that road alignment and width is clearly visible during night use. Yes , provided
17 Have the crash barriers been provided at locations where the height of embankment is more than 3 m, approaches to bridges. Not Required
18 Have the crash barriers been provided with safe end treatment and or embedment in bridge/ culverts railings. Not Required
19 Have the hazard marker signs been provided correctly at each end of all box culverts, river crossing causeways and similar CD structures and at any discontinuity in the shoulder. Not Required
20 Have guard/ guide posts provided at submersible bridges and causeways. Yes , provided
21 Have the objects within roadway width removed or provided with identification/ marking with white paint. Yes , provided
22 Have ramps been provided where field paths and cattle crossings intersect the road. Not Required
23 Have sharp/ blind curves been improved and or provided with the safety treatment. Yes , provided
24 Have the road studs been provided along pavement markings to enhance night time visibility. Yes , provided
25 Have the appropriate speed management measure as per IRC: 99-2018 been provided at the intersection, approaches to schools (if exist) and other required locations needing speed reduction. Yes , provided
26 Do rumble strips provisions include painting and advance warning signs. Not Required
27 Yes , provided
28 Yes , provided
Road safety issues identified during the design were and the mitigation measures are included in all designs and shown on the DPR drawings. Details of the issues and measures are:
Details of Road Safety issues and mitigation measures to be adopted
Sl.No. Chainage Safety issues Mitigation measures adopted Remarks
1 1506 Curve At start and end of each curve
9 0 School ahead At start and end of school
1 0 Village/School/Hospital/ Bhawan ETC. At start and end of each Village. At start and end of each Village.
School & Village portion & HOSPITAL & AGANBADI & PANCHAYAT & JUNCTION POINT & CURVE PORTION Speed Breaker & cautionary Board At start and end of school and in regular interval in village
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
CHAPTER 15. SPECIFICATION
The “Specification for Rural Roads” published by IRC on behalf of the Ministry of Rural Development, Govt. of India has been followed.
15.2 Construction Equipment
a Construction by manual means and simple tools has been considered for the project as per the guideline of NRRDA. For handling of bulk materials like spreading of aggregates in sub-base & base courses by mix-in-place method, use of motor grader & tractor-towed rotavator has been allowed in line with the schedule of rate for PWD work. Compaction of all items shall be done by ordinary smooth wheeled roller if the thickness of the compacted layer does not exceed 100 mm. It is also considered that, hot mix plant of medium type & capacity with separate dryer arrangement for aggregate shall be used for bituminous surfacing work that can be easily shifted. A self-propelled or towed bitumen pressure sprayer shall be used for spraying the materials in narrow strips with a pressure hand sprayer.
Now the vibratory rollers are also being used for rapid progress.
b For structural works, concrete shall be mixed in a mechanical mixer fitted with water measuring device.
c The excavation shall be done manually or mechanically using suitable medium size excavators.
15.3 Construction Methods
15.3.1 Preparation for Earthwork
After setting out existing ground shall be scarified to a minimum depth of 150 mm and leveled manually and compacted with ordinary roller to receive the first layer of earthwork. In filling area, existing embankment will be generally widened on both sides as per the alignment plan. Continuous horizontal bench, each at least 300 mm wide, shall be cut on the existing slopes for bonding with the fresh embankment/ subgrade material as per Cl 301.7.
15.3.2 Embankment work
Material from borrow pits will be used for embankment construction as well as the approved material deposited at site from roadway cutting and excavation of drain & foundation may be used. Layer of the earth shall be laid in not more than 25 cm (loose) thick layers & compacted each layer of the soil up to 30 cm below the subgrade level at OMC to meet 97% of Standard Proctor Density.
Material for embankment and sub-grade shall satisfy the requirements of Table 300-1 and 300-2 as per the Specification for Rural Roads.
15.3.3 Sub-grade
Material from borrow pits will be used for construction of top 30 cm as sub-grade. Soil in these sections is quite good for road construction. Top 30 cm upto the subgrade level and shoulder at OMC to meet 100 % of Standard Proctor Density by proper control of moisture and by required compaction with a smooth wheeled roller.
15.3.4 Sub-base
Sub base material in the form of stone aggregates and sand as available in the area to be used in GSB Grade II layer.
Stone aggregates will be used in base course. 63 mm to 45 mm size (Grading 2) aggregate as been proposed for the bottom layer and 53 mm to 22.4 mm (Grading 3) size has been proposed for the top layer. WBM screening used should have PI less than 6. If WMM layer has to be done grading should be as per Section 400(Table 400.12) of MORD specification and fraction passing 425 micron sieve should have PI less than 6. WMM should be allowed only with WMM plant and spreading with Paver or Motor grader. 100% compaction OMC is required.
15.3.6 Shoulder
Earthen shoulder shall be constructed in layers and compacted to 100% of Proctor’s Density. First layer of shoulder shall be laid after the sub–base layer is laid. Thereafter earth layer shall be laid with base layer of pavement and compacted.
15.3.7 A Structural Bituminous layer BM/ DBM/ SDBC/ BC etc.
15.3.7 Wearing Course
Slow setting bitumen emulsion will be applied as primer on WBM/WMM layer. Emulsion shall be sprayed on surface with pressure distributor. Rapid setting bituminous emulsion shall be used for Tack coat. To ensure proper quantity of Emulsion for primer and Tack Coat Engineer incharge will check the length of spreading for one drum of Emulsion as per carriageway width.
Premixed carpet and mixed with equivalent viscosity grade bitumen shall be laid as surfacing course. 6 mm thick Type B seal coat is considered for sealing of the premixed carpet.
15.3.8 Structural Works
Following grades of concrete are proposed for Structural works and comply with MORD and IRC specifications:
• Concrete in superstructure of slab culvert – M-25(RCC)
• Concrete in abutment cap, dirt wall of slab culverts – M-20} (RCC)
• Concrete below abutment, return wall, headwall – M-20 (RCC)
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
CHAPTER 16. ENVIRONMENTAL ISSUES
16.1 Impact of the project
Environmental analysis (EA) is a key part of the planning process for a new road. It presents the opportunity to look at alternative proposals, discuss the negative and positive impacts of a given project, look at ways to mitigate negative impacts and plan for funding for those mitigation measures, incorporate the ideas and thoughts of local citizens impacted by the project, avoid delays once the project is under construction, and come up with an optimized, improved plan for the project. The environmental analysis for the proposed road is thus presented.
{Describe the impact of the proposed road on surrounding environment and ecology; this shall cover all the different components shown in the fig 17.1.}
Figure 17.1 Impact of the road
Considering the results of environmental analysis, a Carbon Emission Reduction Plan is to be prepared. This plan consists of decisions made and steps taken to reduce carbon footprints resulting from the construction and maintenance activities.
{Consultants should specify in this plan ways to enhance the environmental aspects of the project whichever are proposed. This shall include measures such as roadside landscaping and tree planting, greening of the cut slopes and other relevant stabilizing/preservation measures for the road adjoining areas. All possible steps taken to minimize the adverse environmental effects of the project, both during construction works and subsequently in road maintenance and operations should be well documented in this plan to maximum possible details.}
16.2 Calculation of CO2 equivalent savings in GHG emissions
{Calculate CO2 equivalent for Green House Gas emissions for various construction and maintenance activities for the proposed road. A sample template for the same can be referred from the study conducted by TERI for NRIDA. (The environmental specialist from the DPR preparation team should monitor and appropriate the calculations considering specificity of the proposed road or bridge as may the case. The conversion factors provided in the study by TERI can be directly used wherever necessary.) It should contain detailed analysis of two cases; carbon emission calculation for case one where road would have been constructed using conventional technology without modifying any process parameter and other where the actual process is followed using new material/technology under the category of green technology.}
16.3 Calculation of material and energy consumption for the project
{It should include detailed calculation for estimated material and energy usage during the construction as well as for maintenance activities. These calculations would help in arriving at numbers for savings in energy as well as materials wherever applicable. These numbers should be presented at the end of this section. This should contain a sub-section where savings in aggregates and other natural resources, if any should be recorded and savings achieved in GHG emission equivalent. The chapter shall contain a separate section on calculations on savings achieved for aggregates by different means adopted, which may include design modification or use of locally available/marginal materials etc.}
16.4 Compliance with the Environmental Codes of Practice
{It shall include detailed discussion on compliance with the environmental and social safeguards, environmental codes of practice, environmental management plan published by NRIDA/World Bank/Asian Development Bank. Wherever this is not complied with the above, due justification should be provided for the same.}
The proposed road has planned to be designed considering the impact on environment. Proposed road alignment follows existing pathway to the maximum extent so that huge land acquisition is not necessary for construction of the project road. Proposed road, when completed, will be an addition to the aesthetics of this rural area.
16.6 Environmental Sensitive Area (National Park, Wild Life Sanctuary, Protected /Reserve Forest, Wet land etc.) The alignment will be finalized avoiding the environmental sensitive area such as National Park, Wild Life Sanctuary, Protected /Reserve Forest, Wet land etc. It is also necessary to maintain the minimum distance of 500 m of the project road from environmental sensitive area.
16.7 Construction Camp
Construction camps will be established away from forest area/water body. The minimum facilities such as water supply, sanitation, storm water drainage, solid waste management and first aid box will be provided during the construction period of the project. Necessary provision for rehabilitation or restoration after the completion of construction phase will be done.
16.8 Permit / Clearance required prior to commending of civil work
• No objection Certificate- This will be taken by PIU from SPCB.
• Forest Department- If the project road passing thorough forest land and acquisition of the same is involved and it will be taken by PIU from Forest Department
• Consent to establish (CFE) and Consent to Operate (CFO) - This is required for Plant Hot Mix Plant, WMM Plant, Batching Plant required for the project and the same will be taken by the Contractor from SPCB.
• Lease from Mines & Geology- This will be taken by the Contractor for new Stone Quarry required for the project.
16.9 Borrow area
The filling soil will have to be procured from borrow pit. Borrow area will be so excavated that the lands can reused as agricultural field. The depth of borrow pit shall not exceed 450 mm (150 mm top soil included). The top soil shall be stripped and stacked and shall be spread back on the land. As far as possible the borrow pits shall not be dug close to the road embankment. The Redevelopment of borrow area will be done before closure of the same and it will be as per agreement between landowner and the Contractor.
16.10 Erosion Control
Turfing of the embankment slopes and earthen shoulder to prevent erosion of slopes of the embankment, rain cuts and erosion of shoulder is being suggested.
Suitable cross drainage structures have been provided on the basis of hydrological survey of the area. So, there will be no obstruction to the natural drainage of the area. Road side drainage is also duly considered in a manner so that surface water is led to the low points and is drained through the CD structures
16.12 Use of Material
Cut back bitumen is not proposed in the project to avoid contamination with Kerosene. Bitumen emulsion is proposed for primer coat and tack coat.
16.2 Environmental Sensitive Area (National Park, Wild Life Sanctuary, Protected /Reserve Forest, Wet land etc.) The alignment was finalised avoiding the environmental sensitive areas such as National Park, Wild Life Sanctuary, Protected /Reserve Forest, Wet land etc. It is also necessary to maintain the minimum distance of 500 m of the project road from environmental sensitive area.
16.3 Construction Camp
Construction camps will be established away from forest area/water body. The minimum facilities such as water supply, sanitation, storm water drainage, solid waste management and first aid box will be provided during the construction period of the project. Necessary provision for rehabilitation or restoration after the completion of construction phase will be done.
16.4 Permit / Clearance required prior to commending of civil work
• No objection Certificate- This will be taken by PIU from SPCB (State Pollution Control Board).
• Forest Department- If the project road passing thorough forest land and acquisition of the same is involved and it will be taken by PIU from Forest Department
• Consent to establish (CFE) and Consent to Operate (CFO) - This is required for Plant Hot Mix Plant, WMM Plant, Batching Plant required for the project and the same will be taken by the Contractor from SPCB.
• Lease from Mines & Geology-As materials are available from established quarry. No new mines will be required.
16.5 Borrow area
The filling soil will have to be procured from borrow pit. Borrow area will be so excavated that the lands can reused as agricultural field. The depth of borrow pit shall not exceed 450 mm (150 mm top soil included). The top soil shall be stripped and stacked and shall be spread back on the land. As far as possible the borrow pits shall not be dug close to the road embankment. The Redevelopment of borrow area will be done before closure of the same and it will be as per agreement between landowner and the Contractor.
16.6 Erosion Control
Turfing of the embankment slopes and earthen shoulder to prevent erosion of slopes of the embankment, rain cuts and erosion of shoulder is being suggested.
Suitable cross drainage structures have been provided on the basis of hydrological survey of the area. So, there will be no obstruction to the natural drainage of the area. Road side drainage is also duly considered in a manner so that surface water is led to the low points and is drained through the CD structures.
16.8 Use of Material
Bitumen emulsion is proposed for primer coat SS1 and tack coat RS1 and Bitumen VG30
#REF! DPR Consultant
CHAPTER 17. NEW TECHNOLOGY / GREEN TECHNOLOGY
17.1 New Technology/Green Technology
In order to promote cost-effective, locally relevant, ‘Green’ and fast construction technologies in the construction of rural roads, using New materials / Waste materials / Locally available materials, NRIDA has issued ‘Guidelines on Technology Initiatives’, in May 2013. The States have been asked to propose at least 10% of the length of annual proposals using any of the new technologies, for which specifications of Indian Roads Congress (IRC) are already available and an additional length of 5% of annual proposals with any of the new technologies for which specifications of Indian Roads Congress are not available, including materials accredited by IRC.
The states need to follow the above guidelines while submitting the proposals under PMGSY. The details of some of the materials/ technologies for which IRC specifications are available and for which specifications are not available are given below:
Technologies with IRC Specifications
• Lime stabilization
• Cement stabilization
• Bitumen stabilization
• Lime fly ash stabilized Bases
• Roller Compacted Concrete Pavements
• Waste Plastic Utilization
• Bio Engineering Measures
Technologies with No IRC Specifications
• Locally available /Marginal materials, Brick aggregates etc.
• Blast furnace Slag/ Steel Slag /Zinc Slag
• Jute / Coir Geo-textiles
• Rice husk, Baggage
• Slope Stabilization, Bamboo Piling etc.
• Cell Filled Concrete, Paneled Concrete
Justification for selection of technology
Check list for Adoption of New Technology/Green Technology
1 Usage of local materials
Whether local and marginal materials are proposed for usage in sub base, base layers and in construction of support structures. Please elaborate -
2. Soil and pavement stabilization -
3. Pavement surfacing -
3.1Whether cold emulsion is being proposed in the surface paving -
3.2 Is Hot Mix Asphalt(HMA) proposed in the pavement -
4. New Materials & Green Technology waste plastic
4.1 Please list out all the new materials and green technology being proposed in the DPR -
4.2 What provision has been kept for carbon sink for offsetting carbon emissions -
5. Carbon Emission Reduction Plan -
5.1 Has Carbon Emission Reduction Plan been attached? -
5.2 Does this Plan cover the three R’s, namely, Reduce, Recycle and Reinvent -
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
CHAPTER 18. CLIMATE RESILIENCY
18 Climate resilient infrastructure endures the impacts of climate related events. Changes in the climate involve changes in temperature, precipitation, melting of glaciers, storm activity, river flow, wind speeds and much more. Road infrastructure being totally exposed to the vagaries of nature is highly vulnerable to the impacts of climate change, the adverse effects of which apart from the physical damage to the road network can affect a country’s economy.
Climate change impacts the road infrastructure in various ways: high precipitation and flooding increases the risk of rendering the drainage system inadequate resulting in damage to the road drainage structures, scouring of bridge foundations, breaching of road embankments, submergence of road sections, landslides, rock falls and erosion resulting in disruption of traffic, road closure for indefinite period and weakening of pavement; and exposure of areas along the river basins to flooding causing frequent closure of the roads. Floods may lead rivers to change their course, thus rendering previously safe roads at risk of being flooded.
In the view of above, to ensure increased resilience and environmental sustainability of the rural road various climate resilient measures are proposed for this roads project. List of all such measures is as follow:
Check List of DPR incorporating Climate Resilience
1 Availability in the DPR of following documents /studies undertaken
1.1 Topographical, geological and geomorphologic maps YES YES
1.2 Geotechnical studies YES YES
1.3 Hydrological studies YES YES
1.4 Hazard data base and inventory, susceptibility and hazard zoning maps, as available - -
1.5 Any information available pertaining to the site NO YES
2 Road Geometrics
2.1 Gradients PROVIDED
2.2 Curves, hair pin bends, etc PROVIDED
2.3 Hair pin bends – gradient, radius and location – whether staggered and availability of adequate width along with stable and gentle hill slope -
2.4 Road Alignment – alternate alignments considered and whether the selected alignment is sun facing, avoids steep hill cutting, located sufficiently away from river bank and adequately raised to avoid inundation by river flood YES PROVIDED
2.5 Whether the proposed alignment crosses steep channels subjected to debris flow NO
3.1 plain, rolling, mountainous or steep PLAIN
3.2 topographical constraints such as cliffs, ravines and gorges YES
3.3 dip of the rock, joints and fractures -
4.1 profile as identified from the natural and artificial slopes such as mule tracks and footpaths, terracing for agriculture/horticulture NATURAL SLOPE
4.2 slope stability and location of earlier landslides NOT FOUND
4.3 whether the slopes are wet NOT FOUND
4.4 possibility of avalanches and snow drifts -
5 Soil Characteristics
Soil- type, depths and tendency to erode of the strata, geology of the area
SANDY CLAY SOIL MOSTLY NOT ERODIBLE
6 Drainage characteristics (whether existing protection works adequate or need enhancement)
6.1 Surface EARTHEN
6.1.1 Side drains- type, size and whether lined 60CM X60CM P.C.C.
6.2 Sub-surface GSB
6.2.1 Catch water/intercepting drains – whether required and provided with justifications YES
6.3 susceptibility to flooding and if so, flood levels and river training provision incorporated -
7 Land use of water shed/catchment area
7.1 River/stream characteristics -
7.1.1 whether meandering or straight STRAIGHT
7.1.2 banks erodible or non-erodible NONE ERODIBLE
7.1.3 river bed soil classification COARSE SAND/BOULDERS
7.1.4 discharge and velocity of the flow -
7.1.5 recorded maximum flood discharge and HFL at proposed site -
7.2 Catchment Area characteristics ATTCHED PER ALL LOCATION
7.2.1 slope of the catchment area -
7.2.2 Vegetation cover – extent and type -
7.3 Land use within the catchment area ( at present and expected in future) -
8 Climatic Conditions
8.1 Temperature 25-45 DEGREE C
8.2 Rainfall >1200MM
8.4 Fog conditions -
8.5 Exposure to Sun -
8.6 Unusual weather conditions such as cloudburst/ flash floods -
9 Design and Construction
9.1 Whether huge vertical cuts avoided, benching adopted and quantity of earthwork accordingly taken in BOQ YES PROVIDED
9.2 Whether the quantity of earthwork in excavation has been considered by keeping the cut face of the hill slope as per the soil classification shown in the cross-sections YES PROVIDED
9.3 Has the choice of manual/mechanized cutting factored in the terrain condition (briefly comment) YES IN AREAS OF STEP SLOPE OR HILLY TERRAIN
9.4 Whether the item taken for excavation in rock specifies, ‘blasting prohibited’, and rate for the item accordingly taken in BOQ -
9.5 Whether provision kept in the BOQ for use of useful excavated material in the project itself YES PROVIDED
9.6 What efforts made to balance cut and fill methodology YES
9.7 Location of dumping sites and proposed development of these sites as playground/park /parking area, etc. (Payment for the quantity of excavated material actually dumped at site to be made based upon initial and final levels of the dumping site) -
9.8 Whether the size and type of support structures provided are adequate and are justified with proper documentation, site conditions, etc. YES
9.10 Have the intensity, duration and frequency of rainstorms/cloudbursts occurring as a result of climate change considered in the design of robust slope stabilization measures and assessing provisions related to drainage -
9.11 Has the capacity of cross drainages fixed based upon the size of the catchment area, its characteristics and the rainfall pattern and due allowance made for possible blockages YES AS PER CATCHMENT AREAS
9.12 Have the CDs been proposed at natural drainage crossings and not allowed water to continue beyond them thereby overloading the side drains, etc. YES
9.13 What efforts have been made to provide precast culverts/side drains and of standardized sections -
9.14 In case a culvert location has likely diversion potential due to huge debris flow what provisions have been kept to accommodate overtopping without washing -
out the structure or diverting flow down the road -
9.15 Is there a possibility of some of the nallahs/gullies widening and deepening as a result of higher intensity and frequency of rainfall? If so, what provisions have been kept to mitigate this problem NO POSSIBLITY
9.16 Have provisions been made for scour checks in side drains if the slope exceeds 4% -
9.17 In case of soft hill profile has the height of vertical face of side drain increased to function as a toe wall -
9.18 Have the hair pin bends been provided with CDs both on the lower and upper arms along with provision of escape drain on the upper arm -
9.19 Is there provision for bio engineering measures with or without civil engineering measures at locations expecting shallow seated slope failure -
9.20 Is provision kept for covering (stabilizing) cut and fill slopes with vegetation, to minimize surface instability problems as well as minimize surface erosion -
9.21 How is the pavement proposed to be made durable in reaches passing through saturated soils/ black cotton soils or such poor soils, areas subjected to flooding, etc. -
10 Likely foundation strata for major structures
LOOSE BOULDERS & CLAYE STRATA.
11 Detailed Field Investigations carried out
11.1 Geotechnical, subsurface and drainage investigations YES DONE
11.2 Diagnostic assessment of the landslides and their likely significance -
11.3 For flood risk assessment the source of flood water, the route it follows and the assets likely to be affected -
12 Any other information
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
CHAPTER 19. ANALYSIS OF RATES
19.2 Basic Rate of Material
The basic rates for stone materials & river bed materials have been taken from
For bituminous materials, basic rate at (location) for equivalent viscosity grade bitumen and for emulsion the basic rate of (location) has been considered as suggested in from
Basic rate of other materials like coarse & fine sand, cement are as per the latest from
Basic rate of steel materials at sub-divisional office has been considered in analysis after adding cost of carriage, loading & unloading.
19.3 Lead for Materials
For stone aggregates and sand, lead from source to work site is calculated from the district map and block level map of DRRP and finalizing the same in discussion with PIU. The supply of different materials to worksite is by road. Lead for bituminous & steel materials are similarly obtained using SOR. The PIU should certify that the leads of materials used in the DPR are shortest and economical.
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
CHAPTER 20. COST ESTIMATE
Cost Estimate of project is to be arrived on the following basis
• Selection of Items of work
• Estimation of item wise quantities
• Analysis of Rates
• Maintenance Cost per KM, per Year to be paid as per predeclared rate on PBMC to contractor as per carriageway width for Flexible Pavement and Rigid Pavement separately.
20.2 Estimation of Quantities
All the relevant road and structure work Items will be identified as per survey, design and drawings. Major item of works considered are given below:
• Site clearance, dismantling and earthwork
• Pavement works (GSB, WBM, WMM, Bituminous layers)
• Cross drainage structure works
• Drainage and protective works
• Utility relocation
• Road safety and furniture
• Maintenance works
Quantity of earthwork is to be derived from the proposed cross section drawings. Volume of cut and fill is to be obtained directly using the design package software. Quantity derived from software is to be manually verified. The details are to be provided chainage wise in Tabular form for total cut and fill volume. The soil obtained from roadway excavation shall be used for construction of embankment and shall be paid as per item no.4. All other quantities will be computed from the drawings of finished road, miscellaneous drawings & drawings of CD Structures.
Table of cut and fill volume enclosed here.
20.3 Abstract of Cost
Unit rates to be derived by using the “Schedule of Rates for Road Works, Culvert works and Carriage etc. PMGSY. The abstract of Cost estimate is given in the Table below.
20.4 Maintenance
Cost of Annual Maintenance for five years after completion of project, cost of 6th year renewal coat and cost of further five years annual maintenance after the completion of 6th year renewal coat are to be estimated as per the PMGSY-III Guidelines. Different activities of ordinary repairs are to be done as and when required.
DPR Consultant Sub Engineer (PIU, PWD -.ANTAGARH) S.D.O(PIU, PWD -.ANTAGARH)
CONSTRUCTION PROGRAM
Assuming that the Construction of the Batch I road will start from Feb-2025.This is a high snowfall area and snow season starts from Novembert to March. However, the construction program is based for a total working period of 18 months, considering the program set out by MoRD. It is anticipated that some activity like collection of materials, CD works etc. will continue in Winter/ monsoon period also.
21.2 REALISTIC DURATION
The project is expected to be completed in a span of 18 months including the off period of around 4 to 6 months. Details of construction program are shown in the bar chart
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
1 Site & Lab. Establishment
2 Site Clearence
3 Initial Survey
7 Earthen Shoulder
12 Hard Shoulder
18 Protection Work
19 Road Furniture
Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
MAINTENANCE OF ROAD
Road Name NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA District BASTAR
Length 5.500 Km
Description of Item
Amount Required for maintenance of Road for five years after completion of Project. Length of Road (KM) Rate(Rs) Amount (Rs)
Renewal coat after 5 years 5.500 0.00 0.00
Maintenance after 6th years renewal coat
Total Amount 2200000.00
Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA
Technical Report and Specification
1 Name of work Construction of Rural Roads under P.M.G.S.Y.
2 Name of Road NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
3 Length of road (KM) 5.5 Km
4 Name of Block BASTAR
5 Name of District BASTAR
6 Estimated cost Rs. 484.73 Lakh
9 Authority Chattisgarh Rural Road Development Agency, Raipur. Main!A1
(a) Administrative sanction Chattisgarh Rural Road Development Agency, Raipur.
(b) Technical Sanction S.E. PMGSY AMBIKAPUR,S.E. Project Circle No. 01 PMGSY BASTAR is the authority for issuing the Technical Sanction.
10 Necessity of work To provide the facilities to the villagers for transportation of their Agro products, Educations, Medical aids etc
1 Clearing and grubbing of road land to desired width
2 Earth work for Embankment is proposed. 1.75
3 Granular Sub Base in 4.05m. width and 0.15 m. thickness 0.875
4 WMM LAYER -I in 3.85m. width and 0.075m. thickness
5 WMM LAYER -II in 3.85m. width and 0.075m. thickness
6 OGPC in 3.75m. width and 0.020 m. thickness
7 SEAL COAT in 3.75Mt Width.
8 Pannal Concrete in 3.75m. width and 0.100m. Thickness
9 Shoulder in 1.875m width Both Sides./ or available width. 2.75
10 Cross Drainage works 120
11 Road Furnishing..
10 In the village area, since the width in available to construct 3.75m wide The shoulder has been proposed as hard shoulder.
12 The CDs on the road need to be replaced with new ones. The Road is passing through open area. Hence the CDs proposed are slab culverts.& Hume pipes obtained from dismenteling of culverts, will be handed over to concerned agency.
13 Rates and specification The rates and specifications are based on the Schedule of Rate inforced from in PMGSY.
Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA
Summary Sheet of Existing Road
Road Name : NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block BASTAR
Length : 5.500 Km District BASTAR
Sr. No. Chainage Road crust Total Crust Available Width of Crust (in M) Width of road up to Shoulder (in M) Condition of road Proposal Main
From To G-III G-II CC GSB
(M) (M) (in m) (in m) (in m) (in m) (in m)
1 0 100 0 0 0 0 0 0.00 0 0 PROPOSED CC ROAD.
1 100 1300 0 0 0 0 0.00 0.00 0.00 EARTHEN ROAD PROPOSED BT ROAD.
2 1300 1650 0 0 0.15 0.15 0.30 3.00 5.00 EARTHEN ROAD PROPOSED CC ROAD.
3 1650 2800 0 0 0 0 0.00 0.00 0.00 EARTHEN ROAD PROPOSED BT ROAD.
5 2800 3100 0 0 0 0 0.00 0.00 0.00 EARTHEN ROAD PROPOSED CC ROAD.
5 3100 3350 0 0 0.1 0.15 0.00 0.00 3-4 EARTHEN ROAD PROPOSED BT ROAD.
7 3350 3450 0 0 0 0 0.25 5.00 5.50 EARTHEN ROAD PROPOSED CC ROAD.
8 3450 4400 0 0 0 0 0.00 0.00 3-4 EARTHEN ROAD PROPOSED BT ROAD.
9 4400 4500 0.00 0.00 3-4 EARTHEN ROAD PROPOSED CC ROAD.
10 4500 5510 0.00 0.00 0.00 EARTHEN ROAD PROPOSED BT ROAD.
Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA
GENERAL ABSTRACT
Length of Road: 5.500 Km Name of Road : NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block: BASTAR District : BASTAR
Sr. No. Particulars Details Total Cost in Lacs (Rs) Incl.18% GST
1 Flexible Pavement 4.3 KM 217.11
2 Rigid Pavement 1.4 KM 101.08
3 Road Furniture & Other Work 4.3 KM 10.23
4 Protection Work - 46.63 Main!A1
5 P.C.C. Drain Work 0.44 KM 14.97
6 Cost Of Cross Drainage works 1 Nos. 94.72 Abs. CD'!A1
7 Utility shifting/relocation - 0.00
Total Cost of Road Project Rs. 484.73 Lacs
Cost Per KM Rs. 88.13 Lacs
Maintenance Cost & Renewal for 5 Years Rs. 25.96 Lacs
Utility shifting/relocation 0.00 Lacs
Total Cost of Road Project including maintainance Rs. 510.69 Lacs 0.00
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA
PACKAGE SUMMARY
District:- BASTAR
State:- CHHATTISGARH
S. N. District Block Link Route No. Name of the Road Type of Proposal Proposed length (In Km) Cost of Pavement Details of C.D Cost Of Protection Work Others Total estimated Cost Average Cost per Km
From To *N/U BT CC Total No. Cost Const Maint. Const Maint.
1 BASTAR BASTAR 0 NAWA RATENGA PARIPATPARA MUKHYAMARG BADE BADRENGA N 4.30 1.40 5.70 269.65 13 80.27 39.52 21.35 410.79 22.00 72.07 3.86 0.00
Prepared By:- Signature Scrutinized By:- Signature
Technical scrutiny done by Signature
Checked by:- Signature
Name: Coordinator STA Signature
Proforma C (2021)- Part-1
PRADHAN MANTRI GRAM SADAK YOJANA (PM-JUGA)
CHECKLIST FOR PIU & STA
( For Indvidual Road Works )
Final Proposal Details (To be filled by PIU & Verified by STA)
1. Location State: CHHATTISGARH District : BASTAR Block: BASTAR
2. Package Number CG-
3. Name of the Road (as per OMMAS) NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
4. Planning (Check from CUCPL and GeoSadak)
a Is the road a part of DRRP and Approved CUCPL (Mark ✔ as appropriate) Yes No
b Is the road proposal uploaded on GeoSadak (Mark ✔ as appropriate) Yes No
Screenshot of the proposed alignment from the GeoSadak to be attached with the DPR
c Indicate coordinates of Starting and Ending point of the Proposed Road Starting Point Ending Point
Latitude 19.3658 19.3463
Longitude 81.9293 81.929
d Details regarding the components of the candidate road?
Component Roads DRRP Road Number Road Name Trace Map Rank PCI DRRP Length considered (km)
Component Road 1 - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA - 2 5.5
Component Road 2 - - - - -
Component Road 3 - - - - -
e Through Route/ MRL Number T - - OR MRL- -
f Name of benefited habitations (benefited habitation report generated from OMMAS to be attached with the DPR)
Sl. No. Name of Habitation Population Sl. No. Name of Habitation Population Sl. No. Name of Habitation Population
1 Bade Badrenga 122 6 - - 11 - -
g Names of facilities along the Candidate road (For PMGSY-III facilities, report generated from OMMAS to be attached with the DPR)
Sl. No. Name of Facilities (as per PMGSY-III Objectives) Sl. No. Name of Facilities (as per PMGSY-III Objectives) Sl. No. Name of the other Facilities Sl. No. Name of the other Facilities
h Utility value -
j Whether the proposed road leads to (Mark ✔ as appropriate) MDR SH NH
k Average PCI of the road to which proposed TR or MRL will be connected 2
l Average PCI value of proposed road 2
m If PCI of MDR / SH / NH is 3 or below , whether the State is undertaking for upgrading it from State fund available (Mark ✔ as appropriate) Yes No
5. Eligible CUCPL length (km) - 5.5
6. Total Proposed Length (km) - 5.5 In Built up area (km) - 0.2 In Open Area (km) - 5.3
7. Is there any variation between eligible CUCPL length and Proposed length (Mark ✔ as appropriate) Yes No
If Yes, Reason for variation to be mentioned N/A
8. Existing status of proposed road (PMGSY/ Non-PMGSY Portion)
Chainage Length (km) Year of Construction* Corresponding existing PCU/day Corresponding Design Traffic Category
PMGSY Portion 0 TO 5.5 5.5 NEW WORK - T-4
Non-PMGSY Portion N/A N/A N/A N/A N/A
Note : *Actual date of completion of previous construction/ upgradation.
9. Existing Surface Status of proposed road
Existing Surface Status
Track/ Earthen Gravel/ Moorum WBM Brick Soling Bituminous Wearing Course CC
Chainage Length (km) Chainage Length (km) Chainage Length (km) Chainage Length (km) Chainage Length (km) Chainage Length (km)
From To From To
Total Total 4.30 Total Total Total Total Total 0.20 4.50
10. Type of proposal
Chainage Length (km)
Riding Quality Improvement (RQI) - -
Upgradation without widening RD--,-,-,-M 0
Upgradation with widening RD-1100-1300,-,-,-M 0.20
New Construction CC Pavemnet RD-300-700,4700-5500,-,-M 1.20
New Construction (From existing non-BT portion) RD-0-300,700-4700,-,-M 4.10
11. Type of Pavement Proposed
Chainage Length (km)
Flexible RD-0-300,700-4700,-,-M 5.3
12. a. Whether the Proposed Road has the desired Road Land Width (RLW ) to accommodate required carriageway/ roadway (Mark ✔ as appropriate) Yes No
If No, what measure has been taken in DPR chainage wise Chainage Measures taken
b Indicate the widths of the following for the proposed road Existing Widths (m) Proposed Widths (m)
In the Built Up Area In the Open Area In the Built Up Area In the Open Area
i) Carriageway 3.00 3.00 3.00 3.00
iii) Road Land Width 9.00 9.00 9.00 9.00
13. INDEX MAP (not to scale ) : To be attached saperately
MDR-42 H- Habitation
Enroute Habitations Name / Chainage F-Facilities name
CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD
MDR-42 H- Habitation
Enroute Habitations Name / Chainage F-Facilities name
CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD
MDR-42 H- Habitation
Enroute Habitations Name / Chainage F-Facilities name
CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD
14. Traffic Data
Month & Year of Traffic Volume Count = 15-Mar-25
Days Motorised Traffic Non Motorised Traffic
Cars, Jeep, Vans, Three Wheelers Motorised two Wheelers Light Commercial Vehicle Trucks Agricultural Tractors Trallers Buses Cycles Cycle Rickshawa Animal Drawn Vechicle
Loaded Unloaded Over loaded Loaded Unloaded Over loaded Loaded Unloaded Over loaded SWC Num. Tyred
3 days traffic count is required in case design is done using IRC SP:72-2015 and 7 day count required in case design is done with IRC 37:2018
a Traffic Details in case design is done as per SP IRC 72:2015
ADT in the year of Traffic Count = 1377
Growth rate adopted (%) = 0 Base Year Traffic AADT (T) = 1225
Design Life (Years) = 10
Number of Harvesting Seasons = 1
No. of Days in Each Harvesting Season (t) = 75 Cumulative ESAL = 181846
Value of (n) assumed = 983 Traffic Category = T-4
b Traffic Details in case design is done as per IRC 37-2018
A= Intitial traffic in the year of completion of construction in terms of the number of commericial vehicles per day N/A TRAFFIC SURVEY BASED ON SIMILAR TYPE OF ROAD ALIGMENT.
D= Lane distribution factor
F= Vehicle damage factor
n= Design life in years
r= growth rate adopted %
N= The cumulative number of standard axles to be catered for the design in terms of msa
Projected Commercial Vehicle Per Day
c Projected Passenger Car Unit (PCU/day)
15. Design Subgrade CBR ( for Different Sections atleast one Test/km ) =
16. Relavant Method & Codes used for Pavement Design
a Method Used for Designing of Pavement ((Mark ✔ as appropriate) Conventional New Technology
b If New Technology is used, indicate the name (Please indicate New Technology used in Subgrade, Sub-Base, Base, Surface Course layer separately) PANAL CONCRETE/WASTE PLASTIC
c Code used for designing Flexible pavement (Mark ✔ as appropriate) IRC:SP:72-2015 IRC:37-2018
d Code used for designing Rigid Pavement (Mark ✔ as appropriate) IRC:SP:62-2014 IRC:58-2011
e Any other Codes used for New Technology/ Other, please indicate N/A
17. Existing and Proposed Pavement Cross Section drawing & details both for flexible and rigid (Separately Chainage-wise)
i) Cross Section of the Existing road showing different component layers. Cross Section of the Proposed road showing different component layers.
Chainage RD-0-300,700-4700,-,-M Chainage RD-0-300,700-4700,-,-M
(Drawing should be as per Existing Pavement) Pavement Layer Thickness (mm) (Drawing should be as per actual provisions made in DPR) Pavement Layer Thickness (mm)
ii) Cross Section of the Existing road showing different component layers. Cross Section of the Proposed road showing different component layers.
Chainage RD-1100-1300,-,-,-M Chainage RD-1100-1300,-,-,-M
(Drawing should be as per Existing Pavement) Pavement Layer Thickness (mm) (Drawing should be as per actual provisions made in DPR) Pavement Layer Thickness (mm)
GSB 150 WMM 100
iii) Cross Section of the Existing road showing different component layers. Cross Section of the Proposed road showing different component layers.
Chainage From To
(Drawing should be as per Existing Pavement) Pavement Layer Thickness (mm) (Drawing should be as per actual provisions made in DPR) Pavement Layer Thickness (mm)
iv) Cross Section of the Existing road showing different component layers. Cross Section of the Proposed road showing different component layers.
Chainage From To
(Drawing should be as per Existing Pavement) Pavement Layer Thickness (mm) (Drawing should be as per actual provisions made in DPR) Pavement Layer Thickness (mm)
v) Cross Section of the Existing road showing different component layers. Cross Section of the Proposed road showing different component layers.
Chainage From To
(Drawing should be as per Existing Pavement) Pavement Layer Thickness (mm) (Drawing should be as per actual provisions made in DPR) Pavement Layer Thickness (mm)
Separate cross section drawings along with tabular details of the pavement layers should be repeated (chainage wise) for each type of cross section encountered.
18. Sources and the Lead distances of Materials are as under (Lead to be measured from the mid-point of the proposed road)
Sl. No. Material Source Lead Distance (km) Sl. No. Material Source Lead Distance (km)
1 Earth for embankment construction Local 1-2km 6 M-Sand Raipur 80-90km
2 Murrum/ Carted soil (Subgrade) Local 5-10 Km 7 Cement RAIPUR 350-450 Km
3 Murrum/ Gravel for shoulder (Subgrade) Local 5-10 Km 8 Emulsion Raipur 350-450 Km
4 Aggregate Local 80-90km 9 Bitumen Raipur 350-450 Km
5 Sand Local 10-15 Km 10 Steel RAIPUR 350-450 Km
19. Cost Details of proposal (Please fill all the entries or write "NA" wherever applicable )
a Pavement Components
Description of layer Quantity Unit Rate in Rs. Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
Flexible pavement
Preparatory & Earthwork
i Clearing & scarifying - Sqm 0.00 384719.50 69249.51 4.54 0.825 0.000
ii Earth Work - in Excavation/ Cutting 5475.62 Cum - 198917.06 35805.07 2.35 0.427 0.000
iii Earthwork- in Filling (Embankment) 15292.67 Cum 222.00 3394972.54 611095.06 40.06 7.284 0.000
iv Subgrade (if provided seperately)
a. Subgrade (Using local Soil) Cum
b. Subgrade (Carted Soil) Cum
c. Treated Subgrade (Stabilized Subgrade) Cum
c. GSB Quality Shoulder Cum
Sub-Base Course
vii Soil + Aggregate Mix Cum
viii Stabilised sub base Cum
ix WBM Gr -II Cum
x WBM Gr -III Cum
xii Stabilised base Cum
Bituminous Course
xv Binder Course (BM/ DBM ) Indicate Type Cum
xvi Surface Course (OGPC/ SDBC/ BC) Indicate Type 18704.13 Sqm/ Cum 170.00 3179701.43 572346.26 37.52 6.822 0.000
xviii Surface Course with Surface Dressing
a. Single Coat Surface Dressing Sqm
b. Double Coat Surface Dressing (with or without Pre-Coating indicate) Indicate Type Sqm surface drain
Cement Concrete Road
xxi Concrete for Pavement (M15) on existing CC Pavement 1111.50 Cum 4576.00 5086224.00 915520.32 60.02 10.91
xxii Concrete for Pavement (M30) for newly proposed CC Pavement portion 0.00 Cum 5889.00 0.00 0.00 0.00 0.00
xxiii shoulders works 652.50 Sqm - 136091.25 24496.43 1.61 0.29
xxiv Cell Filled Concrete Pavement Cum
xxv Panelled Cement Concrete Pavement 472.50 Cum 6048.00 2857680.00 514382.40 33.72 6.13
xxvi Dismantling of Cement Concrete Pavements 0.00 Cum 2068.00 0.00 0.00 0.00 0.00
Total cost of Concrete Pavement (b) 8565552.75 1541799.50 101.07 18.377 8566317.750 765.000
Total cost of Pavement (a + b) 26925102.34 4846518.42 317.72 57.767
Cost deduction due to higher specification in pavement design** 0 0.00 0.00 0.000
Final Pavement Cost after deduction 26925102.34 4846518.42 317.72 57.767
Note : ** The details of Higher Specification considered in pavement design over & above admissible guidelines need to be provided under 19 (g) and detailed calculation of the same to be attached with the DPR separately.
b Cross Drainage (CD) Works
i Existing CD (requiring repair)
Type of CD Location/ Chainage Number Total Length of CDs Amount in Lakhs
iii New proposed CD
Type of Proposed CD Location/ Chainage Number Total Length of CDs Amount in Lakhs
1R x 1000mm Dia H.P.C #NAME? 10.00 10.00 0.00
1.50 m SPAN SLAB CULVERT #NAME? 2.00 3.00 20.77
iii New proposed CD
Type of CD Location/ Chainage Number Total Length of CDs Amount in Lakhs
3.0 m SPAN SLAB CULVERT #NAME? 0.00 0.00 0.00
6.0 m SPAN SLAB CULVERT #NAME? 0.00 0.00 0.00
6.0 m 2SPAN SLAB CULVERT #NAME? 0.00 0.00 0.00
Field Crossing - 10.00 0.60 4.07
Field Crossing in CC Portion - 4.00 0.60 0.60
Dismentling Cost of Ex. Culvert - - - 3.77
Improvement Cost of Ex. Culvert - - - 0.00
Note: Similar type of CDs may be grouped together for each category
Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
Protection works
c Protection works Chainage (Expand as applicable)
From To Length( m) Amount in Lakhs Average cost/ m in Lakhs
Retaining wall I Side #NAME? 0 0.00 0.000
Both Side #NAME? 0
Breast wall I Side #NAME? 0 0.00 0.000
Both Side #NAME? 0
Toe wall & Pitching I Side #NAME? 0 39.52 7.185
Both Side #NAME? 570
Pitching / turfing for slopes i
Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
Total cost of Protection works 3951559.20 711280.66 46.63 8.478 3951559.200 0.000
Side Drains (if Provided)
d Side Drains (if Provided) Chainage (Expand as applicable)
From To Length( m) Amount in Lakhs Average cost / m in Lakhs
Pucca Drain (U/ V/ Trapezoidal/ etc) (Indicate Type) U I Side #NAME? 440 12.69 2.307
Both Side #NAME? 0
Earthen/ Kacha Drain I Side #NAME? 550 0.40 0.072
Both Side #NAME? 917
Drain With Wall I Side #NAME? 0 0.00 0.000
Both Side #NAME? 0
Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
Total cost of Side Drains works 1308359.8528 235504.77 15.44 2.807 1308359.853 0.000
e Road Logo, other Road Furniture including Road safety signs (Expand as applicable)
Sl. No. Type of Road Furniture Chainage Number Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
i Retro-Refl ective Traffi c signs 33 81047.12 14588.48 0.96 0.174
ii PMGSY 'Logo' board 3 19878.00 3578.04 0.23 0.043
iii PMGSY informatory Sign Board 1 17699.00 3185.82 0.21 0.038
iv Citizen Information Board 1 14010.00 2521.80 0.17 0.030
Total cost of Road Furniture 132634.12 23874.14 1.57 0.285
f Any other Provisions
Sl. No. Items (Please Specify) Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
i Kilometre Stones & Boundary Pillar, Guard Stone 87011.00 15661.98 1.03 0.187
ii Consultancy charges ,Stone Inauguration 0.00 0.00 0.00 0.000
iii Road Marking & Speed Braker 647064.00 116471.52 7.64 1.388
Total cost of Other Provisions 734075.00 132133.50 8.66 1.575 866709.120 0.000
g Other Items under Higher Specifications (Additional Cost to be borne by the State, apart from those under 19(a) to 19(f))
Sl. No. Items Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
i Land Acquisition
ii Shifting of Utilities 0.00 0.00 0.00 0.000
iv Any other (Please specify)
Total cost of Higher Specification 0.00 0.00 0.00 0.000
Total Construction Cost
h Total Construction Cost - Sum of 19 (a) to 19 (g) Amount in Rs. GST in Rs. Amount (I/C GST) in Lakhs Average cost/ km in Lakhs
Total Construction Cost of the Project 37798451.72 6803721.31 446.02 81.095 41079216.725 3280765.000 -38.71 C'!K36
20. Five Year Routine Maintenance
To be estimated as per provision of Operation Manual Year Cost (I/C GST) in Lakhs % of Total construction cost Cost /km in Lakhs
Renewal coat after 5 years 0
Total Maintenance Cost 25.96 4.72
Maintenance after 6th years renewal coat I 0.00 0.00 0.00
Total Maintenance Cost 0.00 0.00
Grand Total of maintenance 25.96 4.72
21.Does the Estimation Conform to Standard Rate Analysis and SSR generated for the current Phase (Mark ✔ as appropriate) Vetted at NRIDA Year of SoR
22. Final Project Cost Abstract :
Cost sharing pattern between MoRD and State (Mark ✔ as appropriate) General Area (60:40) Special Area (90:10)
Item as per Entry 19 above Total Cost in Lakhs GST in Lakhs Total Cost (I/C GST) in Lakhs MoRD Share in Lakhs State Share in Lakhs Average Cost/ km (I/C GST) in Lakhs
19(f) Other Provisions 7.34 1.32 8.66 5.20 3.46 1.57
19(g) Higher Specifications 0 0.00 0.00 Not Applicable 0.00 0.00
Total Project Construction Cost (Excluding Maintenance Cost) 377.98 68.04 446.02 267.61 178.41 81.09 377.98 -0.00
Note : In calculating MoRD and State Share for items 19 (a) to 19 (f) above, a proper calculation sheet should be attached if specifications/ provisions higher than those prescribed in the guidelines have been taken in the estimate e.g. extra width of road or crust thickness or provisions of bituminous layer over & above that allowed in the guidelines. In such cases, the extra cost should be fully booked under State Share. All such extra amount, over and above the sharing pattern between Centre and the State, so booked in the state share for items 19(a) to 19(f) above, plus the amount under 19(g) will become the total amount of higher specification.
Certified that the source of materials & lead distance is shortest, and other information provided above is correct
Prepared By (Signature) Checked By at PIU/ Circle office (Signature) Technical Scrutiny at STA by: (Signature)
Designation Designation Designation
Counter Signatures of Co-ordinator STA :
Proforma C (2021)- Part-2
PRADHAN MANTRI GRAM SADAK YOJANA (PM-JUGA)
CHECKLIST FOR PIU (To be filled handwritten by PIU Head)
NAME OF ROAD :-NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Sl No Items To be filled by PIU (Yes/No) Reference wherever applicable (Page no. in the DPR)
1 Whether the Certificate of Census 2011 attached with DPR ? YES
2 Whether the transect walk photographs, Minutes of Transect walk, Grama Sabha approval attached with the DPR ? YES
3 Whether the benefited habitations and facility report generated from OMMAS attached with the DPR ? YES
4 Whether the Preliminary DPR Report generated from Gati Shakti attached with the Final DPR ? -
5 Whether the proposal uploaded on GeoSadak and Gati Shakti and screenshot of the proposed alignment is attached with the DPR ? YES
6 Whether clear coloured & geotagged photographs at 100m interval depicting road pavement condition are attached ? YES
7 Is the raising of the embankment required as per the site conditions? YES
8 Whether the rates taken in BOQ from recent vetted SoR , If Yes Please mention the date of vetted SOR from NRIDA ? YES (2025)
9 Whether the PIU has taken any item in the BOQ which is not incorporated in the recent vetted SoR NO
10 Whether required roadway land width of 9 m and 7.50 m for 5.50 m and 3.75 m carriageway width respectively available througout or as per codal provision depending upon terrain ? YES
a If no, whether chainage wise details of available land width is attached with the DPR? NA
b If no, whether land acquisition proposed for obtaining required land width? NA
11 Whether the road has Geometrics as per Rural Roads Manual (RRM) / Latest Circulars of NRIDA? YES
12 Whether the radius of the curves provided are adequate as per codal provisions for design speed on rural roads? YES
If not, whether precautions have been taken and included in the DPR? NA
13 Is Road Plan, L & X section and Junction design drawings attached ? YES
14 Is Traffic Signs and Road Marking Plan attached with DPR ? YES
15 Whether soil test report showing (a) Gradation (b) Plasticity limits (LL, PL & PI) (c) Standard Proctor Compaction (MDD & OMC) (d) CBR tests on existing subgrade soil is attached ? YES
16 Whether stabilisation of subgrade proposed in case subgrade CBR is less than 5% for pavement in widening portion or for new pavement construction? NA
17 If stabilisation of subgrade is proposed, whether the test report of stabilised subgrade for determining 'Optimum stabiliser content' and 'subgrade strength achieved after stabilisation' is attached ? NO
18 Whether any carted soil is proposed for improvement of sub grade/ shoulder? NO
If yes, whether test results of carted soil is attached with the DPR? NA
19 Whether the test results of GSB material is attached with the DPR? NO
20 Whether 3 days/ 7 days traffic survey details attached with the DPR? YES 3 DAYS
21 Whether 3rd party Traffic verification using ATCC is carried out for more than 1 MSA traffic as per guidelines/ as per latest circular and reports attached with the DPR? NA
22 Whether Axle load Surveys carried out for more than 1 MSA traffic and reports attached with the DPR? NA
23 Is the carriageway width (single lane or intermediate lane) of the proposed road is as per PCU/day consideration? (Refer to IRC 64:1990) YES
24 Whether existing road pavement has been divided into different sections (chainage starting from and chainage up to) depending upon extent of distress for strengthening/ rehabilitation of the proposed road section-wise? YES
If not, whether detailed reasons indicated in the DPR ? NA
25 Is the Pavement design done as per latest version of IRC Code? IRC SP:72-2015 and IRC SP:62-2014 or IRC 37-2018 and IRC 58-2011 YES
26 Whether earth obtained from cutting section has been proposed for using in filling section? (Cutting from High embankment, side drains, protection work, CD work, etc.) YES
If not, whether detailed reasons indicated in the DPR ? NA
27 Whether hard rock or ordinary rock classification and quantity of hard rock or ordinary rock cutting proposed are justified based on previous experiences and rock outcrops seen in that area? YES
If yes, whether due credit given to hard rock ? NA
28 Only for PMGSY (Stage -I) sanctioned road
Whether the km wise existing pavement crust details (pavement layer details and their thickness, year of construction) are properly filled in Part-1 of Proforma C ? YES
Whether the proper weightage is given for the existing crust thickness while designing overlay thickness? YES
Whether overlay thickness is as per Clause 2.2.3 of IRC SP: 72-2015 based on traffic category ? YES
29 Whether the Binder Course/ Surfacing Course has been proposed as per IRC SP:72 - 2015 or IRC 37-2018 ? YES
If not, whether detailed reasons indicated in the DPR ? NA
30 Is Location of CDs, drains and Protections marked in L and X section drawings? YES
31 Whether length of existing/ proposed CDs/ Bridges deducted from pavement quantity calculation? YES
32 Whether the clear coloured photographs at the location of existing and Proposed CD structures, and protection structures are attached ? YES
33 Whether hydraulic calculation for each CD structures attached? YES
34 Whether latest rainfall data used for the design ? YES
35 Is the provision of CD structures and design is as per site requirement and as per relevant IRC codes? YES
36 In case of CD structures which have been proposed for replacement, whether you have ensured that such CDs are beyond repair and hence they need to be replaced? NA
37 Is the provision of Protection work and design is as per site requirement and as per relevant IRC codes? YES
38 Whether drainage plan attached with the DPR? YES
39 Whether Road Safety Audit (RSA) report irrespective of length of road attached and uploaded on OMMAS ? NA
40 Is the provision of road safety furniture proposed as per RSA and site requirement? NA
41 Is the road safety furniture items (Retroreflective road signs, thermoplastic reflective paint for road markings, Advance warning signs, Traffic calming measures, Crash barriers, hazard markers and parapets on bridges, etc.) proposed in DPR marked in the road plan YES
42 Is the use of local materials proposed as per IRC accreditation? YES
43 Whether any New technology has been proposed ? YES
a If yes, whether the site jointly inspected by PIU, DPR consultant (technology provider) and STA regarding selection of technology ? If yes, date on which site inspection was made. YES Date:
b If proposed, whether the requisite test results and other data is attached with the DPR ? NA
c Whether the comparative statement using conventional method and new technology is attached with the DPR ? NA
44 Whether the details of Higher Specification considered over & above admissible guidelines added under 19 (g) of Proforma C (Part-1) and detailed calculation of the same attached with the DPR ? NO
45 Whether the cost considered under 19 (g) of Proforma C (Part-1) uploaded under "Higher Specification" cost on OMMAS? NA
46 Whether Format F-9A and F-9B duly signed by Head of PIU are attached with the DPR ? YES
47 Whether the head of PIU inspected the site? If yes, date on which site inspection was made YES 03-15-25
48 If yes, are you satisfied with the provisions made in the DPR as per site requirement and duly following guidelines/ IRC Codes ? YES
Total cost of construction after scrutiny by PIU/Circle-Office and before scrutiny at STA (I/C of GST) in Lakhs 484.73
Total Average cost/ km ( in Lakhs) 88.13
a Average Pavement cost/ km ( in Lakhs) 57.85
b Average CD Structures cost/ km ( in Lakhs) 17.22
c Average Other cost/ km ( in Lakhs) 0.00
Describe how the proposal meets PMGSY-III objectives (Maximum 100 words)
Signature of PIU Head
Note: Part-2 of Proforma C to be filled personally by concerned PIU Head
Proforma C (2021)- Part-3
PRADHAN MANTRI GRAM SADAK YOJANA (PM-JUGA)
CHECKLIST FOR STA (To be filled handwritten by STA)
NAME OF STA :- GURU GHASIDAS VISHWAVIDYALAYA, BILASPUR (C.G.)
NAME OF ROAD :-NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Sl No Items To be filled by STA (Yes/No) Reference wherever applicable (Page no. in the DPR)
1 Whether the Certificate of Census 2011 attached with DPR ? -
1 Is the Part -I and Part-2 of Proforma C completely filled with signature? (Scrutiny by STA should only be done after it is completely filled and duly signed by the PIU officials) YES
If "Yes"- are you satisfied with overall entries made by PIU? YES
2 Whether clear coloured & geotagged photographs at 100m interval depicting road pavement condition are attached ? YES
3 Have you satisfied yourself that the proposed road is part of Candidate roads and approved CNCPL? (Approved CNCPL to be attached in DPR) YES
4 Whether the benefited habitations facility report generated from OMMAS attached with the DPR ? YES
Whether the Preliminary DPR Report generated from Gati Shakti attached with the Final DPR ? YES
5 Whether the screenshot of the proposed alignment is attached with the DPR and have you verified the alignment from the GeoSadak and Gati Shakti ? YES
If yes, are you satisfied with the proposed alignment as Through Route/ Major Rural Link providing access to facilities viz. Education/ Hospitals/ Markets etc. to rural population as per the objectives of PMGSY-IV? YES
6 Have you verified the Format F-9A and F-9B duly signed by Head of PIU are attached with the DPR ? YES
7 Is the raising of the embankment required as per the site conditions? YES
8 Is any discrepancies/ abnormalities found in the soil test reports attached with the DPR? (if yes, STA can re-verify again from the STA laboratory). Are all the four requisite test results on subgrade soil (Gradation, plasticity limits, compaction and CBR) reported in DPR? YES
9 Whether stabilisation of subgrade proposed in case subgrade CBR is less than 5% for pavement widening portion or for new pavement construction? NA
10 Are you satisfied with the type of stabilization proposed and its test results attached with the DPR ? NA
11 If stabilization is not proposed for the subgrade CBR less than 5, are you satisfied with the reasons provided by the PIU ? NA
12 Whether 3 days/ 7 days traffic survey details attached with the DPR ? YES
13 Have you analysed the ATCC report and Axle load test data and yourself satisfied with the design traffic recommended for the projected traffic more than 1 MSA as per guidelines/ as per latest circular? NA
14 Whether proposed road pavement has been divided into different sections (chainage starting from and chainage up to)? YES
If not, are you satisfied detailed reasons indicated in the DPR? YES
15 Only for PMGSY (Stage -I) sanctioned road YES
Whether the km wise existing crust details (layer thickness) properly entered in Part-1 of Proforma C? YES
Whether the proper weightage is given for the existing crust thickness during overlay design? YES
Whether overlay thickness is as per Clause 2.2.3 of IRC SP: 72-2015 based on traffic category? YES
16 If bituminous macadam usage is proposed, whether the design traffic is of T9 category as per IRC SP:72 - 2015. YES
17 Is hard shoulder proposed is as per IRC SP:72:2015 ? NO
18 Whether the road has Geometrics as per Rural Roads Manual (RRM) / Latest Circulars of NRIDA? YES
19 Whether the radius of the curves provided are adequate for design speed on rural roads? YES
If not, are you satisfied with the precautions taken and included in the DPR? YES
20 Is L and X section drawings, Junction design drawings attached ? YES
21 Is location of CDs, drains and Protections marked in L and X section drawings ? YES
22 Is Traffic Signs and Road Marking Plan attached with DPR ? YES
23 Are you satisfied with the location and type of CDs proposed as per photographs and Hydraulic calculations ? YES
24 Are you satisfied with the location and type of Protection work proposed as per photographs and site requirement? YES
25 Whether Road Safety Audit Report irrespective of length of roadattached and uploaded on OMMAS ? NA
26 Whether the road safety provisions in the DPR are as per RSA report? NA
27 Have you verified and satisfied yourself regarding the provisions in the DPR such as junction improvements, requirement of major CDs structures, pucca drains in habitation area, etc. from the satellite imagery of the proposal in GeoSadak and Gati Shakti ? YES
28 Whether any New technology has been proposed ? YES
a If yes, whether the site jointly inspected by PIU, DPR consultant (technology provider) and STA regarding selection of new technology ? YES
b If proposed, whether the requisite test results and other data is attached with the DPR ? -
c Whether the requisite pavement design based on Mix design/ test results attached in the DPR? -
d Whether the comparative statement using conventional method and new technology is attached with the DPR ? -
29 Whether the details of Higher Specification considered over & above admissible guidelines added under 19 (g) of Proforma C (Part-1) and detailed calculation of the same attached with the DPR ? NA
30 Whether the cost considered under 19 (g) of Proforma C (Part-1) uploaded under "Higher Specification" cost on OMMAS? NA
31 Are you satisfied with the provisions made in the DPR as per site requirements and duly following guidelines/ IRC Codes ? YES
32 Is the Part-1 of Proforma C- "Final Proposal Details" properly/ completely filled with signatures after scrutiny at STA? YES
Total cost of construction after scrutiny by STA (Should match with Total Cost at Part-1 (I/C of GST)) in Lakhs 484.73
Total Average cost/ km ( in Lakhs) 88.13
a Average Pavement cost/ km ( in Lakhs) 57.85
b Average CD Structures cost/ km ( in Lakhs) 17.22
c Average Other cost/ km ( in Lakhs) 0.00
Specific Remarks, if any, by STA
Signature of STA Member Signature of STA Coordinator
Designation Designation
Note: Part-3 of Proforma C to be filled personally by concerned STA member responsible for scrutiny of DPR
Is the Part-1and Part-II of Proforma C- "Final Proposal Details" corrected based on the observations of STA?
Community Consultation Checklist – Engineering
Sl No Items YES NO N/A
1 Has the PIU conducted a survey using the GSS app? YES
2 Has the feedback from the SC/ST population been taken into consideration during the survey conducted through the GSS app by the PIU? YES
3 Are there any flood prone areas on the road? NO
1.1 Are locations specified and inspected? NA
1.2 Is high flood level specified for each stretch? NA
1.3 Are locations specified and inspected? NA
4 Are there any locations on the road where irrigations ducts need to be provided? NO
2.1 Are locations specified and inspected? NA
5 Can the road be used as a shortcut by through traffic? YES
6 Does the road lead to any quarries, mining areas, brick kilns, logging areas, tourist attractions etc.? NO
7 Are there plans to build new schools, hospitals, temples etc YES
8 Is there potential for double connectivity? NA
If yes on any of 3-6:
6.1 Is information on location, size and nature of additional traffic generators and specific routes obtained? generators and specific routes obtained? NA
9 Is there a need for deviations from existing track? NO
7.1 Were the proposals for deviation shown on site and explained to the community? NA
7.2 Is the land availability checked? YES
7.3 If there is a need for donation, were the owners consulted regarding their agreement to donate the land? NA
10 Is there a need for speed breakers? YES
8.1 Is location and rational for speed breakers identified? YES
8.2 Is rationale verified and checked on site? YES
8.3 Are alternative or additional locations discussed? NA
11 Are all existing intersections checked with the community on site?
9.1 Is the use of intersecting roads identified (e.g. school children, farm machinery, etc)? YES
12 Are proposed culvert locations verified with the community? YES
10.1 Is there a need for additional culverts? NO
10.2 If yes, are locations identified? NA
For DPR consultant For PIU For PIC
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-1
NAME OF ROAD :-NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA SUMMARY SHEET
Name of the Block TOTAL No. OF HABITATIONS Unconnected Habitation / VILLAGES
Gram Panchayat -
BASTAR DISTRICT BASTAR
Type of Proposal No. of Road Total length of road (KM.) No. of New CD Structures Improvement Of CD Estimated Cost (Rs. in LAKHS) No. of Unconnected Habitation Connected / Connected Habitation Benefited
Pavement from format F-2A CD Structure from format F-2B Other TOTAL [(5) + (6)] Main!A1
Cost of Pavement Per KM = 70.91 Lacs
Cost of CD Per KM = 6.27 Lacs
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-2A
ROADS PROPOSED IN PMGSY FOR RURAL CONNECTIVITY (PAVEMENT LAYERS)
DISTRICT : BASTAR BLOCK: BASTAR CG -
S.No. Name of Habitation Connected/Benifited New Connectivity (N)/ Upgradation (U) Facility Accessed (A/B/C/D) Road Length (KM.) Existing surface type DETAILS OF THICKNESS & COST FOR PAVEMENT ( RS. IN LACS)
FROM TO Details Setting Out, Dismantling, C & G EARTH-WORK SUB-BASE (GSB) WBM-I WMM WBM-III SHOULDER CC DRAIN PRIME COAT & TACK COAT C.C. ROAD MISC. ITEMS INC ROAD FURNITURE TOTAL COST OF PAVEMENT [SUM OF (10) TO (22)]
N/U BM OGPC (WASTE PLASTIC) SEAL COAT PROTECTION WORK
1 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA BADE BADRENGA N D 5.500 EARTHEN ROAD Thickness - - 150 MM - 150 MM 150 MM 100 MM - - - 20 MM - - - -
Use A - Market, B - Educational Facility, C - Health & D - Combination of all.
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA Format F-2B
ROADS PROPOSED IN PMGSY FOR RURAL CONNECTIVITY (CROSS DRAINAGE STRUCTURES)
DISTRICT: BASTAR BLOCK BASTAR GRAM PANCHAYAT. :- -
S.No. Name of Road NEW CONST./ UPGRADATION Road length (Km.) EXISTING CD STRUCTURE BY TYPE DETAILS OF PROPOSED CD STRUCTURE BY TYPE TOTAL COST OF PROPOSED CD STRUCTURES TOTAL COST OF PAVEMENT FROM FORMAT F-2B TOTAL COST OF THE ROAD [(26) + (27)]
HUME PIPE CULVERT/SLAB CULVERT BOX / ARCH/ SLAB CULVERT MINOR BRIDGE/ CAUSE WAYS HUME PIPE CULVERT BOX / ARCH CULVERT VENTED CAUSE WAY SLAB CULVERT
No. TYPE No. Length No. Length 1 ROW HP 1000 mm f 1 ROW HP 1000mm f (2x2) 2 Unit (2X2)3 Unit 3 ROW VCW 15 Row VCW 1.50 m Span Slab Cul 3.0 m Span Slab Cul 6.0 m Span Slab Cul 6.0X2.0m Span Slab Cul Field Crossing Field Crossing CC Portion Dismentling Improvement M!A1
1 NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA NEW CONST. 5.500 10 HPC 13 82.3 _ _ Prop. Nos. 10 1 _ _ _ _ 2 0 0 0 10 4 - - CD!A1
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
NAME OF ROAD:- Jhiram Via Alengnar Urkapal To Kandanar Road
BT Road (Existing BT Proposed) At KM 0.00 to 5.55 = 5.55 KM
ITEMS WIDTH THICKNESS
SUB GRADE … 0.000
Engineer Sub Engineer Assistant Engineer Executive Engineer
VSR CONSTRACTION PIU CGRRDA PIU CGRRDA PIU CGRRDA
Sukma Sukma Sukma Sukma
NAME OF ROAD:- Jhiram Via Alengnar Urkapal To Kandanar Road
BT Road (Profile Correction & Strengthening) At KM 5.55 to 7.55 = 2.00 KM
ITEMS WIDTH THICKNESS
SUB GRADE … 0.000
Engineer Sub Engineer Assistant Engineer Executive Engineer
VSR CONSTRACTION PIU CGRRDA PIU CGRRDA PIU CGRRDA
Sukma Sukma Sukma Sukma
NAME OF ROAD :-BHAURAHI DEVALAY TO SHIVPUR VIYA GANGOTI
CC PAVEMENT (New Proposed)
ITEMS WIDTH THICKNESS
PANAL CONCRETE 3.75 0.100
DPR Consultant Sub Engineer PIU,CGRRDA, SURAJPUR Assistant Engineer PIU,CGRRDA, SURAJPUR EXECUTIVE ENGINEER PIU,CGRRDA, SURAJPUR
NAME OF ROAD :-NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Details of typical cross section of Flexible pavement [Details to be provided by the State] FORMAT F-3A
ITEMS WIDTH THICKNESS
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
NAME OF ROAD:- Jhiram Via Alengnar Urkapal To Kandanar Road
BT Road (Existing BT Proposed) At KM 0.00 to 5.55 = 5.55 KM
ITEMS WIDTH THICKNESS
SUB GRADE … 0.000
Engineer Sub Engineer Assistant Engineer Executive Engineer
VSR CONSTRACTION PIU CGRRDA PIU CGRRDA PIU CGRRDA
Sukma Sukma Sukma Sukma
NAME OF ROAD:- Jhiram Via Alengnar Urkapal To Kandanar Road
BT Road (Profile Correction & Strengthening) At KM 5.55 to 7.55 = 2.00 KM
ITEMS WIDTH THICKNESS
SUB GRADE … 0.000
Engineer Sub Engineer Assistant Engineer Executive Engineer
VSR CONSTRACTION PIU CGRRDA PIU CGRRDA PIU CGRRDA
Sukma Sukma Sukma Sukma
NAME OF ROAD :-NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Details of proposed typical Cross Sections of Rigid Pavement [Details to be provided by the State] FORMAT 3-B
ITEMS WIDTH THICKNESS
PANAL CONCRETE 3.75 0.100
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
NAME OF ROAD :-BHAURAHI DEVALAY TO SHIVPUR VIYA GANGOTI
Details of typical cross section of Flexible pavement [Details to be provided by the State] FORMAT F-3A
ITEMS WIDTH THICKNESS
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
Mantri Gram Sadak Yojana (PMGSY) FORMAT-4
DETAILS OF EXISTING ROADS(FOR UPGRADATION)
PACKAGE NO____________________
DISTRICT BASTAR
BLOCK(S) BASTAR
Sl.no. Name of the road road length (in km) Road connecting to facilities accessed(useA/B/c/d) Traffic per day Existing road Details
Total motorised LCV/Truck/Bus/Agricultural tractor/trailer Land Width(m) Road Width(m) Embankment WBM layer Bituminous layer
Height(m) Width(m) Width(m) Thickness(mm) type**** Width(m) Thickness(mm)
NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA 5.500 D 568 54 9 7.5 0.2 TO 0.4 3-5
Use A - Market, B - Educational Facility, C - Health & D - Combination of all.
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
Mantri Gram Sadak Yojana (PMGSY) FORMAT-5
Association of Routes
Name of Road Primary network SC Population % of SC Population with respect to Total Population ST population % of ST Population with respect to Total Population Other than SC/ST Population Total Population
Package No Habitation Name
NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA - Bade Badrenga 122 100% 0 0% 0.00% 122
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-6
COST ESTIMATE FOR ROAD CONSTRUCTION FOR FLEXIBLE PAVEMENT
Road from :- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block : BASTAR
Length of the Road (Kms) : 5.5 Km Distt : BASTAR
Sr. No. SOR Item No. DESCRIPTION OF ITEMS Nos L(m) B(m) D(m) QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
CUTTING OF TREES,CLEARING GRASS,CLEARING & GRUBBING & DISMANTLING
1 2.1 Setting Out
Setting Out work complete with construction of bench mark (Min 1 per km) working benchmark (Min 4 per km) and near all bridges and cross-drainage works made of bricks/stone masonary or concrete and reference pillars made of precast concrete poles/concrete filled 100 mm dia A.C.pipe @ 100 m interval of as required on both sides of the formation width, marking on central line, setting out curves and recording of central line levels and other required levels and distances etc. including setting out of cross-drainage structures & bridges with required reference pillars and marking etc. as directed by Engineer-in-Charge. 5500.00 5.500
2 2.2 Clearing Grass and Removal of Rubbish
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means 2 5500.00 1.800 19800.000 Sqm 0.00 0.00 7.2
2 2.3 Clearing and Grubbing Road Land
3 2.4 Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps 48.75
Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. (Lead upto 1000 m)
i) Girth above 300 mm to 600 mm 0 0.000 Each. 350.00 0.00
ii) Girth above 600 mm to 900 mm 0 0.000 Each. 605.00 0.00
iii) Girth above 900 mm to 1800 mm 0 0.000 Each. 1201.00 0.00
4 3.1 Scarifying existing granular/bituminous surface
Scarifying existing granular/bituminous surface upto a depth of 100 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Sub Total Cutting of trees,Clearing Grass,Clearing & Grubbing & Dismantling Flexible Pavement: - 384719.50
5 3.2 Compacting Original Ground / Existing Embankment
Loosening, Levelling and Compacting original ground/existing embankment/supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. 1 4300.00 6.00 0.150 3870.00 Cum 25.00 96750.00 198917.06
6 3.8 (i) Surface Drains in Soil
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with all lift and lead of 50 m as per Technical Specification Clause 307.
7 3.5 (ii) Excavation in Cutting in Soil by manual means
Excavation in Soil by manual/Machinery means and Tippers with disposal upto 1000 m Excavation for roadwork in soil with manual/Machinery including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 46.05 46.05 Cum. 85.00 3914.25
10 3.9 Excavation in ordinary rock
8 Excavation in ordinary rock including loading in a truck and carrying of excavated material to embankment site with all lift and lead upto 50 m as per Technical Specification Clause 302.3.5. 0.00 0.00 Cum. 287.00 0.00
11 3.10.II Excavation in hard rock
Excavation for roadway in hard rock (blasting prohibited) including breaking rock, loading in tippers and disposal with all lift and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections including stacking of excavated rock as per Technical Specification Clause 302.3.5 Earth Work Summary Sheet (B) 0.00 0.00 Cum. 1177.00 0.00
12 3.3 (I) Construction of Embankment with Material Obtained from Roadway Cutting
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 1559.568 1559.568 Cum. 63.00 98252.81
13 3.4 (I) Construction of Embankment with Material Obtained from Pits
Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with all leads as per Technical Specification Clause 301.5(Having CBR not less than 5) using vibratory roller. 15292.669 15292.669 Cum. 222.00 3394972.54
14 3.12 (A) Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material (Granular material having CBR not less than 7) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.For Item No.3.12(a) & (b)
Earthen Shoulder for BT Portion Besides WBM RD-0-300,700-4700,-,-M 2 4300.000 2.215 0.000 0.00
Earthen Shoulder Besides GSB 2 4300.000 2.215 0.150 2857.35
For approach road 2 600.000 2.215 0.150 398.70
Deduction for Culverts 5 5.40 2.215 0.150 -8.971
Sub Total Earthwork: - 4256928.82
15 4.1 (a) Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III)
Add Extra for widening at Curves 1 249.94 0.60 0.150 22.49
Bell mouth entry provided at start point and at other approch / junction. 12 202.43 0.150 364.37
Deduction for Culverts 5 5.40 4.050 0.150 -16.403
16 4.8 Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
Add Extra for widening at Curves 1 249.94 0.60 0.150 22.49
Bell mouth entry provided at start point and at other approch / junction. 12 202.43 0.150 364.37
Deduction for Culverts 5 5.40 3.850 0.150 -15.593
Sub Total GSB, WMM : - 7188052.05
17 3.12 (B) Construction of subgrade and earthen shoulders
Construction of sub-grade and earthen shoulders with approved material (Granular material having CBR not less than 10) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.(To be used for side shoulder WBM)
---------------------------------------------------------------------------- Bell mouth entry provided at start point and at other approch / junction. 12 202.43 218.624
Deduction for Culverts 5 5.40 2.045 0.170 -1.877
18 7.10 Providing concrete
Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
II P.C.C grade M 15(Nominal mix (1:2.5:5)
Sub Total Shoulder : - 715057.77
19 5.1 Prime Coat (Low Porosity)
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 1 4300.00 3.750 16125.00
Add Extra for widening at Curves 1 249.94 0.60 149.97
Bell mouth entry provided at start point and at other approch / junction. 12 202.43 2429.16
20 5.2 (iii) Tack Coat
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
Add Extra for widening at Curves 1 249.94 0.60 149.97
Bell mouth entry provided at start point and at other approch / junction. 12 202.43 2429.16
21 5.13 20mm thick Open-Graded Premix Carpet using Bituminous Binder Mixing with processed Waste plastic (as per IRC:SP:98-2013) by replacement of 8% Bitumen binder by weight.
Providing, laying and rolling of 20mm thick open-graded premix carpet (Thickness not less than 20 mm at any place) composed of 13.2 mm graded aggregate size @ 0.18 cum per 10 sqm & 11.2 mm graded aggregate size @ 0.09 cum per 10 sqm using with bitumenous binder @13.43Kg per 10 sqm (i.e. 92% of standard Bitumen and 8% waste processed plastic by weight shall be used for coating aggregate after its heating) as per IRC:SP:98-2013, laying to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 to be followed by seal coat of either Type A , Type B or Type C as per Technical Specification.
Add Extra for widening at Curves 1 249.94 0.60 149.97
Bell mouth entry provided at start point and at other approch / junction. 12 202.43 2429.16
22 5.5 Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510, Viscocity grade (VG) Bitumen specification as per IS 73:2006
Add Extra for widening at Curves 1 249.94 0.60 149.97
Bell mouth entry provided at start point and at other approch / junction. 12 202.43 2429.16
Sub Total Bitumen Work: - 5854391.46
SAY 217.11 LACS. #VALUE!
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
Flexible pavement 183.99
Rigid pavement 0.000
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-6
COST ESTIMATE FOR ROAD CONSTRUCTION FOR FLEXIBLE PAVEMENT
Road from :- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block : BASTAR
Length of the Road (Kms) : 5.5 Km Distt : BASTAR
Sr. No. SOR Item No. DESCRIPTION OF ITEMS Nos L(m) B(m) D(m) QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
CUTTING OF TREES,CLEARING GRASS,CLEARING & GRUBBING & DISMANTLING
1 2.1 Setting Out
Setting Out work complete with construction of bench mark (Min 1 per km) working benchmark (Min 4 per km) and near all bridges and cross-drainage works made of bricks/stone masonary or concrete and reference pillars made of precast concrete poles/concrete filled 100 mm dia A.C.pipe @ 100 m interval of as required on both sides of the formation width, marking on central line, setting out curves and recording of central line levels and other required levels and distances etc. including setting out of cross-drainage structures & bridges with required reference pillars and marking etc. as directed by Engineer-in-Charge. 5500.00 5.500
2 2.2 Clearing Grass and Removal of Rubbish
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means 2 5500.00 1.800 19800.000 Sqm 0.00 0.00 7.2
2 2.3 Clearing and Grubbing Road Land
3 2.4 Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps 48.75
Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. (Lead upto 1000 m)
i) Girth above 300 mm to 600 mm 0 0.000 Each. 350.00 0.00
ii) Girth above 600 mm to 900 mm 0 0.000 Each. 605.00 0.00
iii) Girth above 900 mm to 1800 mm 0 0.000 Each. 1201.00 0.00
4 3.1 Scarifying existing granular/bituminous surface
Scarifying existing granular/bituminous surface upto a depth of 100 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Sub Total Cutting of trees,Clearing Grass,Clearing & Grubbing & Dismantling Flexible Pavement: - 384719.50
5 3.2 Compacting Original Ground / Existing Embankment
Loosening, Levelling and Compacting original ground/existing embankment/supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. 1 4300.00 6.00 0.150 3870.00 Cum 25.00 96750.00 198917.06
6 3.8 (i) Surface Drains in Soil
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with all lift and lead of 50 m as per Technical Specification Clause 307.
7 3.5 (ii) Excavation in Cutting in Soil by manual means
Excavation in Soil by manual/Machinery means and Tippers with disposal upto 1000 m Excavation for roadwork in soil with manual/Machinery including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 46.05 46.05 Cum. 85.00 3914.25
10 3.9 Excavation in ordinary rock
8 Excavation in ordinary rock including loading in a truck and carrying of excavated material to embankment site with all lift and lead upto 50 m as per Technical Specification Clause 302.3.5. 0.00 0.00 Cum. 287.00 0.00
11 3.10.II Excavation in hard rock
Excavation for roadway in hard rock (blasting prohibited) including breaking rock, loading in tippers and disposal with all lift and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections including stacking of excavated rock as per Technical Specification Clause 302.3.5 Earth Work Summary Sheet (B) 0.00 0.00 Cum. 1177.00 0.00
12 3.3 (I) Construction of Embankment with Material Obtained from Roadway Cutting
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 1559.568 1559.568 Cum. 63.00 98252.81
13 3.4 (I) Construction of Embankment with Material Obtained from Pits
Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with all leads as per Technical Specification Clause 301.5(Having CBR not less than 5) using vibratory roller. 15292.669 15292.669 Cum. 222.00 3394972.54
14 3.12 (A) Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material (Granular material having CBR not less than 7) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.For Item No.3.12(a) & (b)
Earthen Shoulder for BT Portion Besides WBM RD-0-300,700-4700,-,-M 2 4300.000 2.215 0.000 0.00
Earthen Shoulder Besides GSB 2 4300.000 2.215 0.150 2857.35
For approach road 2 600.000 2.215 0.150 398.70
Deduction for Culverts 5 5.40 2.215 0.150 -8.971
Sub Total Earthwork: - 4256928.82
15 4.1 (a) Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III)
Add Extra for widening at Curves 1 249.94 0.60 0.150 22.49
Bell mouth entry provided at start point and at other approch / junction. 12 202.43 0.150 364.37
Deduction for Culverts 5 5.40 4.050 0.150 -16.403
16 4.8 Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
Add Extra for widening at Curves 1 249.94 0.60 0.150 22.49
Bell mouth entry provided at start point and at other approch / junction. 12 202.43 0.150 364.37
Deduction for Culverts 5 5.40 3.850 0.150 -15.593
Sub Total GSB, WMM : - 7188052.05
17 3.12 (B) Construction of subgrade and earthen shoulders
Construction of sub-grade and earthen shoulders with approved material (Granular material having CBR not less than 10) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.(To be used for side shoulder WBM)
---------------------------------------------------------------------------- Bell mouth entry provided at start point and at other approch / junction. 12 202.43 218.624
Deduction for Culverts 5 5.40 2.045 0.170 -1.877
18 7.10 Providing concrete
Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
II P.C.C grade M 15(Nominal mix (1:2.5:5)
Sub Total Shoulder : - 715057.77
19 5.1 Prime Coat (Low Porosity)
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 1 4300.00 3.750 16125.00
Add Extra for widening at Curves 1 249.94 0.60 149.97
Bell mouth entry provided at start point and at other approch / junction. 12 202.43 2429.16
20 5.2 (iii) Tack Coat
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
Add Extra for widening at Curves 1 249.94 0.60 149.97
Bell mouth entry provided at start point and at other approch / junction. 12 202.43 2429.16
21 5.13 20mm thick Open-Graded Premix Carpet using Bituminous Binder Mixing with processed Waste plastic (as per IRC:SP:98-2013) by replacement of 8% Bitumen binder by weight.
Providing, laying and rolling of 20mm thick open-graded premix carpet (Thickness not less than 20 mm at any place) composed of 13.2 mm graded aggregate size @ 0.18 cum per 10 sqm & 11.2 mm graded aggregate size @ 0.09 cum per 10 sqm using with bitumenous binder @13.43Kg per 10 sqm (i.e. 92% of standard Bitumen and 8% waste processed plastic by weight shall be used for coating aggregate after its heating) as per IRC:SP:98-2013, laying to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 to be followed by seal coat of either Type A , Type B or Type C as per Technical Specification.
Add Extra for widening at Curves 1 249.94 0.60 149.97
Bell mouth entry provided at start point and at other approch / junction. 12 202.43 2429.16
22 5.5 Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510, Viscocity grade (VG) Bitumen specification as per IS 73:2006
Add Extra for widening at Curves 1 249.94 0.60 149.97
Bell mouth entry provided at start point and at other approch / junction. 12 202.43 2429.16
Sub Total Bitumen Work: - 5854391.46
SAY 217.11 LACS. #VALUE!
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
Flexible pavement 183.99
Rigid pavement 0.000
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-6
COST ESTIMATE FOR ROAD CONSTRUCTION FOR RIGID PAVEMENT
Road from :- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block : BASTAR
Length of the Road (Kms) : 5.5 Km Distt : BASTAR
Sr. No. SOR Item No. DESCRIPTION OF ITEMS Nos L(m) B(m) D(m) QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
1 2.11 Dismantling of Cement Concrete Pavements
Dismantling of cement concrete pavements and breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately, as per Technical Specification Clause. 202
2 3.5 (ii) Excavation in Cutting in Soil by manual means
Excavation in Soil by manual/Machinery means and Tippers with disposal upto 1000 m Excavation for roadwork in soil with manual/Machinery including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Excavation In Widening portion of Existing CC Road
3 3.12 (A) Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material (Granular material having CBR not less than 7) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.For Item No.3.12(a) & (b)
Deduction for rapta 2 700.000 2.025 0.150 425.25
4 4.1 (a) Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III)
Deduction for rapta 1 700.00 4.050 0.100 283.50
5 4.8 Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
Deduction for rapta 1 700.00 3.850 0.100 269.50
6 3.12 (B) Construction of subgrade and earthen shoulders
Construction of sub-grade and earthen shoulders with approved material (Granular material having CBR not less than 10) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.(To be used for side shoulder WBM)
Deduction for rapta 2 700.00 2.325 0.150 488.250
7 7.10 Providing concrete
Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
II P.C.C grade M 15(Nominal mix (1:2.5:5)
Ex. CC Leveling Course RD--,-,-,-M 1 0.00 3.750 0.0375 0.00
Ex. CC Leveling Course RD-1100-1300,-,-,-M 1 200.00 3.000 0.0375 22.50
For Widening of Ex. CC 1 200.00 0.375 0.200 15.00
8 6.1 Cement Concrete Pavement
(ii) Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including eveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
9 6.8 Construction of Panel concrete
Construction of Panel concrete, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed a in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibratos and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, admixture as approved, curing of concrete slabs for 14 days. Curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification Clause 1501. PCC Grade M-30 Each Panel (0.5 m x0.5m to 1.00m x 1.00m) thickness 100 mm.
SAY 101.08 LACS. #VALUE!
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
Rigid pavement 111.343 94.359 111.343
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-6
COST ESTIMATE FOR ROAD CONSTRUCTION FOR RIGID PAVEMENT
Road from :- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block : BASTAR
Length of the Road (Kms) : 5.5 Km Distt : BASTAR
Sr. No. SOR Item No. DESCRIPTION OF ITEMS Nos L(m) B(m) D(m) QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
1 2.11 Dismantling of Cement Concrete Pavements
Dismantling of cement concrete pavements and breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately, as per Technical Specification Clause. 202
2 3.5 (ii) Excavation in Cutting in Soil by manual means
Excavation in Soil by manual/Machinery means and Tippers with disposal upto 1000 m Excavation for roadwork in soil with manual/Machinery including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Excavation In Widening portion of Existing CC Road
3 3.12 (A) Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material (Granular material having CBR not less than 7) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.For Item No.3.12(a) & (b)
Deduction for rapta 2 700.000 2.025 0.150 425.25
4 4.1 (a) Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III)
Deduction for rapta 1 700.00 4.050 0.100 283.50
5 4.8 Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
Deduction for rapta 1 700.00 3.850 0.100 269.50
6 3.12 (B) Construction of subgrade and earthen shoulders
Construction of sub-grade and earthen shoulders with approved material (Granular material having CBR not less than 10) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.(To be used for side shoulder WBM)
Deduction for rapta 2 700.00 2.325 0.150 488.250
7 7.10 Providing concrete
Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
II P.C.C grade M 15(Nominal mix (1:2.5:5)
Ex. CC Leveling Course RD--,-,-,-M 1 0.00 3.750 0.0375 0.00
Ex. CC Leveling Course RD-1100-1300,-,-,-M 1 200.00 3.000 0.0375 22.50
For Widening of Ex. CC 1 200.00 0.375 0.200 15.00
8 6.1 Cement Concrete Pavement
(ii) Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including eveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
9 6.8 Construction of Panel concrete
Construction of Panel concrete, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed a in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibratos and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, admixture as approved, curing of concrete slabs for 14 days. Curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification Clause 1501. PCC Grade M-30 Each Panel (0.5 m x0.5m to 1.00m x 1.00m) thickness 100 mm.
SAY 101.08 LACS. #VALUE!
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
Rigid pavement 111.343 94.359 111.343
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-6
Road from :- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block : BASTAR
Length of the Road (Kms) :- 5.5 Km Distt : BASTAR
ESTIMATE OF PCC DRAIN
S.No. SOR No. DESCRIPTION OF ITEMS Nos L(m) B(m) D(m) QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
1 3.5 (i) Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3" M!B47
1 6.6 Construction of RCC open drain 0.60 m x 0.60 m inside dimension lined with 120 mm thick RCC M-20 walls, 120 mm thick CC M-20 foundation, over 100 mm thick (Av) levelling course in PCC M-15 including excavation, dressing of sides and bottom, provision of HYSD reinforcement consisting 8 mm dia horizontal bars @ 150 mm c/c and L-shaped 8 mm dia vertical bars @ 150 mm c/c (L=800 mm) including cutting, bending and binding wire, placing in position, providing shuttering and concreting by using concrete mixer, compaction by vibration etc complete as per drawings and technical specifications.
2 7.27 Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5
I R.C.C. grade M 20 1:2:4
R.C.C. Cover in front of houses (Length/9 M) 49 1.50 0.84 0.10 6.16 Cum 6498.00 40027.68
3 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 (12 MM)
Total:- 1268760
Add 18% GST 228377
Total:- 1497137
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-6
Road from :- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block : BASTAR
Length of the Road (Kms) :- 5.5 Km Distt : BASTAR
ESTIMATE OF PCC DRAIN
S.No. SOR No. DESCRIPTION OF ITEMS Nos L(m) B(m) D(m) QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
1 3.5 (i) Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3" M!B47
1 6.6 Construction of RCC open drain 0.60 m x 0.60 m inside dimension lined with 120 mm thick RCC M-20 walls, 120 mm thick CC M-20 foundation, over 100 mm thick (Av) levelling course in PCC M-15 including excavation, dressing of sides and bottom, provision of HYSD reinforcement consisting 8 mm dia horizontal bars @ 150 mm c/c and L-shaped 8 mm dia vertical bars @ 150 mm c/c (L=800 mm) including cutting, bending and binding wire, placing in position, providing shuttering and concreting by using concrete mixer, compaction by vibration etc complete as per drawings and technical specifications.
2 7.27 Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5
I R.C.C. grade M 20 1:2:4
R.C.C. Cover in front of houses (Length/9 M) 49 1.50 0.84 0.10 6.16 Cum 6498.00 40027.68
3 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 (12 MM)
Total:- 1268760
Add 18% GST 228377
Total:- 1497137
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-6
COST ESTIMATE FOR ROAD CONSTRUCTION FOR ROAD FURNITURE & OTHER WORK
Road from :- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block : BASTAR
Length of the Road (Kms) : 5.5 Km Distt : BASTAR
Sr. No. SOR Item No. DESCRIPTION OF ITEMS Nos L(m) B(m) D(m) QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
PROVISION OF ROAD FURNITURE
1 9.21(B) Retro-Reflective Traffic signs
Direction and place identification signs up to 0.9 Sqm. sisn board Providing and erecting direction and place identification of Retro reflective sheeting classs A/ class B sign boards type IV as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade as per MORI) specifications ofrequired shade and colour. Supported and welded on two nos.47 mm x 47 mm of 12 SWG square tube of 3050 mm height duty strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mmr 600 mm below ground level as per approved drawing and Technical Specification Clause 1701
2 9.16 Providing & Fixing of PMGSY 'Logo' board Providing and fixing of typical PMGSY logo board as per MoRD specifications and drawings. 3 3.00 Each 6626.00 19878.00
3 9.21 (A) A typical design of PMGSY informatory Sign Board is shown in fig. 12ffi.1 The specification and installation details ofthe typical sign board are given below:
(i) The board will be a composite unit consisting of three plates of Alumininm Composite Materials (ACM), material specifications are per Clause 1701.3.7The top most plate will be in diamond shape of 600 mn x 600 mm sizr, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size on back on edges. The middle plate will be 1200 mm 150 mm size riveted over welded rvr.s. angle iron frame of 25 mm x 25 nm x 5 mm size on back on edges. The main Iower most plate wiII be 1500 mn x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG ) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate wilt be flushed with the top of 75 nm dia medium steel tube posts and these posts will be embedded in cement concrete M 15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower nost plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders etc. of middle and bottom plate, pMGSy logo on top plates shall be as per clause 1701.4.6 messages/Borders. All the section of frame and posts will be painted with primer and two coats of Epoxy paint The steel tube below ground level will be painted with three coats of Epoxy paint The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sing in a contrasting colour or by stamping in characters not exceeding 50 mm in height 1 1.00 Nos. 17699.00 17699.00 sill
4 9.15 (A) Providing and fixing 'Citizen Information Board' of PMGSY Project (A) Providing and fixing of typical " PMGSY Citizen Information Board" with Logo as per MoRD specifications & drawings, made of 75 mm square or 75 mm dia circular steel tube of 12 SWG 3.2 m height and cross member 2 nos 1m long, fixed with angle iron 50x50x5 mm MS angle on the back 1 1.00 Each 14010.00 14010.00
TOTAL 132634.12
5 9.8 Kilometre Stones & Boundary Pillar
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(i) 5th Kilometre Stone (precast) 1 1.00 Each 3947.00 3947.00
(ii) Ordinary Kilometer Stone (Precast) 7 7.00 Each 2292.00 16044.00
(iii) 200 m stone (precast) 22 22.00 Each 660.00 14520.00
7 9.17 Guard Stone Reinforced cement concrete M15 grade Guard Stone of size 200 mm x 200mm x 800 mm fixing in position including painting and printing etc. as per drawing, Technical Specification and as per direction of Engineer in Charge. 100 100.00 Each 525.00 52500.00 138
MISCELLANEOUS ITEM
8 9.18 Road marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes.)
Pedestrian 20% 172.00
9 9.19 Speed Braker For 7.50 M Formation Width
(A) Providing and laying rounded hump type of Speed Breaker confirming to IRC – 99 and as per guidelines and drawings of NRRDA circular no. DO No. P-17019/6/2006/PII Dated 16 Sept 2009, including providing, laying and compaction of GSB, G II, G III, OGPC, Seal Coat Type B, as per specifications and appended drawing on both the sides of carriage way up to formation width maintaining rounded hump type shape with bituminous mix material i/c providing and painting of black and white strips, providing and fixing of two no. 600mm equilateral semi reflecting sign boards, i/c cost of all materials, labour T & P & Machinery etc complete and as 0 0.000 Each 22547.00 0.000
10 10.11 Consultancy charges for survey & preparetion of DPR 1 5500.00 0.00 Km 24700.00 0.00 3476.00
SAY 10.23 LACS. #VALUE!
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
Flexible pavement #REF! 8.67 #REF!
Rigid pavement #REF! #REF! #REF!
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-6
COST ESTIMATE FOR ROAD CONSTRUCTION FOR ROAD FURNITURE & OTHER WORK
Road from :- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block : BASTAR
Length of the Road (Kms) : 5.5 Km Distt : BASTAR
Sr. No. SOR Item No. DESCRIPTION OF ITEMS Nos L(m) B(m) D(m) QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
PROVISION OF ROAD FURNITURE
1 9.21(B) Retro-Reflective Traffic signs
Direction and place identification signs up to 0.9 Sqm. sisn board Providing and erecting direction and place identification of Retro reflective sheeting classs A/ class B sign boards type IV as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade as per MORI) specifications ofrequired shade and colour. Supported and welded on two nos.47 mm x 47 mm of 12 SWG square tube of 3050 mm height duty strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mmr 600 mm below ground level as per approved drawing and Technical Specification Clause 1701
2 9.16 Providing & Fixing of PMGSY 'Logo' board Providing and fixing of typical PMGSY logo board as per MoRD specifications and drawings. 3 3.00 Each 6626.00 19878.00
3 9.21 (A) A typical design of PMGSY informatory Sign Board is shown in fig. 12ffi.1 The specification and installation details ofthe typical sign board are given below:
(i) The board will be a composite unit consisting of three plates of Alumininm Composite Materials (ACM), material specifications are per Clause 1701.3.7The top most plate will be in diamond shape of 600 mn x 600 mm sizr, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size on back on edges. The middle plate will be 1200 mm 150 mm size riveted over welded rvr.s. angle iron frame of 25 mm x 25 nm x 5 mm size on back on edges. The main Iower most plate wiII be 1500 mn x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG ) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate wilt be flushed with the top of 75 nm dia medium steel tube posts and these posts will be embedded in cement concrete M 15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower nost plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders etc. of middle and bottom plate, pMGSy logo on top plates shall be as per clause 1701.4.6 messages/Borders. All the section of frame and posts will be painted with primer and two coats of Epoxy paint The steel tube below ground level will be painted with three coats of Epoxy paint The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sing in a contrasting colour or by stamping in characters not exceeding 50 mm in height 1 1.00 Nos. 17699.00 17699.00 sill
4 9.15 (A) Providing and fixing 'Citizen Information Board' of PMGSY Project (A) Providing and fixing of typical " PMGSY Citizen Information Board" with Logo as per MoRD specifications & drawings, made of 75 mm square or 75 mm dia circular steel tube of 12 SWG 3.2 m height and cross member 2 nos 1m long, fixed with angle iron 50x50x5 mm MS angle on the back 1 1.00 Each 14010.00 14010.00
TOTAL 132634.12
5 9.8 Kilometre Stones & Boundary Pillar
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(i) 5th Kilometre Stone (precast) 1 1.00 Each 3947.00 3947.00
(ii) Ordinary Kilometer Stone (Precast) 7 7.00 Each 2292.00 16044.00
(iii) 200 m stone (precast) 22 22.00 Each 660.00 14520.00
7 9.17 Guard Stone Reinforced cement concrete M15 grade Guard Stone of size 200 mm x 200mm x 800 mm fixing in position including painting and printing etc. as per drawing, Technical Specification and as per direction of Engineer in Charge. 100 100.00 Each 525.00 52500.00 138
MISCELLANEOUS ITEM
8 9.18 Road marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes.)
Pedestrian 20% 172.00
9 9.19 Speed Braker For 7.50 M Formation Width
(A) Providing and laying rounded hump type of Speed Breaker confirming to IRC – 99 and as per guidelines and drawings of NRRDA circular no. DO No. P-17019/6/2006/PII Dated 16 Sept 2009, including providing, laying and compaction of GSB, G II, G III, OGPC, Seal Coat Type B, as per specifications and appended drawing on both the sides of carriage way up to formation width maintaining rounded hump type shape with bituminous mix material i/c providing and painting of black and white strips, providing and fixing of two no. 600mm equilateral semi reflecting sign boards, i/c cost of all materials, labour T & P & Machinery etc complete and as 0 0.000 Each 22547.00 0.000
10 10.11 Consultancy charges for survey & preparetion of DPR 1 5500.00 0.00 Km 24700.00 0.00 3476.00
SAY 10.23 LACS. #VALUE!
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
Flexible pavement #REF! 8.67 #REF!
Rigid pavement #REF! #REF! #REF!
Earth Work Summary
Name of Road: NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block:- BASTAR
Length of Road: 5500.00 M
District:- BASTAR
A. Total Quantity of Earthwork Fill Up to Embankment Page No.- 16852.24 Cu m M!A1 5.5 26129.5914
Excavation in ordinary rock 0.00 5.5 8300.325 0
Excavation in hard rock 0.00 0
B. Total Quantity of Earthwork Cutting Page No. - 46.05 Cu m
C. For Unlined Drain in Ordinary Soil No. L Area ( Sqm) QTY CUTTING FILLING
C(A) (80% of Quantity in Use ) Both Side 2 150.000 0.400 120.000 Cu m
D Quantity of Embankment Excavation from CC DRAIN + RT Wall & F.D 80% USE 820.800
E Quantity of Embankment Excavation from CD 80% USE 532.718
F Quntity of Scarifying in BT/WBM Road (80% Use) 1 0.00 3.00 0.075 0.000 Cu m
F Total Quantity of Earthwork Cutting = (B+C+D+E+F) 1559.568 Cu m
G Quantity of Embankment Fill From Cutting = G 1559.568 Cu m
H Quantity of Extra Widening of Curves < 60m radius. 0.000 Cu m
I Balance Earthwork Quantity = (A-G+I ) 15292.6691 Cu m 2780.485291 510.6947574
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
S. No. Description Nos. Quantity / CD Quantity Qty 80% Use
1RX1000MM DIA HPC 0 37.26 0
1.5 m SPAN SLAB CULVERT 2 153.40 306.80
3.0 m SPAN SLAB CULVERT 0 248.81 0.00
6.0 m SPAN SLAB CULVERT 0 326.06 0.00
2X6 M SPAN SLAB CULVERT 0 514.27 0.00
Retaining Wall 0.00
Toe Wall & F.D. 1026.00
Breast Wall 0.00
EARTHWORK CALCULATIONS
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA District:- BASTAR
Length:- 5500.00 m Block:- BASTAR
Chainage Distance Cut Area Fill Area Cut Fill Cum. Cut Cum. Fill Remarks
Volume Volume Volume Volume 0
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
NAME OF ROAD :-NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
LENGTH OF P.C.C. DRAIN :-440
Typical Cross Section of C.C. Drain
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-6
(Ministry of Rural Development, Govt. of India)
NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block : BASTAR
Length of the Road (Kms) : 5.5 Km Distt : BASTAR
ESTIMATE OF RETAINING WALL
S.No. SOR No. DESCRIPTION OF ITEMS Nos L(m) B(m) D(m) QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
1 7.1 Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (I) Ordinary Soil (i) Upto 3m. depth M!F47
2 7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 ii P.C.C grade M 15(Nominal mix (1:2.5:5)
3 7.18 Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 II. P.C.C. grade M 20 (Nominal mix (1:2:4)
4 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 0 - - - 0.00 Nos 317 0.00
5 7.23 Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
Design of Retaining Wall
1 Geometry of Wall 0.40 O.K O.K
Vertical Height 1.15 m
Height upto Footing top 1.15
Slope Ht. 1.15 m
Top width of R/W 0.40 m
Front batter 1.00
Back batter 3.00 1.15 Batter Slope 1 in 3.00
Min depth of fill infront of R/Wall 1.40 m
Inner to inner width of retaing wall at bottom= 0.00 Weep hole of 100 mm at every 1 m
Bottom width of R/W 1.25 m
Zc/t of wall bottom 0.26 G.L.
2 Footing data 0.783
first offset 0.2 m
First offset height 0.2 m
Bottom width of footing 1.65 m 0.20 0.20
3 Soil data 1.25 2.8
Density of back fill = 1.7 t/m 3 0.20 0.9333333333
Angle of Repose 30 0.52 Rad 1.333333333
Angle of Friction 10.00 0.17 Rad 1.65
Angle of inclination of back 18.43 0.322 Rad
Active earth pressure coefficient for back fill= 0.476 :-Earth Pressure EP
Coefficent of friction 0.3
4 Material properties ( 1+ sin ( ø+ δ )xsin ( ø+ i )
Grade of concrete( in t/m sq) 1500
Density of Conc 2.4
Permissible compressive stress in concrete= 500.00
Permissible tensile stress in concrete= -50.00 φ = 30 deg 0.524 rad
δ = 10 deg 0.175 rad
5 Load Data α = 0.322 deg 0.006 rad
Live load surcharge = 0 i = 0.000 deg 0.000 rad
Dead load of track structure 6.75 Ka = 0.476
Dispersion Width 3
Surcharge Pressure 2.25
A Check for Stresses
Stabilizing forces Lever arm w.r.toe of wall Lever arm w.r.t outer footing step Moment w.r.toe of footing" Moment w.r.t outer footing step
TOTAL MOMENT DUE TO VER. LOADS AT EDGE OF FOOTING= 1.83 2.45
Destabilizing forces
due to back fill =
TOTAL MOMENT DUE TO HOR LOADS AT FOOTING TOP/BOTTOM= 0.43 0.70 tm/m
Stress at top of footing
B Check for Footing Adequacy
Calculation of forces Lever arm w.r.toe of footing Moment arm w.r.toe of footing
First footing 0.792 0.93 0.73
First footing 0.782 1.55 1.21
Total 1.574 1.94
Calculation of property
Area at BF 1.65
Bearing pressure
Total Stabilising moment 4.39 t-m
Total Destabilising moment 0.70 t-m
Net moment = 3.69
Total Horizontal force 0.65
Frictional force 1.40
Passive resistance of SOIL IN FRONT 5.20
Total Destablizing moment 0.70
Stablising Moment 4.39
Sub Engineer Assistant Engineer Executive Engineer
CGRRDA,PIU-02,Pathalgaon. CGRRDA,PIU-02,Pathalgaon. CGRRDA,PIU-02,Pathalgaon.
Dist-Jashpur. Dist-Jashpur. Dist-Jashpur.
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-6
(Ministry of Rural Development, Govt. of India)
NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block : BASTAR
Length of the Road (Kms) : 5.5 Km Distt : BASTAR
ESTIMATE OF RETAINING WALL
S.No. SOR No. DESCRIPTION OF ITEMS Nos L(m) B(m) D(m) QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
1 7.1 Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (I) Ordinary Soil (i) Upto 3m. depth M!H47
2 7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 ii P.C.C grade M 15(Nominal mix (1:2.5:5)
3 7.18 Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 II. P.C.C. grade M 20 (Nominal mix (1:2:4)
4 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 0 - - - 0.00 Nos 317 0.00
5 7.23 Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Add 18% GST 0.00
Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
Design of Breast Wall
1 Geometry of Wall 0.40 O.K O.K
Vertical Height 1.00 m
Height upto Footing top 1.00
Slope Ht. 1.00 m
Top width of R/W 0.40 m
Front batter 1.00
Back batter 3.00 1.00 Batter Slope 1 in 3.00
Min depth of fill infront of R/Wall 1.40 m
Inner to inner width of retaing wall at bottom= 0.00 Weep hole of 100 mm at every 1 m
Bottom width of R/W 1.20 m
Zc/t of wall bottom 0.24 G.L.
2 Footing data 0.733
first offset 0.2 m
First offset height 0.2 m
Bottom width of footing 1.60 m 0.20 0.20
3 Soil data 1.20 2.8
Density of back fill = 1.7 t/m 3 0.20 0.9333333333
Angle of Repose 30 0.52 Rad 1.333333333
Angle of Friction 10.00 0.17 Rad 1.60
Angle of inclination of back 18.43 0.322 Rad
Active earth pressure coefficient for back fill= 0.476 :-Earth Pressure EP
Coefficent of friction 0.3
4 Material properties ( 1+ sin ( ø+ δ )xsin ( ø+ i )
Grade of concrete( in t/m sq) 1500
Density of Conc 2.4
Permissible compressive stress in concrete= 500.00
Permissible tensile stress in concrete= -50.00 φ = 30 deg 0.524 rad
δ = 10 deg 0.175 rad
5 Load Data α = 0.322 deg 0.006 rad
Live load surcharge = 0 i = 0.000 deg 0.000 rad
Dead load of track structure 6.75 Ka = 0.476
Dispersion Width 3
Surcharge Pressure 2.25
A Check for Stresses
Stabilizing forces Lever arm w.r.toe of wall Lever arm w.r.t outer footing step Moment w.r.toe of footing" Moment w.r.t outer footing step
TOTAL MOMENT DUE TO VER. LOADS AT EDGE OF FOOTING= 1.47 1.99
Destabilizing forces
due to back fill =
TOTAL MOMENT DUE TO HOR LOADS AT FOOTING TOP/BOTTOM= 0.30 0.52 tm/m
Stress at top of footing
B Check for Footing Adequacy
Calculation of forces Lever arm w.r.toe of footing Moment arm w.r.toe of footing
First footing 0.768 0.90 0.69
First footing 0.68 1.50 1.02
Total 1.448 1.71
Calculation of property
Area at BF 1.60
Bearing pressure
Total Stabilising moment 3.70 t-m
Total Destabilising moment 0.52 t-m
Net moment = 3.18
Total Horizontal force 0.51
Frictional force 1.21
Passive resistance of SOIL IN FRONT 5.20
Total Destablizing moment 0.52
Stablising Moment 3.70
Sub Engineer Assistant Engineer Executive Engineer
CGRRDA,PIU-02,Pathalgaon. CGRRDA,PIU-02,Pathalgaon. CGRRDA,PIU-02,Pathalgaon.
Dist-Jashpur. Dist-Jashpur. Dist-Jashpur.
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-6
(Ministry of Rural Development, Govt. of India)
NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block : BASTAR
Length of the Road (Kms) : 5.5 KM Distt : BASTAR
ESTIMATE OF DRAIN WITH WALL
S.No. SOR No. DESCRIPTION OF ITEMS Nos L(m) B(m) D(m) QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
1 7.1 Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (I) Ordinary Soil (i) Upto 3m. depth M!F47
2 7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 (Nominal mix 1:3:6)
3 7.18 Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 P.C.C grade M 15 (Nominal mix (1:2.5:5)
4 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 0 - - - 0.00 Nos 317 0.00 HYSD
5 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 (12 MM) WITHOUT WASTAGE 0.043 MT PER M
0.000 WITH 5% WASTAGE 0.045 MT PER M
Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
DRAIN WITH WALL
Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-6
(Ministry of Rural Development, Govt. of India)
NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block : BASTAR
3 5.5 Km Distt : BASTAR
ESTIMATE OF TOE WALL
S.No. SOR No. DESCRIPTION OF ITEMS Nos L(m) B(m) D(m) QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
1 7.1 Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (I) Ordinary Soil (i) Upto 3m. depth M!D47
2 7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 ii P.C.C grade M 15(Nominal mix (1:2.5:5)
3 10.5.II Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 II. Concere grade M-15
Add 18% GST 711281
Total:- 4662840
Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) 5220319
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-6
(Ministry of Rural Development, Govt. of India)
NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block : BASTAR
3 5.5 Km Distt : BASTAR
ESTIMATE OF TOE WALL
S.No. SOR No. DESCRIPTION OF ITEMS Nos L(m) B(m) D(m) QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
1 7.1 Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (I) Ordinary Soil (i) Upto 3m. depth M!D47
2 7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 ii P.C.C grade M 15(Nominal mix (1:2.5:5)
3 10.5.II Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 II. Concere grade M-15
Add 18% GST 711281
Total:- 4662840
Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) 5220319
PRADHAN MANTRI GRAM SADAK YOJANA
CERTIFICATE OF GROUND VERIFICATION FROM EXECUTIVE/ENGINEER / HEAD OF PIU
NAME OF ROAD : NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
LENGTH : 5.500 KM.
1 a) Certified that the Land width for the Road is available and that no additional land is required, or
b) Certified that land width for the Road is likely to be available as certified by the panchayats
2 a) Certified that no forest land is involved along the entire road way, or
b) Certified that the case for permission under forest conservation Act has been moved to the forest Department on (Date) and file no.
3 Certified that the DPR has been checked at site.
ON Date…………………………….
(DPR Wise Summary in Format F9-B)
EXECUTIVE ENGINEER
Assistant Engineer (CGRRDA 02 Pathalgaon) EXECUTIVE ENGINEER (CGRRDA 02 Pathalgaon)
Pradhan Mantri Gram Sadak Yojana (PMGSY)
(Ministry of Rural Development, Govt. of India)
LIST OF DPR'S VERIFIED ON GROUND
Name of Road : NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Package No. : -
Length : 5.5 Km
Sl.no. DPR's seen on ground by DPR Nos % of total number Remark
1 Executive Engineer 1 30
2 Assistant Engineer 1 50
3 Sub Engineer 1 100
Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
EXTRA QUANTITIES OF DIFFERENT ITEMS AT CURVE PORTION
Name of Road: NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
ON FLEXIBLE PAVEMENT.
Curve No. VERTEX CH MIN RADIUS Angle Km/ph LC Super elevation Extra width AV Quantity
Earth Work G.S.B. WMM I LAYER WMM I LAYER Primer Coat Tack Coat BM OGPC SEAL COAT CC
ON RIGID PAVEMENT.
Curve No. VERTEX CH MIN RADIUS Angle Km/ph LC Super elevation Extra width AV Quantity
Earth Work G.S.B. WBM LAYER CC LAYER SEAL COAT CC
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
Extra Quantity of Juntion portion
Name of Road: CHHATAUDA To KATWAR VIA BADGATNKHORD KHOCHANIYA CHHATAUDA To KATWAR VIA BADGATNKHORD KHOCHANIYA
ON FLEXIBLE PAVEMENT
ON RIGID PAVEMENT
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA F-7
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Sr. No. Type of Culvert Nos Unit Cost (In Lakhs) Total Amount (In Lakhs) Remark
2 1R x 1000mm Dia H.P.C 10 3.28 32.80 CD!A1
3 1.50 m SPAN SLAB CULVERT 2 10.39 20.77
4 3.0 m SPAN SLAB CULVERT 0 17.19 0.00
6 6.0 m 2SPAN SLAB CULVERT 0 41.79 0.00
Dismentling Cost of Ex. Culvert 3.768
Improvement Cost of Ex. Culvert 0.000
Field Crossing 4.067
Field Crossing in CC Portion 0.601 8.435
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA F-7
Name of Road:- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Sr. No. Type of Culvert Nos Unit Cost (In Lakhs) Total Amount (In Lakhs) Remark
2 1R x 1000mm Dia H.P.C 10 3.28 32.80 CD!A1
3 1.50 m SPAN SLAB CULVERT 2 10.39 20.77
4 3.0 m SPAN SLAB CULVERT 0 17.19 0.00
6 6.0 m 2SPAN SLAB CULVERT 0 41.79 0.00
Dismentling Cost of Ex. Culvert 3.768
Improvement Cost of Ex. Culvert 0.000
Field Crossing 4.067
Field Crossing in CC Portion 0.601 8.435
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA
S.No/SOR.No Description No. Length Breadth Hight/ Depth Quantity Unit Rate Amount
1/7.1 Excavation for Structures Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. `
(I) Ordinary Soil
i. Upto 3 m depth
Below pipes & Existing road 1 7.60 1.80 0.30 4.10
2/7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10(Nominal mix (1:3:6)
Foundation Concrete 2 6.20 1.90 0.15 3.53
4/7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II. P.C.C grade M 15(Nominal mix (1:2.5:5)
5/7.18 Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204
I. P.C.C grade M 15 (Nominal mix (1:2.5:5) cum 4031.00
Number Pillers 4 0.40 0.40 0.50 0.32
Deduction of opening of pipe 2 (Pi x 0.80 ^2) /4 (0.6+1.00) /2 -1.2
4/7.3 Bedding for Pipe
(ii) Type B ( First Class) Bedding
Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)
For haunches(Between face wall and around the hume pipe) 1 7.60 1.80 0.25 3.42
5/7.4(b) Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
10.5.II Cement concrete blocks of size as per Table 1300.2 cast in cement concrete of grade M 15 (a) Concrete grade M 15
Total 327753.00
ADD 18% GST 58995.54
TOTAL COST WITH GST 386748.54
Say (lakh) 3.87
PRADHAN MANTRI GRAM SADAK YOJANA
S.No/SOR.No Description No. Length Breadth Hight/ Depth Quantity Unit Rate Amount
1/7.1 Excavation for Structures Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. `
(I) Ordinary Soil
i. Upto 3 m depth
Below pipes & Existing road 1 7.60 1.80 0.30 4.10
2/7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10(Nominal mix (1:3:6)
Foundation Concrete 2 6.20 1.90 0.15 3.53
4/7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II. P.C.C grade M 15(Nominal mix (1:2.5:5)
5/7.18 Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204
I. P.C.C grade M 15 (Nominal mix (1:2.5:5) cum 4031.00
Number Pillers 4 0.40 0.40 0.50 0.32
Deduction of opening of pipe 2 (Pi x 0.80 ^2) /4 (0.6+1.00) /2 -1.2
4/7.3 Bedding for Pipe
(ii) Type B ( First Class) Bedding
Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)
For haunches(Between face wall and around the hume pipe) 1 7.60 1.80 0.25 3.42
5/7.4(b) Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
10.5.II Cement concrete blocks of size as per Table 1300.2 cast in cement concrete of grade M 15 (a) Concrete grade M 15
Total 327753.00
ADD 18% GST 58995.54
TOTAL COST WITH GST 386748.54
Say (lakh) 3.87
DETILED DRAWING OF SINGLE ROW 1000 mm DIA NP-3 HUME PIPE CULVERT
HALF TOP & HALF BOTTOM PLAN
Shoulder base + Surfacing Soulder
EARTHEN COUSION Minimum 300 mm
Thickness 115mm
1000 mm Inside Dia
U/s Boulder Apron D/s Boulder Apron
1.20 SLOPE : 1 in 100
DETAILED ESTIMATE OF R.C.C. SLAB CULVERT OF 1.50 Mtr. SPAN
Sr. No. SOR item no Description of Items No. Measurements Unit Qty. Rate Amt.
Leng. Width Thick
(II) Ordinary rock (not requiring blasting) i. Upto 3 m depth
Cut-off Wall 2x2 1.30 1.40 0.20 1.46
Cut-off Wall 2x2 1.30 0.80 1.50 6.24
Abutment Cap 2 7.50 0.700 0.200 2.10
6 7.31 Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 1 7.50 2.100 0.075 Cum 0.00 9091 0
6 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Type of Bar Nos. Dia of Bar (in mm) Spacing Length of Bar Wt . Per Unit length Total Wt.(MT)
Main Reinforcement (Bottom) 63 12 120 2279 0.888 0.127
Main Reinforcement (Top) 26 10 300 1766 0.617 0.028
Distribution (Bottom) 14 8 160 7420 0.395 0.041
Distribution (Top) 8 10 300 7420 0.617 0.037
Cap & Dirt Wall(Main Bars) 24 12 210 7420 0.888 0.158
Cap & Dirt Wall(Stirrups) 74 8 200 2880 0.395 0.084
Temprature Reinforcement, (Vertical Direction) 144 8 200 1500 0.395 0.085
Temprature Reinforcement, (Horizontal Direction) 16 8 200 13040 0.395 0.082
8 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 30 NO 30.00 317 9510
9 7.23/ I 50% Quantity as per Item No. 7.1 65.171 1032 67256
10 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Behind Abutment 2 6.10 0.6 1.91 13.98
Behind Returns 4 2.83 0.6 1.91 12.95
11 7.41/ III Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications 2 7.50 RM 15.00 221 3315
11 7.41/ IV Providing and fillling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight. 2 7.50 RM 15.00 50 750
ADD 18% GST 186968
TOTAL COST WITH GST 1225680
Say (Rs in Lacs ) : 12.26
DETAILED ESTIMATE OF R.C.C. SLAB CULVERT OF 1.50 Mtr. SPAN
Sr. No. SOR item no Description of Items No. Measurements Unit Qty. Rate Amt.
Leng. Width Thick
(II) Ordinary rock (not requiring blasting) i. Upto 3 m depth
Cut-off Wall 2x2 1.30 1.40 0.20 1.46
Cut-off Wall 2x2 1.30 0.80 1.50 6.24
Abutment Cap 2 7.50 0.700 0.200 2.10
6 7.31 Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 1 7.50 2.100 0.075 Cum 0.00 9091 0
6 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Type of Bar Nos. Dia of Bar (in mm) Spacing Length of Bar Wt . Per Unit length Total Wt.(MT)
Main Reinforcement (Bottom) 63 12 120 2279 0.888 0.127
Main Reinforcement (Top) 26 10 300 1766 0.617 0.028
Distribution (Bottom) 14 8 160 7420 0.395 0.041
Distribution (Top) 8 10 300 7420 0.617 0.037
Cap & Dirt Wall(Main Bars) 24 12 210 7420 0.888 0.158
Cap & Dirt Wall(Stirrups) 74 8 200 2880 0.395 0.084
Temprature Reinforcement, (Vertical Direction) 144 8 200 1500 0.395 0.085
Temprature Reinforcement, (Horizontal Direction) 16 8 200 13040 0.395 0.082
8 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 30 NO 30.00 317 9510
9 7.23/ I 50% Quantity as per Item No. 7.1 65.171 1032 67256
10 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Behind Abutment 2 6.10 0.6 1.91 13.98
Behind Returns 4 2.83 0.6 1.91 12.95
11 7.41/ III Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications 2 7.50 RM 15.00 221 3315
11 7.41/ IV Providing and fillling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight. 2 7.50 RM 15.00 50 750
ADD 18% GST 186968
TOTAL COST WITH GST 1225680
Say (Rs in Lacs ) : 12.26
0.1 FOUNDATION hard stata
1.9 0.1 2.6 WING WALL
HALF TOP & HALF BOTTOM PLAN
RETURN 0.20 1.5 M-20
0.1 1.2 0.30m Thick M15 N.B.L.
0.20 2.3 Base Concrete M-10 Plane-7.02
ROAD NAME DISTRICT BLOCK
BASTAR BASTAR Length (in KM):- 5.50
Sr. No. SOR Item No. DESCRIPTION OF ITEMS QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
1 2.1 Setting Out Setting Out work complete with construction of bench mark (Min 1 per km) working benchmark (Min 4 per km) and near all bridges and cross-drainage works made of bricks/stone masonary or concrete and reference pillars made of precast concrete poles/concrete filled 100 mm dia A.C.pipe @ 100 m interval of as required on both sides of the formation width, marking on centre line, setting out curves and recording of centre line levels and other required levels and distances etc. including setting out of crossdrainage structures & bridges with required reference pillars and marking etc. as directed by Engineer-in-Charge. 5.50 Km 13949.00 76720
2 2.3 Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (A) In area of non-thorny jungle 44000 Sqm 7.00 308000
3 3.2 Compacting Original Ground / Existing Embankment. Loosening, Levelling and Compacting original ground/existing embankment/supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. 3870.00 Cum 25.00 96750
5 3.8 (i) Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with all lift and lead of 50 m as per Technical Specification Clause 307. 400.00 Cum 99.00 39600
4 3.5 (ii) Excavation in Cutting in Soil by manual/ Machinery means Excavation for roadway in soil for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 55.05 Cum. 85.00 4679
5 3.9 Excavation in ordinary rock including loading in a truck and carrying of excavated material to embankment site with all lift and lead upto 50 m as per Technical Specification Clause 302.3.5. 0.00 Cum. 287.00 0
7 3.3 (i) Construction of Embankment with Material Obtained from Roadway Cutting (i) Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 1559.5684 Cum. 63.00 98253
8 3.4 (ii) Construction of Embankment with Material Obtained from Pits Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 (Beyond 250m)with all leads as per Technical Specification Clause 301.5(Having CBR more than 5) 15292.6691 Cum. 222.00 3394973
9 3.12 (a) Construction of subgrade and earthen shoulders with approved material (Granular material having CBR not less than 7) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.For Item No.3.12(a) & (b) 3550.82925 Cum 192.00 681759
10 3.12 (b) Construction of subgrade and earthen shoulders with approved material (Granular material having CBR not less than 10) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.(To be used for side shoulder WBM) 3555.28709 Cum 223.00 792829
11 4.1 (a) Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III) 3185.22 Cum. 604.00 1923871
12 4.8 Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. 3047.03 Cum. 1887.00 5749739
13 5.1 Prime Coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 18704.13 Sqm. 62.00 1159656
14 5.2 (iii) Tack Coat (iii) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. 18704.13 Sqm. 21.00 392787
15 5.13 20mm thick Open-Graded Premix Carpet using Bituminous Binder Mixing with processed Waste plastic (as per IRC:SP:98-2013) by replacement of 8% Bitumen binder by weight. Providing, laying and rolling of 20mm thick open-graded premix carpet (Thickness not less than 20 mm at any place) composed of 13.2 mm graded aggregate size @ 0.18 cum per 10 sqm & 11.2 mm graded aggregate size @ 0.09 cum per 10 sqm using with bitumenous binder @13.43Kg per 10 sqm (i.e. 92% of standard Bitumen and 8% waste processed plastic by weight shall be used for coating aggregate after its heating) as per IRC:SP:98-2013, laying to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 to be followed by seal coat of either Type A , Type B or Type C as per Technical Specification. 18704.13 Sqm. 170.00 3179701
16 5.5 Case II (B) Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510, Viscocity grade (VG) Bitumen specification as per IS 73:2006 Case - II : Type B (II)Bitumen (VG-30) 18704.13 Sqm. 60.00 1122248
17 7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 1907.10 Cum. 4576.00 8726890
18 6.1.ii Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including eveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Cum. 5889.00 0
19 6.8 Construction of Panel concrete Construction of Panel concrete, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed a in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibratos and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, admixture as approved, curing of concrete slabs for 14 days. Curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification Clause 1501. PCC Grade M-30 Each Panel (0.5 m x0.5m to 1.00m x 1.00m) thickness 100 mm. 472.50 Cum. 6048.00 2857680
20 9.21 (B) Retro-Reflective Traffic signs Direction and place identification signs up to 0.9 Sqm. sisn board Providing and erecting direction and place identification of Retro reflective sheeting classs A/ class B sign boards type IV as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade as per MORI) specifications ofrequired shade and colour. Supported and welded on two nos.47 mm x 47 mm of 12 SWG square tube of 3050 mm height duty strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mmr 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 12.98 Sqm. 6244.00 81047
21 9.16 Providing & Fixing of PMGSY 'Logo' board Providing and fixing of typical PMGSY logo board as per MoRD specifications and drawings. 3.00 Each 6626.00 19878
22 9.21 (A) A typical design of PMGSY informatory Sign Board is shown in fig. 1700.1 The specification and installation details ofthe typical sign board are given below: (i)The board will be a composite unit consisting of three plates of Alumininm Composite Materials (ACM), material specifications are per Clause 1701.3.7 The top most plate will be in diamond shape of 600 mn x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size on back on edges. The middle plate will be 1200 mm 150 mm size riveted over welded rvr.s. angle iron frame of 25 mm x 25 nm x 5 mm size on back on edges. The main Iower most plate wiII be 1500 mn x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG ) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate wilt be flushed with the top of 75 nm dia medium steel tube posts and these posts will be embedded in cement concrete M 15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower nost plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders etc. of middle and bottom plate, pMGSy logo on top plates shall be as per clause 1701.4.6 messages/Borders. All the section of frame and posts will be painted with primer and two coats of Epoxy paint The steel tube below ground level will be painted with three coats of Epoxy paint The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sing in a contrasting colour or by stamping in characters not exceeding 50 mm in height. 1.00 Each 17699.00 17699
23 9.15 (A) Providing and fixing 'Citizen Information Board' of PMGSY Project (A) Providing and fixing of typical " PMGSY Citizen Information Board" with Logo as per MoRD specifications & drawings, made of 75 mm square or 75 mm dia circular steel tube of 12 SWG 3.2 m height and cross member 2 nos 1m long, fixed with angle iron 50x50x5 mm MS angle on the back 1.00 Each 14010.00 14010
24 9.8 (i) Kilometer Stone Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (I) 5th Kilometer Stone (precast) 1.00 Each 3947.00 3947
25 9.8 (ii) Kilometer Stone Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (II) Ordinary Kilometer Stone (Precast) 7.00 Each 2292.00 16044
26 9.8 (iii) Kilometer Stone Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (III) 200 m stone (precast) 22.00 Each 660.00 14520
27 9.9 Boundary Pillar Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704 0.00 Each 673.00 0
28 9.17 Guard Stone Reinforced cement concrete M15 grade Guard Stone of size 200 mm x 200mm x 800 mm fixing in position including painting and printing etc. as per drawing, Technical Specification and as per direction of Engineer in Charge. 100.00 Each 525.00 52500
29 9.18 Road marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes.) 1032.00 Sqm 627.00 647064
30 9.19 (A) Speed Braker Providing and laying rounded hump type of Speed Breaker confirming to IRC – 99 and as per guidelines and drawings of NRRDA circular no. DO No. P-17019/6/2006/PII Dated 16 Sept 2009, including providing, laying and compaction of GSB, G II, G III, OGPC, Seal Coat Type B, as per specifications and appended drawing on both the sides of carriage way up to formation width maintaining rounded hump type shape with bituminous mix material i/c providing and painting of black and white strips, providing and fixing of two no. 600mm equilateral semi reflecting sign boards, i/c cost of all materials, labour T & P & Machinery etc complete and as directed by engineer in charge as per relevant clauses of MORD specifications. For 7.50 M Formation Width Each 22547.00 0
31 7.6 (A) Providing and laying reinforced cement concrete pipe NP3 for Culverts/ Burried conduits on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106. (A) 600 mm dia 100.00 RM 2928.00 292800
32 7.6 (D) Providing and laying reinforced cement concrete pipe NP3 for Culverts/ Burried conduits on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106. (D) 300 mm dia 40.00 RM 1129.00 45160
33 7.1 (i) Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i. Ordinary soil i. Upto 3 m depth 1116.00 Cum 394.00 439704
34 3.5 (i) (i) Excavation in Cutting in Soil by manual means Excavation for roadway in soil for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 Cum 65.00 0
35 6.6 Construction of RCC open drain 0.60 m x 0.60 m inside dimension lined with 120 mm thick RCC M-20 walls, 120 mm thick CC M-20 foundation, over 100 mm thick (Av) levelling course in PCC M-15 including excavation, dressing of sides and bottom, provision of HYSD reinforcement consisting 8 mm dia horizontal bars @ 150 mm c/c and L-shaped 8 mm dia vertical bars @ 150 mm c/c (L=800 mm) including cutting, bending and binding wire, placing in position, providing shuttering and concreting by using concrete mixer, compaction by vibration etc complete as per drawings and technical specifications. 440.00 Cum 2710.00 1192400
36 7.27 Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 II.R.C.C M 25 (Design mix) 6.16 Cum 6498.00 40028
37 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 0.493 MT 73726.00 36332
38 2.6 (C) Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (A)Lime Concrete 298.32 Cum 1263.00 376778
39 2.6 (C) Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (C)Reinforced Cement Concrete 0.00 Cum 0.00 0
40 2.8 Dismantling Stone Masonry Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (A) Rubble Stone Masonry in Lime/Cement/mud mortar 0.00 Cum 0.00 0
41 2.10 (A) Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. (A) Upto 600 mm dia 0.00 M 164.00 0
42 2.10 (B) Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. (B) Above 600 mm to 900 mm dia 0.00 M 222.00 0
43 2.10 (C) Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. (C) Above 900 mm dia 0.00 M 592.00 0 0 10 2 0 0 0 RT Wall Breast Wall Toe Wall DRAIN WITH WALL FIELD CROSSING
44 10.5 (II) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 II. Concere grade M-15 0.00 CUM 4667.00 0
33896044 HPC HPC 1.5 3 6 12 Total
45 7.1 (i) Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i. Ordinary soil i. Upto 3 m depth 880.72 Cum 394 347005 37.26 35.91 130.34 218.276 293.37 465.17 0.00 0.00 1026.00 0.00 10.00 1655.78
46 7.1 (ii) Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (ii)Ordinary rock (not requiring blasting) i. Upto 3 m depth 46.12 Cum 493 22735 23.058 30.534 32.69 49.10 46.12
47 7.7 Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 Nominal Mix 1:3:6(with 40mm Graded metal 0.00 Cum 4614 0 62.93 0.00
49 7.10 (i) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I P.C.C grade M 10(Nominal mix (1:3:6) 173.76 Cum 4614 801710 13.73 13.73 18.228 25.732 31.65 32.32 0.00 173.76
50 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II P.C.C grade M 15(Nominal mix (1:2.5:5) 391.05 Cum 4576 1789439 14.94 14.94 86.43 299.55 0.00 0.00 775.20 2.40 1099.86
51 7.9 Filling annular space around footing in rock as per technical specification Clause 1203.4.3. P.C.C grade M 15 (Nominal mix 1:2.5:5) 0.00 Cum 4652 0 22.98 0.00
52 7.18 (i) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m I P.C.C grade M 15 (Nominal mix (1:2.5:5) 421.35 Cum 4839 2038898 16.76 16.76 48.05 228.57 253.96 139.34 0.00 263.70
53 7.18 (ii) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m II P.C.C grade M 20 (Nominal mix (1:2:4) 0.00 Cum 5384 0 0.00 0.00 0.00
54 7.27 (ii) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 II.R.C.C M 25 (Design mix) 25.75 Cum 6498 167330 12.8755 15.088 38.08 74.51 25.75
55 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 1.42 MT 73726 104442 0 0.708312 1.10 2.29 4.43 0 1.42
56 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 60.00 Nos. 317 19020 30.00 35.00 26.00 78.00 0.00 0.00 0.00 60.00
57 7.34 Providing and fixing in position pipe railing consisting of IS Rolled steel joist posts designation IS MB 100 (100x75) at 2.5 m interval and three rows of 50 mm dia steel pipes (light) including fixing in position on bridge deck complete as per drawing and technical specifications Clause 1208.2 0.00 Cum 2349 0 50.80 0.00
58 7.4b Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 137.50 M 5468 751850 12.50 10.00 100.00
59 7.23 (i) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 I) Granular material 130.34 Cum 1032 134512 65.17 109.14 146.69 230.74 130.34
60 7.23 (ii) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 II) Sandy material 0.00 Cum 1564 0 0.00 0.00 0.00
61 10.5.ii Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 90.00 Cum 4667.00 420030 9.00 9.00 0.00 90.00
62 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3. 53.86 Cum 1751 94312 26.931 35.784 26.49 49.53 53.86
63 7.41/ III Filler Joint Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications 30.00 RM 221 6630 15.00 15.00 15.00 30.00 30.00
64 7.41/ IV Filler Joint Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight. 30.00 RM 50 1500 15.00 15.00 15.00 30.00 30.00
65 7.31 Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 0.00 Cum 11782 0 2.03 3.83 7.88 0.00
66 10.1 Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 25.34 Cum 1619 41020
67 7.13 Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 0.90 MT 72036 64667
68 7.41 Filler Joint Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 5.02 RM 399 2004
69 7.3 Filling in Foundation Trenches as per drawing and technical specification Clause 1108 & 305.3.9 I. Sand filling 83.57 Cum 1200 100284
70 7.4 Tubular Steel Railing on Medium Weight Steel Channel (ISMC series) 100 mm x 50 mm Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 m high above ground, 2 m centre-to-centre, complete as per approved drawings Clause 1706 0.00 RM 5468 0
71 7.31 Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 16.07 RM 11782 189366
72 10.5 Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (i) Stone / Boulder 36.00 Cum 1619 58284
Total cost 41079218
Add 18% GST 7394259
Total Construction Cost (A) 48473477
Say Rs. In Lacs 484.73
MAINTENANCE OF ROAD -
Total Maintenance 2200000
Add 18% GST 396000
Total Maintenance Cost (B) 2596000
Grand Total A+B 51069477
Say Rs. In Lacs 510.69
Sub Engineer Assistant Engineer ExecutiveEngineer
PIU 01 Jagdalpur PIU 01 Jagdalpur PIU 01 Jagdalpur
MUKHYA MANTRY GRAM SADAK EVAM VIKAS YOJANA
(Ministry of Rural Development, Govt. of C.G.)
COST ESTIMATE FOR ROAD CONSTRUCTION
BILL OF QUANTITY
Road Name Nawa Ratenga Paripatpara Mukhya Marg To Bade Badrenga DISTRICT BLOCK SOR-CGRRDA Road SOR 06.06.2025
BASTAR BASTAR Length (in KM):- 5.50
Sr. No. SOR Item No. DESCRIPTION OF ITEMS QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
1 2.1 Setting Out Setting Out work complete with construction of bench mark (Min 1 per km) working benchmark (Min 4 per km) and near all bridges and cross-drainage works made of bricks/stone masonary or concrete and reference pillars made of precast concrete poles/concrete filled 100 mm dia A.C.pipe @ 100 m interval of as required on both sides of the formation width, marking on centre line, setting out curves and recording of centre line levels and other required levels and distances etc. including setting out of crossdrainage structures & bridges with required reference pillars and marking etc. as directed by Engineer-in-Charge. 5.50 Km 13949.00 76720
2 2.3 Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (A) In area of non-thorny jungle 44000 Sqm 7.00 308000
3 3.2 Compacting Original Ground / Existing Embankment. Loosening, Levelling and Compacting original ground/existing embankment/supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. 3870.00 Cum 25.00 96750
5 3.8 (i) Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with all lift and lead of 50 m as per Technical Specification Clause 307. 400.00 Cum 99.00 39600
4 3.5 (ii) Excavation in Cutting in Soil by manual/ Machinery means Excavation for roadway in soil for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 55.05 Cum. 85.00 4679
5 3.9 Excavation in ordinary rock including loading in a truck and carrying of excavated material to embankment site with all lift and lead upto 50 m as per Technical Specification Clause 302.3.5. 0.00 Cum. 287.00 0
7 3.3 (i) Construction of Embankment with Material Obtained from Roadway Cutting (i) Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 1559.5684 Cum. 63.00 98253
8 3.4 (ii) Construction of Embankment with Material Obtained from Pits Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 (Beyond 250m)with all leads as per Technical Specification Clause 301.5(Having CBR more than 5) 15292.6691 Cum. 222.00 3394973
9 3.12 (a) Construction of subgrade and earthen shoulders with approved material (Granular material having CBR not less than 7) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.For Item No.3.12(a) & (b) 3550.82925 Cum 192.00 681759
10 3.12 (b) Construction of subgrade and earthen shoulders with approved material (Granular material having CBR not less than 10) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.(To be used for side shoulder WBM) 3555.28709 Cum 223.00 792829
11 4.1 (a) Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III) 3185.22 Cum. 604.00 1923871
12 4.8 Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. 3047.03 Cum. 1887.00 5749739
13 5.1 Prime Coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 18704.13 Sqm. 62.00 1159656
14 5.2 (iii) Tack Coat (iii) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. 18704.13 Sqm. 21.00 392787
15 5.13 20mm thick Open-Graded Premix Carpet using Bituminous Binder Mixing with processed Waste plastic (as per IRC:SP:98-2013) by replacement of 8% Bitumen binder by weight. Providing, laying and rolling of 20mm thick open-graded premix carpet (Thickness not less than 20 mm at any place) composed of 13.2 mm graded aggregate size @ 0.18 cum per 10 sqm & 11.2 mm graded aggregate size @ 0.09 cum per 10 sqm using with bitumenous binder @13.43Kg per 10 sqm (i.e. 92% of standard Bitumen and 8% waste processed plastic by weight shall be used for coating aggregate after its heating) as per IRC:SP:98-2013, laying to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 to be followed by seal coat of either Type A , Type B or Type C as per Technical Specification. 18704.13 Sqm. 170.00 3179701
16 5.5 Case II (B) Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510, Viscocity grade (VG) Bitumen specification as per IS 73:2006 Case - II : Type B (II)Bitumen (VG-30) 18704.13 Sqm. 60.00 1122248
17 7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 1907.10 Cum. 4576.00 8726890
18 6.1.ii Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including eveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Cum. 5889.00 0
19 6.8 Construction of Panel concrete Construction of Panel concrete, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed a in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibratos and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, admixture as approved, curing of concrete slabs for 14 days. Curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification Clause 1501. PCC Grade M-30 Each Panel (0.5 m x0.5m to 1.00m x 1.00m) thickness 100 mm. 472.50 Cum. 6048.00 2857680
20 9.21 (B) Retro-Reflective Traffic signs Direction and place identification signs up to 0.9 Sqm. sisn board Providing and erecting direction and place identification of Retro reflective sheeting classs A/ class B sign boards type IV as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade as per MORI) specifications ofrequired shade and colour. Supported and welded on two nos.47 mm x 47 mm of 12 SWG square tube of 3050 mm height duty strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mmr 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 12.98 Sqm. 6244.00 81047
21 9.16 Providing & Fixing of PMGSY 'Logo' board Providing and fixing of typical PMGSY logo board as per MoRD specifications and drawings. 3.00 Each 6626.00 19878
22 9.21 (A) A typical design of PMGSY informatory Sign Board is shown in fig. 1700.1 The specification and installation details ofthe typical sign board are given below: (i)The board will be a composite unit consisting of three plates of Alumininm Composite Materials (ACM), material specifications are per Clause 1701.3.7 The top most plate will be in diamond shape of 600 mn x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size on back on edges. The middle plate will be 1200 mm 150 mm size riveted over welded rvr.s. angle iron frame of 25 mm x 25 nm x 5 mm size on back on edges. The main Iower most plate wiII be 1500 mn x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG ) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate wilt be flushed with the top of 75 nm dia medium steel tube posts and these posts will be embedded in cement concrete M 15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower nost plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders etc. of middle and bottom plate, pMGSy logo on top plates shall be as per clause 1701.4.6 messages/Borders. All the section of frame and posts will be painted with primer and two coats of Epoxy paint The steel tube below ground level will be painted with three coats of Epoxy paint The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sing in a contrasting colour or by stamping in characters not exceeding 50 mm in height. 1.00 Each 17699.00 17699
23 9.15 (A) Providing and fixing 'Citizen Information Board' of PMGSY Project (A) Providing and fixing of typical " PMGSY Citizen Information Board" with Logo as per MoRD specifications & drawings, made of 75 mm square or 75 mm dia circular steel tube of 12 SWG 3.2 m height and cross member 2 nos 1m long, fixed with angle iron 50x50x5 mm MS angle on the back 1.00 Each 14010.00 14010
24 9.8 (i) Kilometer Stone Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (I) 5th Kilometer Stone (precast) 1.00 Each 3947.00 3947
25 9.8 (ii) Kilometer Stone Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (II) Ordinary Kilometer Stone (Precast) 7.00 Each 2292.00 16044
26 9.8 (iii) Kilometer Stone Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (III) 200 m stone (precast) 22.00 Each 660.00 14520
27 9.9 Boundary Pillar Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704 0.00 Each 673.00 0
28 9.17 Guard Stone Reinforced cement concrete M15 grade Guard Stone of size 200 mm x 200mm x 800 mm fixing in position including painting and printing etc. as per drawing, Technical Specification and as per direction of Engineer in Charge. 100.00 Each 525.00 52500
29 9.18 Road marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes.) 1032.00 Sqm 627.00 647064
30 9.19 (A) Speed Braker Providing and laying rounded hump type of Speed Breaker confirming to IRC – 99 and as per guidelines and drawings of NRRDA circular no. DO No. P-17019/6/2006/PII Dated 16 Sept 2009, including providing, laying and compaction of GSB, G II, G III, OGPC, Seal Coat Type B, as per specifications and appended drawing on both the sides of carriage way up to formation width maintaining rounded hump type shape with bituminous mix material i/c providing and painting of black and white strips, providing and fixing of two no. 600mm equilateral semi reflecting sign boards, i/c cost of all materials, labour T & P & Machinery etc complete and as directed by engineer in charge as per relevant clauses of MORD specifications. For 7.50 M Formation Width Each 22547.00 0
31 7.6 (A) Providing and laying reinforced cement concrete pipe NP3 for Culverts/ Burried conduits on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106. (A) 600 mm dia 100.00 RM 2928.00 292800
32 7.6 (D) Providing and laying reinforced cement concrete pipe NP3 for Culverts/ Burried conduits on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106. (D) 300 mm dia 40.00 RM 1129.00 45160
33 7.1 (i) Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i. Ordinary soil i. Upto 3 m depth 1116.00 Cum 394.00 439704
34 3.5 (i) (i) Excavation in Cutting in Soil by manual means Excavation for roadway in soil for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 Cum 65.00 0
35 6.6 Construction of RCC open drain 0.60 m x 0.60 m inside dimension lined with 120 mm thick RCC M-20 walls, 120 mm thick CC M-20 foundation, over 100 mm thick (Av) levelling course in PCC M-15 including excavation, dressing of sides and bottom, provision of HYSD reinforcement consisting 8 mm dia horizontal bars @ 150 mm c/c and L-shaped 8 mm dia vertical bars @ 150 mm c/c (L=800 mm) including cutting, bending and binding wire, placing in position, providing shuttering and concreting by using concrete mixer, compaction by vibration etc complete as per drawings and technical specifications. 440.00 Cum 2710.00 1192400
36 7.27 Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 II.R.C.C M 25 (Design mix) 6.16 Cum 6498.00 40028
37 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 0.493 MT 73726.00 36332
38 2.6 (C) Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (A)Lime Concrete 298.32 Cum 1263.00 376778
39 2.6 (C) Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (C)Reinforced Cement Concrete 0.00 Cum 0.00 0
40 2.8 Dismantling Stone Masonry Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (A) Rubble Stone Masonry in Lime/Cement/mud mortar 0.00 Cum 0.00 0
41 2.10 (A) Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. (A) Upto 600 mm dia 0.00 M 164.00 0
42 2.10 (B) Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. (B) Above 600 mm to 900 mm dia 0.00 M 222.00 0
43 2.10 (C) Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. (C) Above 900 mm dia 0.00 M 592.00 0 0 10 2 0 0 0 RT Wall Breast Wall Toe Wall DRAIN WITH WALL FIELD CROSSING
44 10.5 (II) Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 II. Concere grade M-15 0.00 CUM 4667.00 0
33896044 HPC HPC 1.5 3 6 12 Total
45 7.1 (i) Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i. Ordinary soil i. Upto 3 m depth 880.72 Cum 394 347005 37.26 35.91 130.34 218.276 293.37 465.17 0.00 0.00 1026.00 0.00 10.00 1655.78
46 7.1 (ii) Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (ii)Ordinary rock (not requiring blasting) i. Upto 3 m depth 46.12 Cum 493 22735 23.058 30.534 32.69 49.10 46.12
47 7.7 Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 Nominal Mix 1:3:6(with 40mm Graded metal 0.00 Cum 4614 0 62.93 0.00
49 7.10 (i) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I P.C.C grade M 10(Nominal mix (1:3:6) 173.76 Cum 4614 801710 13.73 13.73 18.228 25.732 31.65 32.32 0.00 173.76
50 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II P.C.C grade M 15(Nominal mix (1:2.5:5) 391.05 Cum 4576 1789439 14.94 14.94 86.43 299.55 0.00 0.00 775.20 2.40 1099.86
51 7.9 Filling annular space around footing in rock as per technical specification Clause 1203.4.3. P.C.C grade M 15 (Nominal mix 1:2.5:5) 0.00 Cum 4652 0 22.98 0.00
52 7.18 (i) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m I P.C.C grade M 15 (Nominal mix (1:2.5:5) 421.35 Cum 4839 2038898 16.76 16.76 48.05 228.57 253.96 139.34 0.00 263.70
53 7.18 (ii) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m II P.C.C grade M 20 (Nominal mix (1:2:4) 0.00 Cum 5384 0 0.00 0.00 0.00
54 7.27 (ii) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 II.R.C.C M 25 (Design mix) 25.75 Cum 6498 167330 12.8755 15.088 38.08 74.51 25.75
55 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 1.42 MT 73726 104442 0 0.708312 1.10 2.29 4.43 0 1.42
56 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 60.00 Nos. 317 19020 30.00 35.00 26.00 78.00 0.00 0.00 0.00 60.00
57 7.34 Providing and fixing in position pipe railing consisting of IS Rolled steel joist posts designation IS MB 100 (100x75) at 2.5 m interval and three rows of 50 mm dia steel pipes (light) including fixing in position on bridge deck complete as per drawing and technical specifications Clause 1208.2 0.00 Cum 2349 0 50.80 0.00
58 7.4b Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 137.50 M 5468 751850 12.50 10.00 100.00
59 7.23 (i) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 I) Granular material 130.34 Cum 1032 134512 65.17 109.14 146.69 230.74 130.34
60 7.23 (ii) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 II) Sandy material 0.00 Cum 1564 0 0.00 0.00 0.00
61 10.5.ii Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 90.00 Cum 4667.00 420030 9.00 9.00 0.00 90.00
62 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3. 53.86 Cum 1751 94312 26.931 35.784 26.49 49.53 53.86
63 7.41/ III Filler Joint Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications 30.00 RM 221 6630 15.00 15.00 15.00 30.00 30.00
64 7.41/ IV Filler Joint Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight. 30.00 RM 50 1500 15.00 15.00 15.00 30.00 30.00
65 7.31 Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 0.00 Cum 11782 0 2.03 3.83 7.88 0.00
66 10.1 Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 25.34 Cum 1619 41020
67 7.13 Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 0.90 MT 72036 64667
68 7.41 Filler Joint Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 5.02 RM 399 2004
69 7.3 Filling in Foundation Trenches as per drawing and technical specification Clause 1108 & 305.3.9 I. Sand filling 83.57 Cum 1200 100284
70 7.4 Tubular Steel Railing on Medium Weight Steel Channel (ISMC series) 100 mm x 50 mm Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 m high above ground, 2 m centre-to-centre, complete as per approved drawings Clause 1706 0.00 RM 5468 0
71 7.31 Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 16.07 RM 11782 189366
72 10.5 Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 (i) Stone / Boulder 36.00 Cum 1619 58284
Total cost 41079218 410.79
Add 18% GST 7394259
Total Construction Cost (A) 48473477
Say Rs. In Lacs 484.73
MAINTENANCE OF ROAD -
Total Maintenance 2200000
Add 18% GST 396000
Total Maintenance Cost (B) 2596000
Grand Total A+B 51069477
Say Rs. In Lacs 510.69
Sub Engineer Assistant Engineer ExecutiveEngineer
PIU 01 Jagdalpur PIU 01 Jagdalpur PIU 01 Jagdalpur
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-6
COST ESTIMATE FOR ROAD CONSTRUCTION FOR FIELD CROSSING
Road from :- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block : BASTAR
Length of the Road (Kms) : 5.5 Km Distt : BASTAR
Sr. No. SOR Item No. DESCRIPTION OF ITEMS Nos L(m) B(m) D(m) QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
1 7.1 Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
For Field Crossing Pipe Portion 10 10.00 0.800 1.000 80.00 10.00 0.5 0.5 985.00
2 7.6 (A) Providing & Laying Cement Concrete Pipe NP3 on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets as per clause 1106 . (i) (A) 600 mm Dia. 16823.00 9 151407.00
3 7.10/II Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II) P.C.C grade M 15 (Nominal mix (1:2.5:5) 10 10.00 0.900 0.200 18.00 Cum 4576.00 82368.00 10.00 0.5 0.1 2288.00
Grand Total With GST 479891.84 27007055.58
SAY 4.80 LACS. #VALUE!
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
Flexible pavement #REF! #REF! #REF!
Rigid pavement #REF! #REF! #REF!
PRADHAN MANTRI GRAM SADAK YOJANA FORMAT F-6
COST ESTIMATE FOR ROAD CONSTRUCTION FOR FIELD CROSSING IN CC PORTION
Road from :- NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA Block : BASTAR
Length of the Road (Kms) : 5.5 Km Distt : BASTAR
Sr. No. SOR Item No. DESCRIPTION OF ITEMS Nos L(m) B(m) D(m) QUANTITY UNIT RATE (Rs.) AMOUNT (Rs.)
1 7.1 Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
For Field Crossing Pipe Portion 4 10.00 0.500 0.500 10.00 10.00 0.5 0.5 985.00
2 7.6 (A) Providing & Laying Cement Concrete Pipe NP3 on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets as per clause 1106 . (D) 300 mm Dia. 16823.00 9 151407.00
3 7.10/II Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II) P.C.C grade M 15 (Nominal mix (1:2.5:5) Both side. 4 10.00 0.600 0.100 2.40 Cum 4576.00 10982.40 10.00 0.5 0.1 2288.00
Grand Total With GST 70897.23 27007055.58
SAY 0.71 LACS. #VALUE!
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur) EXECUTIVE ENGINEER (CGRRDA PIU 01 Jagdalpur)
Flexible pavement #REF! #REF! #REF!
Rigid pavement #REF! #REF! #REF!
PRADHAN MANTRI GRAM SADAK YOJANA
(Ministry of Rural Development, Govt. of India )
Detailed Estimate for Dismentaling of Existing Culverts
S.No. Item No ITEM DESCRIPTION NO L B D Quantity Rate Unit Amount in Rs/-
(c) Reinforced Cement Concrete
WALL 2X2 5 1.4 1.2 67.20 1 920 1.50 m Span Slab Culvert DAMAGE CONDITION
SLAB 1X2 6 2.1 0.15 15.12 2 5455 1.50 m Span Slab Culvert DAMAGE CONDITION
Abutments 2X2 6 2.5 1.8 216.00
AT RD- 1230 4 5715 1X1.50M SPAN SLAB CULVERT GOOD CON.
FOR WALL 2 2.5 0.45 1 2.25 5 5900 1X4.0M SPAN SLAB CULVERT DAMAGE CON.
Abutments 2 7.4 2 1.8 53.28 7
AT RD- 9495 0 5715 1X1.50M SPAN SLAB CULVERT GOOD CON.
0 5900 1X4.0M SPAN SLAB CULVERT DAMAGE CON.
Abutments 2 3.5 0.65 1 4.55 0
WING WALL 4 5.5 1.5 1.0 33.00 0 3100 1X6.0M SPAN SLAB CULVERT DAMAGE CON.
SLAB 1 7.2 5.5 0.1 3.96 0 5115 1X3.0M SPAN SLAB CULVERT REPLACE
Abutments 2 5.5 1.5 1.0 16.50 0 5265 1X1.50M SPAN SLAB CULVERT GOOD CON.
2.8 Dismentaling of Structere like Culverts, bridges , retaining walls and other structure compraising of stone masnory disposal unserviceable material & stacking the serviceable material with all lift & lead of 1000m as per Technical specifications Clause 202. By Manual Means 0
(A) Rubble Stone Masonry in Lime/Cement/mud mortar 0
TOTAL 0.00 300.00 Cum 0
2.10 Removing all type of hume pipe & stacking within a lead of 1000m includiung earth work & dismentaling of masnory work as per technical specification Clause 202
(A) Upto 600 mm dia Hume Pipe 0 5.00 0.00 164.00 M 0
(B) Above 600mm to 900mm dia 0 5.00 0.00 222.00 M 0
(C) Above 900mm dia Hume pipe 0 7.50 0.00 592.00 M 0
1 2.11 Dismantling of cement concrete pavements and breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately, as per Technical Specification Clause. 202
TOTAL 376778.2 1
ADD 18% GST 67820.1
TOTAL COST WITH GST 444598.2
Say Rs/-- 4.446 Lacs
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA
(Ministry of Rural Development, Govt. of India )
Improvement Cost of Ex. Culvert
S.No. Item No ITEM DESCRIPTION NO L B D Quantity Rate Unit Amount in Rs/-
1 9.12 Tubular Steel Railing on Medium Weight Steel Channel (ISMC series) 100 mm x 50 mm Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 m high above ground, 2 m centre-to-centre, complete as per approved drawings Clause 1706
3.0 m SPAN SLAB CULVERT 4X2 2.50 40.00
6.0 m SPAN SLAB CULVERT 4X1 5.00 20.00
6.0 m 2SPAN SLAB CULVERT 4X0 5.00 0.00
6RX900MM DIA HPC 4X0 5.00 0.00
LONG SPAN BRIDGE 4X1 0.00 0.00
2 7.32 Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.
3.0 m SPAN SLAB CULVERT 2X2 4.00 32.00
6.0 m SPAN SLAB CULVERT 2X1 5.00 10.00
6.0 m 2SPAN SLAB CULVERT 2X0 15.00 0.00
6RX900MM DIA HPC 2X0 18.00 0.00
LONG SPAN BRIDGE 2X1 0.00 0.00
ADD 18% GST 0.00
TOTAL COST WITH GST 0.00
Say Rs/-- 0.000 Lacs
DPR Consultant Sub Engineer (CGRRDA PIU 01 Jagdalpur) Assistant Engineer (CGRRDA PIU 01 Jagdalpur)
PRADHAN MANTRI GRAM SADAK YOJANA
Estimate for construction of 1 Row 1000mm DIA NP3. & RD :- 5 M
S.No/SOR.No Description No. Length Breadth Hight/ Depth Quantity Unit Rate Amount
1/7.1 Excavation for Structures Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. `
(I) Ordinary Soil
i. Upto 3 m depth
Below pipes & Existing road 1 10.10 1.80 0.30 5.45
2/7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10(Nominal mix (1:3:6)
Foundation Concrete 2 6.20 1.90 0.15 3.53
4/7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II. P.C.C grade M 15(Nominal mix (1:2.5:5)
5/7.18 Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204
I. P.C.C grade M 15 (Nominal mix (1:2.5:5) cum 4031.00
Number Pillers 4 0.40 0.40 0.50 0.32
Deduction of opening of pipe 2 (Pi x 0.80 ^2) /4 (0.6+1.00) /2 -1.2
4/7.3 Bedding for Pipe
(ii) Type B ( First Class) Bedding
Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)
For haunches(Between face wall and around the hume pipe) 1 10.10 1.80 0.25 4.55
5/7.4(b) Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
10.5.II Cement concrete blocks of size as per Table 1300.2 cast in cement concrete of grade M 15 (a) Concrete grade M 15
Total 343310.00
ADD 18% GST 61795.80
TOTAL COST WITH GST 405105.80
Say (lakh) 4.05
DETILED DRAWING OF SINGLE ROW 1000 mm DIA NP-3 HUME PIPE CULVERT
HALF TOP & HALF BOTTOM PLAN
Shoulder base + Surfacing Soulder
EARTHEN COUSION Minimum 300 mm
Thickness 115mm
1000 mm Inside Dia
U/s Boulder Apron D/s Boulder Apron
1.20 SLOPE : 1 in 100
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 1.50M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- 920 M
Description of catchments: 0.125 Sq.km. Or Hectares 12.49
H.F.L - 99.25 Mtr.
L.B.L - 98.45 Mtr.
Depth of Water 'D' = 0.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 98.45 99.25 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
2.94 Cum / sec 22 in Western Ghats 0.8 -2.97 -3.77
Considering Maximum Allowed Velocity v = 2.50 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 1.18 Sqm.
Linear Waterway L= A/D = 1.48 m Say 1.50 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 1.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
96.65 m Provide foundation Level 96.65
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 1.50M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- 1875 M
Description of catchments: 0.123 Sq.km. Or Hectares 12.32
H.F.L - 99.25 Mtr.
L.B.L - 98.45 Mtr.
Depth of Water 'D' = 0.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 98.45 99.25 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
2.91 Cum / sec 22 in Western Ghats 0.8 -2.97 -3.77
Considering Maximum Allowed Velocity v = 2.50 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 1.16 Sqm.
Linear Waterway L= A/D = 1.45 m Say 1.50 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 1.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
96.65 m Provide foundation Level 96.65
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 1.50M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- 5455 M
Description of catchments: 0.120 Sq.km. Or Hectares 11.96
H.F.L - 99.25 Mtr.
L.B.L - 98.45 Mtr.
Depth of Water 'D' = 0.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 98.45 99.25 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
2.85 Cum / sec 22 in Western Ghats 0.8 -2.97 -3.77
Considering Maximum Allowed Velocity v = 2.50 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 1.14 Sqm.
Linear Waterway L= A/D = 1.43 m Say 1.50 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 1.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
96.65 m Provide foundation Level 96.65
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 1.50M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 0.173 Sq.km. Or Hectares 17.25
H.F.L - 99.25 Mtr.
L.B.L - 98.45 Mtr.
Depth of Water 'D' = 0.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 98.45 99.25 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
3.75 Cum / sec 22 in Western Ghats 0.8 -2.97 -3.77
Considering Maximum Allowed Velocity v = 2.50 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 1.5 Sqm.
Linear Waterway L= A/D = 1.88 m Say 1.50 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 1.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
96.65 m Provide foundation Level 96.65
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 1.50M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 0.173 Sq.km. Or Hectares 17.25
H.F.L - 99.25 Mtr.
L.B.L - 98.45 Mtr.
Depth of Water 'D' = 0.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 98.45 99.25 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
3.75 Cum / sec 22 in Western Ghats 0.8 -2.97 -3.77
Considering Maximum Allowed Velocity v = 2.50 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 1.5 Sqm.
Linear Waterway L= A/D = 1.88 m Say 1.50 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 1.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
96.65 m Provide foundation Level 96.65
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 1.50M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 0.173 Sq.km. Or Hectares 17.25
H.F.L - 99.25 Mtr.
L.B.L - 98.45 Mtr.
Depth of Water 'D' = 0.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 98.45 99.25 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
3.75 Cum / sec 22 in Western Ghats 0.8 -2.97 -3.77
Considering Maximum Allowed Velocity v = 2.50 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 1.5 Sqm.
Linear Waterway L= A/D = 1.88 m Say 1.50 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 1.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
96.65 m Provide foundation Level 96.65
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
DETAILED ESTIMATE OF R.C.C. SLAB CULVERT OF 3 Mtr. SPAN
Sr. No. SOR item no Description of Items No. Measurements Unit Qty. Rate Amt.
Leng. Width Thick
1 7.1 Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (I) Ordinary soil, i. Upto 3 m depth
2 (II) Ordinary rock (not requiring blasting) i. Upto 3 m depth
3 7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203, (I).P.C.C. grade M 10, (i) Nominal mix (1:3:6)
Cut-off Wall 2x2 2.30 1.40 0.20 2.58
4 7.18/ I Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204,For height upto 5 m, (I) P.C.C grade M 15 (Nominal mix (1:2.5:5)
5 7.27/ II Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5, (II) R.C.C M 25 (Design mix)
Abutment Cap AND WITH BEEM 2 7.50 0.700 0.200 2.10
6 7.31 Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 1 7.50 3.600 0.075 Cum 2.03 11782 23859
7 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Type of Bar Nos. Dia of Bar (in mm) Spacing Length of Bar Wt . Per Unit length Total Wt.(MT)
Main Reinforcement (Bottom) 60 16 125 3827 1.578 0.362
Main Reinforcement (Top) 26 10 300 3008 0.617 0.048
Distribution (Bottom) 21 10 175 7420 0.617 0.096
Distribution (Top) 13 10 300 7420 0.617 0.060
Cap & Dirt Wall(Main Bars) 24 12 210 7420 0.888 0.158
Cap & Dirt Wall(Stirrups) 74 8 200 3060 0.395 0.089
Temprature Reinforcement, (Vertical Direction) 144 8 200 1800 0.395 0.102
Temprature Reinforcement, (Horizontal Direction) 16 8 200 16040 0.395 0.101
8 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 35 NO 35.00 317.0 11095
9 7.23/ I Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8, (II) Granullar material 50% Quantity as per Item No. 7.1 109.138 1032.0 112630
10 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Behind Abutment 2 6.10 0.60 2.10 15.37
Behind Returns 4 4.05 0.60 2.10 20.41
11 7.41/ III Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications 2 7.50 RM 15.00 221.0 3315
12 7.41/ IV Providing and fillling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight. 2 7.50 RM 15.00 50.00 750
TOTAL COST Total 1719182
ADD 18% GST 309453
TOTAL COST WITH GST 2028635
Say (Rs in Lacs ) : 20.29
0.1 FOUNDATION hard stata
2.1 0.1 3.8 WING WALL
HALF TOP & HALF BOTTOM PLAN
RETURN 0.20 3.0 M-20
0.1 1.2 0.30m Thick M15 N.B.L.
0.20 2.5 Base Concrete M-10 IRC SP-20-2002
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 3.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- 700 M
Description of catchments: 0.304 Sq.km. Or Hectares 30.43
H.F.L - 96.07 Mtr.
L.B.L - 95.27 Mtr.
Depth of Water 'D' = 0.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 95.27 96.07 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
5.74 Cum / sec 22 in Western Ghats 0.8 0.21 -0.59
Considering Maximum Allowed Velocity v = 2.50 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 2.29 Sqm.
Linear Waterway L= A/D = 2.86 m Say 3.00 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 1.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
93.47 m Provide foundation Level 93.47
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 3.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 0.289 Sq.km. Or Hectares 28.85
H.F.L - 97.69 Mtr.
L.B.L - 96.89 Mtr.
Depth of Water 'D' = 0.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 96.89 97.69 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
5.51 Cum / sec 22 in Western Ghats 0.8 -1.41 -2.21
Considering Maximum Allowed Velocity v = 2.50 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 2.2 Sqm.
Linear Waterway L= A/D = 2.75 m Say 3.00 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 1.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
95.09 m Provide foundation Level 95.09
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 3.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 0.304 Sq.km. Or Hectares 30.43
H.F.L - 85.32 Mtr.
L.B.L - 84.52 Mtr.
Depth of Water 'D' = 0.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 84.52 85.32 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
5.74 Cum / sec 22 in Western Ghats 0.8 10.96 10.16
Considering Maximum Allowed Velocity v = 2.50 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 2.29 Sqm.
Linear Waterway L= A/D = 2.86 m Say 3.00 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 1.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
82.72 m Provide foundation Level 82.72
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 3.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 0.326 Sq.km. Or Hectares 32.58
H.F.L - 123.43 Mtr.
L.B.L - 122.63 Mtr.
Depth of Water 'D' = 0.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 122.63 123.43 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
6.04 Cum / sec 22 in Western Ghats 0.8 -27.15 -27.95
Considering Maximum Allowed Velocity v = 2.50 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 2.41 Sqm.
Linear Waterway L= A/D = 3.01 m Say 3.00 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 1.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
120.83 m Provide foundation Level 120.83
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 3.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 0.341 Sq.km. Or Hectares 34.06
H.F.L - 110.8 Mtr.
L.B.L - 110 Mtr.
Depth of Water 'D' = 0.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 110 110.8 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
6.24 Cum / sec 22 in Western Ghats 0.8 -14.52 -15.32
Considering Maximum Allowed Velocity v = 2.50 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 2.5 Sqm.
Linear Waterway L= A/D = 3.13 m Say 3.00 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 1.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
108.2 m Provide foundation Level 108.2
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 3.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 0.289 Sq.km. Or Hectares 28.85
H.F.L - 110.8 Mtr.
L.B.L - 110 Mtr.
Depth of Water 'D' = 0.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 110 110.8 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
5.51 Cum / sec 22 in Western Ghats 0.8 -14.52 -15.32
Considering Maximum Allowed Velocity v = 2.50 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 2.2 Sqm.
Linear Waterway L= A/D = 2.75 m Say 3.00 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 1.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
108.2 m Provide foundation Level 108.2
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
DETAILED ESTIMATE OF R.C.C. SLAB CULVERT OF 6 Mtr. SPAN
Sr. No. SOR item no Description of Items No. Measurements Unit Qty. Rate Amt.
Leng. Width Thick
1 7.1 Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (I) Ordinary soil, i. Upto 3 m depth
2 (II) Ordinary rock (not requiring blasting) i. Upto 3 m depth
3 7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203, (I).P.C.C. grade M 10, (i) Nominal mix (1:3:6)
Cut-off Wall 2x2 4.30 1.40 0.20 4.82
4 7.18/ I Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204,For height upto 5 m, (I) P.C.C grade M 15 (Nominal mix (1:2.5:5)
Cut-off Wall 2x2 4.30 1.40 0.20 4.82
5 7.27/ II Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5, (II) R.C.C M 25 (Design mix)
Abutment Cap 2 7.50 0.900 0.200 2.70
6 7.31 Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 1 7.50 6.800 0.075 Cum 3.83 11782 45066
7 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Type of Bar Nos. Dia of Bar (in mm) Spacing Length of Bar Wt . Per Unit length Total Wt.(MT)
Main Reinforcement (Bottom) 66 20 115 7016 2.466 1.142
Main Reinforcement (Top) 26 10 300 5340 0.617 0.086
Distribution (Bottom) 44 12 150 7420 0.888 0.290
Distribution (Top) 23 10 300 7420 0.617 0.105
Cap & Dirt Wall(Main Bars) 28 12 210 7420 0.888 0.184
Cap & Dirt Wall(Stirrups) 74 8 200 3420 0.395 0.100
Temprature Reinforcement, (Vertical Direction) 144 8 200 2400 0.395 0.137
Temprature Reinforcement, (Horizontal Direction) 16 8 200 19040 0.395 0.120
8 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 26 NO 26.00 317.00 8242
9 7.23/ I Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8, (II) Sandy material 50% Quantity as per Item No. 7.1 146.686 1032.0 151380
10 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Behind Abutment 2 5.90 0.60 2.48 17.56
Behind Returns 4 1.50 0.60 2.48 8.93
11 7.41/ III Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications 2 7.50 RM 15.00 221.00 3315
12 7.41/ IV Providing and fillling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight. 2 7.50 RM 15.00 50.00 750
ADD 18% GST 392055
TOTAL COST WITH GST 2570136
Say (Rs in Lacs ) : 25.70
0.1 FOUNDATION hard stata
2.55 0.1 1.2 WING WALL
HALF TOP & HALF BOTTOM PLAN
RETURN 0.20 6.0 M-20
0.1 1.5 0.30m Thick M15 N.B.L.
0.20 3.10 Base Concrete M-10 Plane-7.03
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 6.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- 1120 M
Description of catchments: 1.061 Sq.km. Or Hectares 106.14
H.F.L - 631.65 Mtr.
L.B.L - 629.85 Mtr.
Depth of Water 'D' = 1.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 629.85 631.65 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
14.64 Cum / sec 22 in Western Ghats 1.8 -534.37 -536.17
Considering Maximum Allowed Velocity v = 1.35 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 10.84 Sqm.
Linear Waterway L= A/D = 6.02 m Say 6.0 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 2.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
628.35 m Provide foundation Level 628.35
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 6.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 1.055 Sq.km. Or Hectares 105.46
H.F.L - 117.73 Mtr.
L.B.L - 115.93 Mtr.
Depth of Water 'D' = 1.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 115.93 117.73 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
14.57 Cum / sec 22 in Western Ghats 1.8 -20.45 -22.25
Considering Maximum Allowed Velocity v = 1.35 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 10.79 Sqm.
Linear Waterway L= A/D = 5.99 m Say 6.0 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 2.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
114.43 m Provide foundation Level 114.43
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 6.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 1.061 Sq.km. Or Hectares 106.14
H.F.L - 111.53 Mtr.
L.B.L - 109.73 Mtr.
Depth of Water 'D' = 1.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 109.73 111.53 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
14.64 Cum / sec 22 in Western Ghats 1.8 -14.25 -16.05
Considering Maximum Allowed Velocity v = 1.35 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 10.84 Sqm.
Linear Waterway L= A/D = 6.02 m Say 6.0 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 2.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
108.23 m Provide foundation Level 108.23
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 6.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 1.061 Sq.km. Or Hectares 106.14
H.F.L - 100.8 Mtr.
L.B.L - 99 Mtr.
Depth of Water 'D' = 1.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 99 100.8 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
14.64 Cum / sec 22 in Western Ghats 1.8 -3.52 -5.32
Considering Maximum Allowed Velocity v = 1.35 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 10.84 Sqm.
Linear Waterway L= A/D = 6.02 m Say 6.0 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 2.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
97.5 m Provide foundation Level 97.5
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 6.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 1.061 Sq.km. Or Hectares 106.14
H.F.L - 100.8 Mtr.
L.B.L - 99 Mtr.
Depth of Water 'D' = 1.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 99 100.8 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
14.64 Cum / sec 22 in Western Ghats 1.8 -3.52 -5.32
Considering Maximum Allowed Velocity v = 1.35 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 10.84 Sqm.
Linear Waterway L= A/D = 6.02 m Say 6.0 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 2.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
97.5 m Provide foundation Level 97.5
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 6.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 1.061 Sq.km. Or Hectares 106.14
H.F.L - 100.8 Mtr.
L.B.L - 99 Mtr.
Depth of Water 'D' = 1.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 99 100.8 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
14.64 Cum / sec 22 in Western Ghats 1.8 -3.52 -5.32
Considering Maximum Allowed Velocity v = 1.35 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 10.84 Sqm.
Linear Waterway L= A/D = 6.02 m Say 6.0 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 2.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
97.5 m Provide foundation Level 97.5
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
DETAILED ESTIMATE OF R.C.C. SLAB CULVERT OF 2 SPAN 6M Mtr. SPAN
Sr. No. SOR item no Description of Items No. Measurements Unit Qty. Rate Amt.
Leng. Width Thick
1 7.1 Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom a
(II) Ordinary rock (not requiring blasting) i. Upto 3 m depth
Cut-off Wall 2x2 4.30 1.40 0.20 4.82
2 7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203, (I).P.C.C. grade M 10, (i) Nominal mix (1:3:6)
3 7.10/ II Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (II) P.C.C grade M 15 (Nominal mix (1:2.5:5)
Cut-off Wall 2x2 4.30 1.40 0.20 4.82
7.9 Filling annular space around footing in rock as per technical specification Clause 1203.4.3.
P.C.C grade M 15 (Nominal mix 1:2.5:5)
Total Excavation in Rock Qty From Item 1 Above Cum 48.52
Deduction of Concrete Work on Rock Strata
4 7.18/ I Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204,For height upto 5 m, (I) P.C.C grade M 15 (Nominal mix (1:2.5:5)
5 7.27/ II Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5, (II) R.C.C M 25 (Design mix)
Abutment Cap 2 7.50 1.00 0.20 3.00
6 7.31 Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 2 7.50 7.000 0.075 Cum 7.88 11782.00 92783
7 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Type of Bar Nos. Dia of Bar (in mm) Spacing Length of Bar Wt . Per Unit length Total Wt.(MT)
Main Reinforcement (Bottom) 132 20 115 7298 2.466 2.376
Main Reinforcement (Top) 52 10 300 5340 0.617 0.171
Distribution (Bottom) 88 12 150 7420 0.888 0.580
Distribution (Top) 46 10 300 7420 0.617 0.211
Cap & Dirt Wall(Main Bars) 32 12 210 7420 0.888 0.211
Cap & Dirt Wall(Stirrups) 90 8 200 3420 0.395 0.122
Temprature Reinforcement, (Vertical Direction) 170 8 200 2400 0.395 0.161
Temprature Reinforcement, (Horizontal Direction) 24 8 200 19040 0.395 0.180
9 7.34 Providing and fixing in position pipe railing consisting of IS Rolled steel joist posts designation IS MB 100 (100x75) at 2.5 m interval and three rows of 50 mm dia steel pipes (light) including fixing in position on bridge deck complete as per drawing and technical specifications Clause 1208.2 2 25.40 Rm 50.80 2349.00 119329
10 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawin 78 NO 78.00 317.00 24726
11 7.23/ I Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8, (II) Sandy material 50% Quantity as per Item No. 7.1 230.741 1032.00 238125
12 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing
Behind Abutment 2 5.90 0.60 2.68 18.97
Behind Returns 4 4.75 0.60 2.68 30.55
13 7.41/ III Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications 4 7.50 RM 30.00 221.00 6630
14 7.41/ IV Providing and fillling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight. 4 7.50 RM 30.00 50.00 1500
ADD 18% GST COST 752270
TOTAL COST WITH GST 4931550
Say (Rs in Lacs ) : 49.32
DESIGN AS PER IRC-SP-20-2002, PLATE NO 7.06, 7.07
7.5 FOUNDATION hard stata
HALF TOP & HALF BOTTOM PLAN
0.1 1.6 0.30m Thick M15 0.30m Thick M15 N.B.L.
0.20 3.4 1.4 Base Concrete M-10
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 2X6.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 2.258 Sq.km. Or Hectares 225.83
H.F.L - 100.8 Mtr.
L.B.L - 99 Mtr.
Depth of Water 'D' = 1.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 99 100.8 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
25.79 Cum / sec 22 in Western Ghats 1.8 -3.52 -5.32
Considering Maximum Allowed Velocity v = 1.35 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 19.1 Sqm.
Linear Waterway L= A/D = 10.61 m Say 2X6.0 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 2.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
97.5 m Provide foundation Level 97.5
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 2X6.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 2.258 Sq.km. Or Hectares 225.83
H.F.L - 100.8 Mtr.
L.B.L - 99 Mtr.
Depth of Water 'D' = 1.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 99 100.8 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
25.79 Cum / sec 22 in Western Ghats 1.8 -3.52 -5.32
Considering Maximum Allowed Velocity v = 1.35 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 19.1 Sqm.
Linear Waterway L= A/D = 10.61 m Say 2X6.0 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 2.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
97.5 m Provide foundation Level 97.5
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 2X6.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 2.258 Sq.km. Or Hectares 225.83
H.F.L - 100.8 Mtr.
L.B.L - 99 Mtr.
Depth of Water 'D' = 1.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 99 100.8 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
25.79 Cum / sec 22 in Western Ghats 1.8 -3.52 -5.32
Considering Maximum Allowed Velocity v = 1.35 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 19.1 Sqm.
Linear Waterway L= A/D = 10.61 m Say 2X6.0 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 2.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
97.5 m Provide foundation Level 97.5
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 2X6.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 2.258 Sq.km. Or Hectares 225.83
H.F.L - 100.8 Mtr.
L.B.L - 99 Mtr.
Depth of Water 'D' = 1.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 99 100.8 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
25.79 Cum / sec 22 in Western Ghats 1.8 -3.52 -5.32
Considering Maximum Allowed Velocity v = 1.35 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 19.1 Sqm.
Linear Waterway L= A/D = 10.61 m Say 2X6.0 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 2.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
97.5 m Provide foundation Level 97.5
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
CALCULATION OF HYDRAULIC DISCHARGE
HYDRAULIC DESIGN OF 2X6.00M SPAN
Name of Road : - NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Block :- BASTAR
Distict : - BASTAR
Location of CD :- M
Description of catchments: 2.258 Sq.km. Or Hectares 225.83
H.F.L - 100.8 Mtr.
L.B.L - 99 Mtr.
Depth of Water 'D' = 1.8 Mtr.
DICKEN'S FORMULA
A- For Finding discharge dicken's formula is adopted. (For C.G. Plain Terrain )
B - For C.G. Terrain Coefficient of discharge = 14 to 19 where annual rainfall is more than 120cm
As per article 4.2 of IRC SP 13 (Dickens Formula) BED LEVEL HFL RTL
Q = C = 11 - 14 Where tha annual rain fall is 60 - 120 cm 99 100.8 95.48
C = 14 14 - 19 Where tha annual rain fall is more than 120 cm BED-HFL BED-RTL HFL-RTL
25.79 Cum / sec 22 in Western Ghats 1.8 -3.52 -5.32
Considering Maximum Allowed Velocity v = 1.35 m/sec (For Plain Terrain Area
Dishcharge Area A = Q/v = 19.1 Sqm.
Linear Waterway L= A/D = 10.61 m Say 2X6.0 m.
Formation level = HFL + Free Board + Decking + Slab Thickness 4.08 2.21
f = Silt factor = 1 As per table 7.1 of IRC SP 13
As per table 10.4 of IRC SP 13
R.L of Abutment wall = H.F.L - Scour Depth
Hard strata is 1.40m below NBL, so considering foundation level
97.5 m Provide foundation Level 97.5
As per RCC Slab Culvert :Table 7.5 , page 132 (IRC : SP20-2002)
Catchment Area (Hect.) Clear Span of Culvert,m
Consultant Sub-Engineer Asst.Eng. E.E.
PRADHAN MANTRY GRAM SADAK YOJANA (PMGSY) No of Row 5
(Ministry of Rural Development, Govt. of India) DIA 1.23
Detail Estimate of Vented causeway 5 rows 1000mm dia. Spacing 0.5
LOCATION : 4450 M Outer Dist 2.385
S. NO. Item No. ITEM DESCRIPTION No L B D Quantity RATE Unit Amount in Rs/- B L D Excavatin D PCC
1 7.1 Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary Soil (i) Up to 3 m depth Head Wall 1 1.2 5.00 2.20 1.70 0.2
2 7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C. grade M 10 (I) Nominal mix 1:3:6
Between Head Wall 2 5.30 6.40 0.30 20.35
3 7.3 (ii) Type B (First Class) Bedding Laying (First Class) bedding with well compacted sand, moorum or approved granular material as per Clause 1105 (ii)
Between pipe 1 10.23 5.89 1.23 74.11
Deduction Pipe Volume -5 1.19 5.89 -35.01
4 7.18 Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 P.C.C. grade M 15 (I) Nominal Mix 1:2.5:5
Guard Piller 4 0.40 0.40 0.60 0.38
Deduction Pipe Area 5 1.19 1.61 -9.56
5 7.4 Laying Reinforced Cement Concrete Pipe NP3 as per drawing and technical specification Clause 1402.6 Providing and laying reinforced cement concrete pipe NP3 for culverts on first Class bedding in single row including fixing with cement mortar 1:2 but excluding excavation, bedding protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
6 7.31 Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3
7 7.41 Filler Joint Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 1 5.02 5.02 399.00 M 2004.04
8 7.8 Filling in Foundation Trenches as per drawing and technical specification Clause 1108 & 305.3.9 I. Sand filling
9 10.1 Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
10 7.13 Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Cut of wall & wheel Guard @ 0.5% of Concrete 1 897.70 0.90 72036.00 Tonne 64667.01
11 10.5 Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
Say Rs/--- 18.26 Lacs
PRADHAN MANTRY GRAM SADAK YOJANA (PMGSY) No of Row 5
(Ministry of Rural Development, Govt. of India) DIA 1.23
Detail Estimate of Vented causeway 5 rows 1000mm dia. Spacing 0.5
LOCATION : 4450 M Outer Dist 2.385
S. NO. Item No. ITEM DESCRIPTION No L B D Quantity RATE Unit Amount in Rs/- B L D Excavatin D PCC
1 7.1 Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary Soil (i) Up to 3 m depth Head Wall 1 1.2 5.00 2.20 1.70 0.2
2 7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C. grade M 10 (I) Nominal mix 1:3:6
Between Head Wall 2 5.30 6.40 0.30 20.35
3 7.3 (ii) Type B (First Class) Bedding Laying (First Class) bedding with well compacted sand, moorum or approved granular material as per Clause 1105 (ii)
Between pipe 1 10.23 5.89 1.23 74.11
Deduction Pipe Volume -5 1.19 5.89 -35.01
4 7.18 Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 P.C.C. grade M 15 (I) Nominal Mix 1:2.5:5
Guard Piller 4 0.40 0.40 0.60 0.38
Deduction Pipe Area 5 1.19 1.61 -9.56
5 7.4 Laying Reinforced Cement Concrete Pipe NP3 as per drawing and technical specification Clause 1402.6 Providing and laying reinforced cement concrete pipe NP3 for culverts on first Class bedding in single row including fixing with cement mortar 1:2 but excluding excavation, bedding protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
6 7.31 Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3
7 7.41 Filler Joint Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications 1 5.02 5.02 399.00 M 2004.04
8 7.8 Filling in Foundation Trenches as per drawing and technical specification Clause 1108 & 305.3.9 I. Sand filling
9 10.1 Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
10 7.13 Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Cut of wall & wheel Guard @ 0.5% of Concrete 1 897.70 0.90 72036.00 Tonne 64667.01
11 10.5 Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
Say Rs/--- 18.26 Lacs
NAME OF ROAD :-NAWA RATENGA PARIPATPARA MUKHYAMARG TO BADE BADRENGA
Pavement Cost Details (Including GST)
Clearing Cost 4.54 Excavation Cost 2.35
Filling Cost 40.06 Sub Grade Cost 0.00
Shoulder Cost 15.79 15.79426445 Sub Granular Grade Cost 21.26
Soil Aggregate 0.00 WBM Grade-II 0.00
WMB Grade- III 0.00 WMM 63.56
Prime Coat 13.68 Tack Coat 4.63
BM DBM 0.00 OGPC SDBC BC 37.52
Seal Coat 13.24 Surface Dreassing 0.00
Dry Lean Concrete 0.00 Concrete Pavement 101.08
Pavement Cost Total 317.73 0.01 110.84
Other Cost Details (Including GST)
Pucca Side Drains 15.44
Number of CD Works 13 CD Works Cost (Total) 94.72
Protection Works Cost 46.63 Other Works Cost (Total) 0.00
Total Shines (Furniture) Cost 10.23 Total Cost (Excluding Higher Specification 484.73 38.71
Maintenance Cost
Year 1 (Rs Lakhs) 1.95 Year 2 (Rs Lakhs) 2.60
Year 3 (Rs Lakhs) 4.54 Year 4 (Rs Lakhs) 7.14
Year 5 (Rs Lakhs) 9.74 Renewal Cost (Rs Lakhs) 0.00
Total Maintenance 25.96
Statement showng the details of Component wise cost of roads proposed under PM-JANMAN(PVTG) Statement showng the details of Component wise cost of roads proposed under PM-JANMAN(PVTG)
(Length in Km and Amount in Lakhs)
Sl. No. District Block Name of Road Pkg. No. Existing Surface Type Proposed Surface Type Proposed Pavement Details (Rs. In Lakhs) CDs (Rs. In Lakhs) Protection works (Road Part) (Rs. In Lakhs) Other Works Cost Total Project Cost (Rs in Lakhs) (24+27+30+34) Average Cost (Rs in Lakhs) / km (36/12) Carriage Width (in m) Roadway Width Traffic Category ESAL (MSA) 5% Accredited New Technology 10% Non Accredited New Technology Name of Benifit PVTG Habitations
Earthen Gravel CC BT CC BT Total (10+11) Earthwork including Shoulders GSB WBM G-II WBM G-III WMM Prime Coat Tack Coat BM/DBM OGPC /SDBC/BC Seal Coat CC Other Total Cost Average Cost/ km (24/12) No. Total Cost Avg Cost/No (27/26) Avg Cost/km (28/12) Total Cost Avg cost / km (30/12) Side Drain Road Furniture including Road safety signs Total Cost Avg cost / km (34/12) Existing Proposed Name of Technology Length of Technology Name of Technology Length of Technology
Note: 1. All costs including GST 2. Waste Plastic is a New Technology but will not be included in the 15% Accredited/Non Accredited new technology. 0.00 C'!K37
Ambikapur Jashpur Pathalgaon Kanker Bhanu Kondagaon Keshkal Narayanpur
Sr. No. SOR Item No. DESCRIPTION OF ITEMS UNIT RATE (Rs.) RATE (Rs.) RATE (Rs.) RATE (Rs.)
1 2.1 Setting Out Setting Out work complete with construction of bench mark (Min 1 per km) working benchmark (Min 4 per km) and near all bridges and cross-drainage works made of bricks/stone masonary or concrete and reference pillars made of precast concrete poles/concrete filled 100 mm dia A.C.pipe @ 100 m interval of as required on both sides of the formation width, marking on centre line, setting out curves and recording of centre line levels and other required levels and distances etc. including setting out of crossdrainage structures & bridges with required reference pillars and marking etc. as directed by Engineer-in-Charge. Km 13949.00 14968.00 17962.00 20955.00
2 2.2 Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. Sqm 2.00 1.00 1.00 1.00
3 2.3 Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (A) In area of non-thorny jungle Sqm 7.00 5.00 6.00 7.00
4 2.4 Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. (Lead upto 1000 m) (i) Girth above 300 mm to 600 mm each 350.00 235.00 282.00 329.00
5 (ii) Girth above 600 mm to 900 mm each 605.00 420.00 504.00 588.00
6 (iii) Girth above 900 mm to 1800 mm each 1201.00 813.00 976.00 1138.00
7 2.6 (A) Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (A)Lime Concrete Cum 511.00 351.00 421.00 491.00
8 2.6 (C) Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (C)Reinforced Cement Concrete Cum 1263.00 1045.00 1254.00 1463.00
9 2.8 Dismantling Stone Masonry Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (A) Rubble Stone Masonry in Lime/Cement/mud mortar Cum 412.00 250.00 300.00 350.00
10 2.10 (A) Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. (A) Upto 600 mm dia M 256.00 164.00 197.00 230.00
11 2.10 (B) Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. (B) Above 600 mm to 900 mm dia M 346.00 222.00 266.00 311.00
12 2.10 (C) Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. (C) Above 900 mm dia M 592.00 380.00 456.00 532.00
13 2.11 Dismantling of cement concrete pavements and breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately, as per Technical Specification Clause. 202 Cum 2068.00 1680.00 2016.00 2352.00
14 3.1 Scarifying existing granular/bituminous surface upto a depth of 100 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. Sqm. 13 15 18 21
15 3.2 Compacting Original Ground / Existing Embankment. Loosening, Levelling and Compacting original ground/existing embankment/supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. Cum 25.00 21.00 25.00 29.00
16 3.8 (i) Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with all lift and lead of 50 m as per Technical Specification Clause 307. Cum 99.00 63.00 76.00 88.00
17 3.5 (i) Excavation in Cutting in Soil by manual/ Machinery means Excavation for roadway in soil for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 Cum. 65.00 65.00 78.00 91.00
18 3.5 (ii) Excavation in Soil by manual/Machinery means and Tippers with disposal upto 1000 m Excavation for roadwork in soil with manual/Machinery including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Cum. 85.00 85.00 102.00 119.00
19 3.9 Excavation in ordinary rock including loading in a truck and carrying of excavated material to embankment site with all lift and lead upto 50 m as per Technical Specification Clause 302.3.5. Cum. 287.00 184.00 221.00 258.00
20 3.3 (i) Construction of Embankment with Material Obtained from Roadway Cutting (i) Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Cum. 63.00 55.00 66.00 77.00
21 3.4 (ii) Construction of Embankment with Material Obtained from Pits Construction of embankment with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 (Beyond 250m)with all leads as per Technical Specification Clause 301.5(Having CBR more than 5) Cum. 222.00 176.00 211.00 246.00
22 3.12 (a) Construction of subgrade and earthen shoulders with approved material (Granular material having CBR not less than 7) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.For Item No.3.12(a) & (b) Cum 192.00 180.00 216.00 252.00
23 3.12 (b) Construction of subgrade and earthen shoulders with approved material (Granular material having CBR not less than 10) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.(To be used for side shoulder WBM) Cum 223.00 200.00 240.00 280.00
24 4.1 (a) Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) (a) Construction of granular sub-base by providing well graded material having CBR 20 or more, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory rollers of 80 to 100KN static weight to achieve the desired density, complete as per Technical Specification Clause 401. For Grading mentioned in table 400.1 (Grading III) Cum. 804.00 650.00 780.00 910.00
25 4.1 (d) Granular Sub-base with Well Graded Material (CBR 20 or more) (Table 400.1) Crushed stone materials (CBR 35 or more), This item is to be used only, where local GSB material or GSB material with blending with other material is not available. Cum. 1772.00 1150.00 1380.00 1610.00
26 4.8 Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. Cum. 1887.00 1478.00 1774.00 2069.00
27 5.1 Prime Coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 Sqm. 62.00 43.00 52.00 60.00
28 5.2 (iii) Tack Coat (iii) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Sqm. 21.00 13.00 16.00 18.00
29 5.13 20mm thick Open-Graded Premix Carpet using Bituminous Binder Mixing with processed Waste plastic (as per IRC:SP:98-2013) by replacement of 8% Bitumen binder by weight. Providing, laying and rolling of 20mm thick open-graded premix carpet (Thickness not less than 20 mm at any place) composed of 13.2 mm graded aggregate size @ 0.18 cum per 10 sqm & 11.2 mm graded aggregate size @ 0.09 cum per 10 sqm using with bitumenous binder @13.43Kg per 10 sqm (i.e. 92% of standard Bitumen and 8% waste processed plastic by weight shall be used for coating aggregate after its heating) as per IRC:SP:98-2013, laying to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 to be followed by seal coat of either Type A , Type B or Type C as per Technical Specification. (II) Bitumen (VG-30) Sqm. 170.00 128.00 154.00 179.00
30 5.3 20mm thick Open-Graded Premix Carpet using Bituminous (VG/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of aggregate 13.2mm size (passing 22.4mm size sieve & retained on 11.2mm sieve and 11.2mm size (passing 13.2mm sieve and retained on 5.6mm sieve) either using penetration grade/ VG bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Viscocity grade (VG) Bitumen specification as per IS 73:2006 (II) Bitumen (VG-30) Sqm. 166.00 122.00 151.00 171.00
31 5.5 Case II (B) Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510, Viscocity grade (VG) Bitumen specification as per IS 73:2006 Case - II : Type B (II)Bitumen (VG-30) Sqm. 60.00 43.00 52.00 60.00
32 7.10 Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Cum. 4576.00 3731.00 4378.00 5093.00
33 6.1 (ii) Cement Concrete Pavement Construction of un-reinforced, jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying, primer, sealant, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Cum. 5889.00 5097.00 6116.00 7136.00
34 6.8 Construction of Panel concrete, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed a in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibratos and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, admixture as approved, curing of concrete slabs for 14 days. Curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification Clause 1501. PCC Grade M-30 Each Panel (0.5 m x0.5m to 1.00m x 1.00m) thickness 100 mm. Cum. 6048.00 5680.00 6816.00 7937.00
35 9.16 Providing & Fixing of PMGSY 'Logo' board Providing and fixing of typical PMGSY logo board as per MoRD specifications and drawings. Each 6626.00 6626.00 7951.00 9276.00
36 9.21 (A) A typical design of PMGSY informatory Sign Board is shown in fig. 1700.1 The specification and installation details ofthe typical sign board are given below: (i)The board will be a composite unit consisting of three plates of Alumininm Composite Materials (ACM), material specifications are per Clause 1701.3.7 The top most plate will be in diamond shape of 600 mn x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size on back on edges. The middle plate will be 1200 mm 150 mm size riveted over welded rvr.s. angle iron frame of 25 mm x 25 nm x 5 mm size on back on edges. The main Iower most plate wiII be 1500 mn x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG ) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate wilt be flushed with the top of 75 nm dia medium steel tube posts and these posts will be embedded in cement concrete M 15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower nost plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders etc. of middle and bottom plate, pMGSy logo on top plates shall be as per clause 1701.4.6 messages/Borders. All the section of frame and posts will be painted with primer and two coats of Epoxy paint The steel tube below ground level will be painted with three coats of Epoxy paint The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sing in a contrasting colour or by stamping in characters not exceeding 50 mm in height. Each 17699.00 17699.00 17699.00 17699.00
37 9.15 (A) Providing and fixing 'Citizen Information Board' of PMGSY Project (A) Providing and fixing of typical " PMGSY Citizen Information Board" with Logo as per MoRD specifications & drawings, made of 75 mm square or 75 mm dia circular steel tube of 12 SWG 3.2 m height and cross member 2 nos 1m long, fixed with angle iron 50x50x5 mm MS angle on the back Each 14010.00 14015.00 16818.00 19621.00
38 9.21 (B) Cautionary, mandatory, informatory direction and place identification sign boards. Semi-Reflective Traffic signs more than 0.90 sqm sign board Providing and erecting direction and place identification of semi reflective sign boards as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade as per MORD specifications of required shade and colour. Supported and welded on two nos. 47 mm x 47 mm of 12 SWG square tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 Sqm. 6244.00 6244.00 6244.00 6244.00
39 9.8 (i) Kilometer Stone Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (I) 5th Kilometer Stone (precast) Each 3947.00 3700.00 4440.00 5180.00
40 9.8 (ii) Kilometer Stone Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (II) Ordinary Kilometer Stone (Precast) Each 2292.00 2194.00 2633.00 3072.00
41 9.8 (iii) Kilometer Stone Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (III) 200 m stone (precast) Each 660.00 463.00 556.00 648.00
41 9.9 Boundary Pillar Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704 Each 673.00 517.00 620.00 724.00
42 9.17 Guard Stone Reinforced cement concrete M15 grade Guard Stone of size 200 mm x 200mm x 800 mm fixing in position including painting and printing etc. as per drawing, Technical Specification and as per direction of Engineer in Charge. Each 525.00 472.00 566.00 661.00
43 9.18 Road marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorizing glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes.) Sqm 627.00 604.00 725.00 1266.00
44 9.19 (A) Speed Braker Providing and laying rounded hump type of Speed Breaker confirming to IRC – 99 and as per guidelines and drawings of NRRDA circular no. DO No. P-17019/6/2006/PII Dated 16 Sept 2009, including providing, laying and compaction of GSB, G II, G III, OGPC, Seal Coat Type B, as per specifications and appended drawing on both the sides of carriage way up to formation width maintaining rounded hump type shape with bituminous mix material i/c providing and painting of black and white strips, providing and fixing of two no. 600mm equilateral semi reflecting sign boards, i/c cost of all materials, labour T & P & Machinery etc complete and as directed by engineer in charge as per relevant clauses of MORD specifications. For 7.50 M Formation Width Each 22547.00 22547.00 27056.00 31566.00
45 7.6 (A) Providing and laying reinforced cement concrete pipe NP3 for Culverts/ Burried conduits on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106. (A) 600 mm dia RM 2928.00 2928.00 3514.00 4099.00
46 7.6 (D) Providing and laying reinforced cement concrete pipe NP3 for Culverts/ Burried conduits on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106. (D) 300 mm dia RM 1129.00
47 7.1 (i) Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i. Ordinary soil i. Upto 3 m depth Cum 394.00 253.00 304.00 354.00
48 10.5 Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 I. Stone/Boulder Cum 4667.00 1440.00 1728.00 2016.00
49 10.11 (iii) Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5 III.Cement concrete grade M 10 in case of concrete block pitching P.C.C grade M 10 (Nominal mix 1:3:6) Cum 4614.00 3648.00 4378.00 5107.00
50 3.5 (i) (i) Excavation in Cutting in Soil by manual means Excavation for roadway in soil for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 Cum 65.00 65.00 78.00 91.00
51 6.5 Construction of Plain Cement Concrete Drain with P.C.C. grade M-15 including all shuttering/form work etc. complete as per Cum 4970.00 3811.00 4573.00 5335.00
52 6.6 Construction of RCC open drain 0.60 m x 0.60 m inside dimension lined with 120 mm thick RCC M-20 walls, 120 mm thick CC M-20 foundation, over 100 mm thick (Av) levelling course in PCC M-15 including excavation, dressing of sides and bottom, provision of HYSD reinforcement consisting 8 mm dia horizontal bars @ 150 mm c/c and L-shaped 8 mm dia vertical bars @ 150 mm c/c (L=800 mm) including cutting, bending and binding wire, placing in position, providing shuttering and concreting by using concrete mixer, compaction by vibration etc complete as per drawings and technical specifications. Cum 2710.00
53 7.27 Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 II.R.C.C M 25 (Design mix) Cum 6498.00 4885.00 6268.00 6839.00
54 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MT 73726.00 54560.00 65472.00 76384.00
55 7.1 (i) Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i. Ordinary soil i. Upto 3 m depth Cum 394 253 304 354
56 7.1 (ii) Excavation for Structure as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (ii)Ordinary rock (not requiring blasting) i. Upto 3 m depth Cum 493 316 379 442
56 7.7 Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 Nominal Mix 1:3:6(with 40mm Graded metal Cum 4614 3648 4378 5107
57 7.9 Filling annular space around footing in rock as per technical specification Clause 1203.4.3. P.C.C grade M 15 (Nominal mix 1:2.5:5) Cum 4652 3665 4398 5131
58 7.10 (i) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I P.C.C grade M 10(Nominal mix (1:3:6) Cum 4614 3648 4378 5107
59 7.10 (ii) Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II P.C.C grade M 15(Nominal mix (1:2.5:5) Cum 4576 3731 4477 5093
60 7.18 (i) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m I P.C.C grade M 15 (Nominal mix (1:2.5:5) Cum 4839 3848 4618 5387
61 7.18 (ii) Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m II P.C.C grade M 20 (Nominal mix (1:2:4) Cum 5384 4316 5179 6042
62 7.27 (i) Providing and laying concrete for reinforced cement concrete in superstructure as per drawing and technical specification Clause 800,1205.4 & 1205.5 I. R.C.C grade M 20 (i) For nominal mix 1:2:4 Cum 6157 4885 5862 6839
63 7.27 (ii) Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 II.R.C.C M 25 (Design mix) Cum 6498 5223 5753 6712
64 7.28 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MT 73726 54560 65472 76384
65 7.22 Providing weepholes in brick masonry/stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 Nos. 317 239 287 335
68 7.23 (i) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 I) Granular material Cum 1032 732 878 1025
69 7.23 (ii) Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 II) Sandy material Cum 1564 1145 1374 1603
70 7.24 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3. Cum 1751 1291 1549 1807
71 10.1 Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 Cum 1619 1440 1728 2016
72 10.6 Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 Cum 1923 1660 1992 2324
73 7.3 7.3 Bedding for Causeway/Pipe (II) Type B (First Class) Bedding Laying (First Class) bedding with well compacted sand, moorum or approved granular material as per Clause 1105 (ii) Cum 1200 911 1093 1275
74 7.31 Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 Cum 11782 9091 10909 12727
75 7.4b Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 1000 mm dia m 5468 5558 5558 6485
76 7.34 Providing and fixing in position pipe railing consisting of IS Rolled steel joist posts designation IS MB 100 (100x75) at 2.5 m interval and three rows of 50 mm dia steel pipes (light) including fixing in position on bridge deck complete as per drawing and technical specifications Clause 1208.2 RM 2349 1774 2129 2484
67 7.35 Drainage spouts complete as per drawing and technical specifications Clause 1209 Nos 2075 1511 1813 2115
66 7.41 (ii) Filler Joint (II)Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications RM 399 308 370 431
75 7.41 (iii) Filler Joint Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications RM 221 141 169 197
76 7.41 (IV) Filler Joint Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight. RM 50 35 42 49
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.11 MB
5423138219147850775_153496_1278507194557121433_80616_Guidelines to Bidders.pdf
NIT • 0.13 MB
1633229162728653076_198623_NIT 1188 Tender Document MMGSVY Road.pdf
NIT • 1.60 MB
5799980255478197618_198623_BOQ-Nawa ratenga Paripatpara.xlsx
BOQ • 1.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .