Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.1 LAccepted-AOC GRAM AND POST LAKHUN TEHSIL DHAURHARA LAKHIMPUR KHERI | L1 | Accepted-AOC Lowest Quoted Amount | |
| 2 | L2₹71.9 L+₹74,834.27 (1.05%)Rejected-Finance | L2 | Rejected-Finance Not Lowest Quoted Amount | |
| 3 | Rejected-Technical | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | M S DHERENDRA KUMAR PANDEY L2 | M/S SHRI RAM SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling old, damaged & broken pucca work incl. all cost of labour T&P (Brick work Abutment ) | 49.53 | Cum | 430 ₹21,297.9 Lowest | 430 ₹21,297.9 Lowest |
| 2.00 | Dismantling old, damaged & broken pucca work incl. all cost of labour T&P (C.C. work) | 35.81 | Cum | 900 ₹32,229 Lowest | 900 ₹32,229 Lowest |
| 3.00 | Consolidation of old Brick Ballast by hand Ramping on Approach Road | 24.78 | Cum | 350 ₹8,673 Lowest | 350 ₹8,673 Lowest |
| 4.00 | Earth work in foundation including all cost of labour, material T&P etc. | 1,481.16 | Cum | 100 ₹1,48,116 Lowest | 100 ₹1,48,116 Lowest |
| 5.00 | Laying C.C 1:3:6 in fdn with 20 to 40 mm size stone ballast including all cost of material labour and T&P | 196.7 | Cum | 5,589 ₹10,99,356.3 Lowest | 5,589 ₹10,99,356.3 Lowest |
| 6.00 | M-150 class brick work in 1:4 cement Mortar incl all cost of material labour T&P | 200.91 | Cum | 5,812 ₹11,67,688.92 | 5,810 ₹11,67,287.1 Lowest |
| 7.00 | Centering & shuttering for RCC work including all cost of labour material T&P | 1,035.36 | Sqm | 840 ₹8,69,702.4 Lowest | 840 ₹8,69,702.4 Lowest |
| 8.00 | Supplying & placing steel reinforcement in position inc. cutting, bending & binding with all cost of material, labour & T&P | 6.94 | M.T | 64,131 ₹4,45,069.14 | 64,130 ₹4,45,062.2 Lowest |
| 9.00 | R.C.C. 1:1.5:3 with 10-20 mm size stone grit incl. all cost of labour, material & T&P etc | 103.95 | Cum | 7,411 ₹7,70,373.45 | 7,410 ₹7,70,269.5 Lowest |
| 10.00 | C.C. 1:1:2 in wearing coat with 10-20 mm size stone grit including cost of all material and labour T&P etc. as per direction of ingineer In charge | 13.42 | Sqm | 8,411 ₹1,12,875.62 | 8,410 ₹1,12,862.2 Lowest |
Tender Value
₹72 L
EMD Value
₹1.4 L
Closing Date
4 Jun 2026, 12:00 pmClosed
S. E. I.W.C. Kanpur
Office of the S.E. IWC 98 Canal Colony Kanpur
Work of reconstruction/rehabilitation of concrete structures of Sujanpur canal in Fatehpur district.
2026_UPIDC_1146813_9
06/SE/2026-27
Open Tender
Civil Works
Item Rate
365 days
Fatehpur
Technical Bid
2 documents required · 2 mandatory
₹2,720
₹1.4 L
22 Oct 2026
29 May 2026
4 Jun 2026
29 May 2026
4 Jun 2026
29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old, damaged & broken pucca work incl. all cost of labour T&P (Brick work Abutment ) | 49.53 | Cum | - | - |
| 2 | Dismantling old, damaged & broken pucca work incl. all cost of labour T&P (C.C. work) | 35.81 | Cum | - | - |
| 3 | Consolidation of old Brick Ballast by hand Ramping on Approach Road | 24.78 | Cum | - | - |
| 4 | Earth work in foundation including all cost of labour, material T&P etc. | 1,481.16 | Cum | - | - |
| 5 | Laying C.C 1:3:6 in fdn with 20 to 40 mm size stone ballast including all cost of material labour and T&P | 196.7 | Cum | - | - |
| 6 | M-150 class brick work in 1:4 cement Mortar incl all cost of material labour T&P | 200.91 | Cum | - | - |
| 7 | Centering & shuttering for RCC work including all cost of labour material T&P | 1,035.36 | Sqm | - | - |
| 8 | Supplying & placing steel reinforcement in position inc. cutting, bending & binding with all cost of material, labour & T&P | 6.94 | M.T | - | - |
| 9 | R.C.C. 1:1.5:3 with 10-20 mm size stone grit incl. all cost of labour, material & T&P etc | 103.95 | Cum | - | - |
| 10 | C.C. 1:1:2 in wearing coat with 10-20 mm size stone grit including cost of all material and labour T&P etc. as per direction of ingineer In charge | 13.42 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.05 MB
TenderDocumentLot03.pdf
Tender Documents • 1.66 MB
BOQ_2164355.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .