Tender Value
₹55.6 Cr
EMD Value
₹1.1 Cr
Closing Date
16 Apr 2026, 1:00 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
Yes
27/03/2026 12:00
Lowest to Highest
90 days
Expenditure
Capital Works)
CSTE PROJ
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V = Advertised value of the tender in crores of Rupees. N = Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure- VIB (IR GCC), along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. For details please see GCC April'2022 with latest correction slips.
Similar nature of works required as qualifying criteria: Panel Work (Indoor+Outdoor) or RRI Work (Indoor) or RRI Work (Indoor+Outdoor) or EI/SSI Work (Indoor) or EI/SSI Work (Indoor + Outdoor).
22 conditions · 14 needing a document upload
Please read Correction slip no. 11 to the GCC-2022. It has some significant changes in the earlier sets of rules. Some important points are: 1. EMD amount change from 0.5% to 2%. 2. Now, only works of up to 40% of the CA value can be assigned to sub-contractors (earlier it was 50%). 3 . Additional BG of 5% of the CA value has to be given if tender is accepted on quoted rate below the 5% of the bid value. 4. Now bid capacity is required to be submitted from & above of tender value 10.0 Cr (earlier it was 20.0 Cr. 5. Illegal gratification & punitive provisions.
The tenderer whether sole proprietor/ a company or a partnership firm/ registered society / registered trust / HUF / LLP etc. if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association /Board resolution, failing which tender shall be summarily rejected. For other details please follow GCC-2022 with latest correction slip.
Please refer tender document for details.
Information regarding Employment/ Partnership etc. of Retired Railway Employees has to be submitted as per IRGCC-2022 along with latest correction slip.
Only confirmation/declaration about submission of Year wise rate for AMC of EI is to be Uploaded here. The year wise for 5 years (after warranty period) has to be submitted with joint signature of OEM & Contractor. This will be required before signing of contract Agreement. With bid, a declaration in this regard is mandatory.
Break-up of Card/ module with unit cost for EI has to be given. This will be required before signing of contract Agreement. With bid, a declaration in this regard is mandatory.
Please submit Annexure-VIB- Annual Contractual Turnover Data for the Previous 3/4 Years (Contractual Payment Only) of your firm with joint signature of CA and authorized signatory of your firm. Without this, your offer will be rejected.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Conditional tender will be summarily rejected.
Any amendment and corrigendum issued from time to time shall be made available on website http://www.ireps.gov.in at least 15 days before the date of closing. All prospective tenderer(s) are advised to see the website for corrigendum/addendum issued, if any. Bidders will be able to submit their original/revised bids up to closing date & time only.
The 'NIT', 'Conditions', 'Annexures, Forms & Other proformas','Tender Document' along with all the attachments will be considered as the'Tender Document' for this work. All the above mentioned documents taken together if not scored off, shall constitute the complete tender document herein after referred to as "Tender Document" & have to be read together & acted upon accordingly. No part of the tender document can be relied upon or acted upon in isolation.
Right of Railway to Deal with Tenders: The Railway reserves the right of not to invite tenders for any of Railway work or works or to invite open or limited tenders and when tenders are called to accept a tender in whole or in part or reject any tender or all tenders without assigning reasons for any such action. In case if tender is accepted in part by Railway administration, Letter of Acceptance shall be issued as counter offer to the Tenderer, which shall be subject to acceptance by the Tenderer.
The tender offer complete in all respect and with all documents is to be submitted (in PDF Format) online by e-tendering process through the website www.ireps.gov.in up to the closing date & time as mentioned in the NIT. Manual offers are not allowed against this tender and any such manual offer received shall be summarily rejected.
Please follow all the guidelines given in IRGCC April 2022 with all the latest issued correction slips (ACS) up to date of inviting tender.
All S&T works excluding the construction of building for Replacement of old Electronic Interlocking with new Electronic Interlocking at Shyamchak, Balichak, Haur, Bhogpur, Fuleshwar and Mourigram Flyover Block Hut in Kharagpur Division.
ST-PROJ-KGP-HWH-6EI-R
ST-PROJ-KGP-HWH-6EI-R
Open
Works - General
365 Days
Kolkata, West Bengal
₹0
₹1.1 Cr
16 Apr 2026
17 Mar 2026
2 Apr 2026
27 Mar 2026
311 items across 11 schedules · ₹55,62,06,414.7 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| per This stages as from work, per the (1) (4) and plan, & (9) Any per online LED joint Joint Way, (xii) (xiii) (xv) etc. made wiring or file Wiring be be | — | — | — | — | |
| 1 | Station | 6.00 | — | 38,738 | 2,32,428 |
| 2 | Rules Set the draft and for be | 6.00 | — | 13,595 | 81,570 |
| 3 | Rules Set of the draft and for be | 6.00 | — | 13,595 | 81,570 |
| 4 | Numbers with after | 36.00 | — | 522 | 18,792 |
| 5 | in Numbers with after | 36.00 | — | 522 | 18,792 |
| 6 | Rules Set the draft and for be | 5.00 | — | 7,308 | 36,540 |
| 7 | rules Set of gate by draft and for be | 5.00 | — | 7,308 | 36,540 |
| 8 | Numbers with after | 72.00 | — | 391 | 28,152 |
| 9 | in Numbers gate with after | 72.00 | — | 391 | 28,152 |
| soils of & out soil after issued latest are width, be | — | — | — | — | |
| 10 | Kilometre | 6.00 | — | 95,893 | 5,75,358 |
| 11 | Kilometre | 22.50 | — | 79,869 | 17,97,052.5 |
| 12 | Kilometre | 3.00 | — | 70,930 | 2,12,790 |
| 13 | Metre in a and (for 2019 SEM sieved and length of also the the | 1000.00 | — | 589 | 5,89,000 |
| 14 | soils Metre of of 1 as latest and (for to or of (for and & S&T This of | 600.00 | — | 1,211 | 7,26,600 |
| 15 | soils Metre of of 1 of to as and pipes cable No. by latest and after | 3310.00 | — | 691 | 22,87,210 |
| 16 | kacha Metre by and dia. and of pipe IS: SEM NP2 will | 300.00 | — | 446 | 1,33,800 |
| 17 | inside Metre 170 cable or work cable sizes and 72 by be In are width, be | 250.00 | — | 256 | 64,000 |
| 18 | of Metre and cable or Note: sand, the chase than | 300.00 | — | 146 | 43,800 |
| 19 | of Metre in for utility site | 600.00 | — | 257 | 1,54,200 |
| 20 | of Metre (for bore 2004 on as of as cables at and be with cm also GI | 486.00 | — | 1,018 | 4,94,748 |
| 21 | of Metre IS: plain collar (inner over the | 600.00 | — | 225 | 1,35,000 |
| 22 | Metre Spec. split (inner over the | 600.00 | — | 308 | 1,84,800 |
| 23 | or Drum-Km of that for | 785.00 | — | 2,328 | 18,27,480 |
| 24 | Kilometre or 'U' 10 trench and to latest cable at as by to stock | 785.00 | — | 20,239 | 1,58,87,615 |
| 25 | Kilometre Cable of SE of per cable to & 100 the the its | 33.00 | — | 34,734 | 11,46,222 |
| 26 | in Hour earth of or with be & in shall | 36.00 | — | 995 | 35,820 |
| 27 | the Numbers track more be be | 120.00 | — | 117 | 14,040 |
| 28 | Numbers track be Note: | 120.00 | — | 118 | 14,160 |
| 29 | of Numbers bricks per | 28000.00 | — | 8 | 2,24,000 |
| 30 | with Numbers work, to strip as of other cables cable wire, inside of two and This 25 as minor site shall bolts with & inside for Part after (ii) - - | 290.00 | — | 9,147 | 26,52,630 |
| 31 | Numbers & per the etc | 46.00 | — | 2,734 | 1,25,764 |
| 32 | 2- Numbers per SEM- with other posts, in of per RDSO to latest | 30.00 | — | 10,788 | 3,23,640 |
| 33 | - Numbers per 19-D3 or base, of in of with of as of above 226 be | 48.00 | — | 11,520 | 5,52,960 |
| on | — | — | — | — | |
| 34 | Four Numbers | 57.00 | — | 1,193 | 68,001 |
| 35 | Numbers or latest other per in and & per A/M | 15.00 | — | 5,101 | 76,515 |
| 36 | ON Numbers / post | 62.00 | — | 2,367 | 1,46,754 |
| 37 | of Numbers with site | 195.00 | — | 196 | 38,220 |
| 38 | Numbers Unit per the as be | 255.00 | — | 1,099 | 2,80,245 |
| 39 | Numbers of LED type, | 540.00 | — | 926 | 5,00,040 |
| 40 | and Numbers 19- 600 iii) The the | 24.00 | — | 8,535 | 2,04,840 |
| 41 | Numbers board This depth the the the | 12.00 | — | 5,101 | 61,212 |
| 42 | Numbers Multi | 24.00 | — | 2,692 | 64,608 |
| 43 | Numbers & M.S. to units, on PVC and rack wiring as by as rack and extra | 46.00 | — | 47,638 | 21,91,348 |
| 44 | fixing Numbers ladder of fixing and the & of and HV caps be for cable work, MS per X Nickel and sheet, mm, paint colour and 60mm of by | 29.00 | — | 51,944 | 15,06,376 |
| 45 | on Numbers and fixing along to board, tag bars, with of cable and tilting (Q- : 20 100% above & | 22.00 | — | 21,225 | 4,66,950 |
| 46 | Set inputs No. | 6.00 | — | 18,574 | 1,11,444 |
| 47 | Set logger input No. | 18.00 | — | 39,600 | 7,12,800 |
| 48 | Set 6 to when point within train | 6.00 | — | 7,458 | 44,748 |
| 49 | Numbers on & on The sheet, by | 60.00 | — | 1,553 | 93,180 |
| 50 | Set No. or dated | 18.00 | — | 60,074 | 10,81,332 |
| 51 | Set power on by of be the | 18.00 | — | 43,881 | 7,89,858 |
| and for per per at at of of water and to | — | — | — | — | |
| 52 | Numbers | 747.00 | — | 405 | 3,02,535 |
| 53 | and Set on per latest work Rails, of wires, set etc.), also lead track Track | 134.00 | — | 7,932 | 10,62,888 |
| 54 | Set as latest work Rails, of wires, set etc.), also lead track Track | 115.00 | — | 8,108 | 9,32,420 |
| 55 | of Per Detection Point (DP) No. & as (later to cell, SOR | 290.00 | — | 15,019 | 43,55,510 |
| 56 | of Numbers fixed with on fixed cleats, by and holes be | 122.00 | — | 13,523 | 16,49,806 |
| 57 | and Set pit, of for all boom of rest gate (two) the Fixing of | 6.00 | — | 53,846 | 3,23,076 |
| 58 | and Set if All the & | 6.00 | — | 49,416 | 2,96,496 |
| 59 | and Set cum motor /Non- line | 6.00 | — | 6,062 | 36,372 |
| 60 | fixing Numbers of No. to etc. for used at This salt, be flat be | 350.00 | — | 1,791 | 6,26,850 |
| 61 | Free Set SDO the of b) and by (c) Earth slurry out single 200 out the on 35 The for be firms, (g) of finish, per RCC X earth the paint | 120.00 | — | 6,098 | 7,31,760 |
| 62 | Set Earth No. no. (a) 3.0 with 250 No. 30-35 x x | 115.00 | — | 12,612 | 14,50,380 |
| 63 | of Metre mm out the two 3 the avoid Earth along the | 350.00 | — | 90 | 31,500 |
| 64 | X 2 Metre fixed mm, of studs | 350.00 | — | 90 | 31,500 |
| 65 | the Metre room cable steel work them be | 1750.00 | — | 58 | 1,01,500 |
| 66 | SPDs Metre MEEB using and and / The by | 340.00 | — | 58 | 19,720 |
| 67 | least Metre mm PVC supply 35 as 6mm the 60mm | 580.00 | — | 90 | 52,200 |
| 68 | X Metre Note- SEBB, | 580.00 | — | 218 | 1,26,440 |
| 69 | Surge Set All the | 105.00 | — | 443 | 46,515 |
| 70 | Numbers No. per the the | 100.00 | — | 611 | 61,100 |
| 71 | Set Earth as | 18.00 | — | 5,947 | 1,07,046 |
| NI least yard b) from during of and sets, the the if for for by of box in NI officer Free per any to | — | — | — | — | |
| 72 | Station | 6.00 | — | 1,16,634 | 6,99,804 |
| signal but and of the TLBI/ fixing of on as of vii) | — | — | — | — | |
| 73 | Station | 6.00 | — | 61,037 | 3,66,222 |
| such FPL, other LC site the to to a are & | — | — | — | — | |
| 74 | Station | 6.00 | — | 63,434 | 3,80,604 |
| 75 | Square Foot board with at The of for paper be after the print of The soft drive of fixing | 60.00 | — | 776 | 46,560 |
| 76 | 1:2:4 cum 20mm works. CC 3.8 for the | 60.00 | — | 4,145 | 2,48,700 |
| 77 | 1:3:6 cum 25mm works. CC 3.8 for the | 60.00 | — | 3,647 | 2,18,820 |
| 78 | 1:6 cum sand each bricks the | 60.00 | — | 2,048 | 1,22,880 |
| 79 | MCB Set with a AT | 30.00 | — | 490 | 14,700 |
| Schedule total | ₹5,36,47,600.5 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tentative SIP MRGM
ATTACHMENT
Fuleshawar_rotated.pdf
ATTACHMENT
Tentative SIP BOP
ATTACHMENT
HAUR_rotated.pdf
ATTACHMENT
Tentative SIP Balichak
ATTACHMENT
Tentative SIP Shyamchak
ATTACHMENT
JPOFinal.pdf
ATTACHMENT
GCC-2022.pdf
ATTACHMENT
GCC2022ACS1to10.pdf
ATTACHMENT
Inspection Authority of materials
ATTACHMENT
ACS-11TOGCC_compressed.pdf ACS 11 to GCC 2022
ATTACHMENT
commondoubtsandanswers.pdf Common Doubts and answers
ATTACHMENT
TenderDocumentEI6Stn-ST.pdf
ATTACHMENT
MRMGFLYOVER-11381Alt-A_rotated.pdf
ATTACHMENT
BhogpurSWRD-11361Alt-A_rotated_compressed.pdf
ATTACHMENT
BalichakSWRD-11551Alt-B_rotated_compressed.pdf
ATTACHMENT
ShymchakSWRD-11556Alt-A_rotated_compressed.pdf
ATTACHMENT
6Stations-InspectionAuthority.pdf
ATTACHMENT
ACS-11TOGCC_compressed.pdf
ATTACHMENT
commondoubtsandanswers.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .