Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-Finance 24 42 1 B BHATAI NEW COLONY NAINI PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 211001 | L1 | Accepted-Finance Low Rate | |
| 2 | L2₹2.5 L+₹2,310 (0.93%)Rejected-Finance | L2 | Rejected-Finance High Rate | |
| 3 | Rejected-Technical | - | Rejected-Technical Document found not ok |
| Sl No | Description | Qty | Unit | SAI ENTERPRISES L1 | M/S A.V. POWER CONSTRUCTION CO. L2 |
|---|---|---|---|---|---|
| 1.00Supply of following materials:- Construction of new 33 kv line to connect 33 kv mishrain and 33 kv abholi line from Bhatevara Nahar to Bhikhampur (Ikoni) under EDD-Bhadohi total O/H - 1.1 KMthe works site as per RESSPO norms. (Provided by Contractor) | |||||
| 1.01 | Bolts, Nuts & Washers | 20 | Kg. | 110 ₹2,200 Lowest | 110 ₹2,200 Lowest |
| 1.02 | F-bracket for 33 KV for PCC/STP | 20 | No. | 130 ₹2,600 Lowest | 130 ₹2,600 Lowest |
| 1.03 | E-Bracket for 33 kv for PCC/STP | 25 | No. | 130 ₹3,250 Lowest | 130 ₹3,250 Lowest |
| 1.04 | PG clamp | 20 | No. | 180 ₹3,600 Lowest | 180 ₹3,600 Lowest |
| 1.05 | Cross arm holding clamp with bolts & nuts for PCC/STP | 18 | No. | 110 ₹1,980 Lowest | 110 ₹1,980 Lowest |
| 1.06 | Stay insulaor | 18 | No. | 60 ₹1,080 Lowest | 60 ₹1,080 Lowest |
| 1.07 | Stay clamp for PCC/STP | 18 | Set | 120 ₹2,160 Lowest | 120 ₹2,160 Lowest |
| 1.08 | Top channel clamp and Dropper channel clamp of DP with bolts & nuts for PCC/STP | 40 | No. | 110 ₹4,400 Lowest | 110 ₹4,400 Lowest |
| 1.09 | Gaurding angle clamp with bolts & nuts for PCC/STP (Market Survey Rate) | 10 | No. | 110 ₹1,100 Lowest | 110 ₹1,100 Lowest |
Tender Value
Refer Docs
EMD Value
₹2,500
Closing Date
18 Jun 2026, 12:00 pmClosed
Superintending Engineer Electricity Work Circle,
Superintending Engineer Electricity Work Circle, Fataha, Mirzapur
Construction of new 33 kv line to connect 33 kv mishrain and 33 kv abholi line from Bhatevara Nahar to Bhikhampur
2026_PVVNV_1154190_1
05/EWC(M)/2026-27
Open Tender
Electrical Works
Lump-sum
60 days
Superintending Engineer Electricity Work Circle, F
Please Refer Tender Document
2 documents required · 2 mandatory
₹1,180
Superintending Engineer Electricity Work Circle
₹2,500
23 Jun 2026
26 May 2026
18 Jun 2026
26 May 2026
18 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply of following materials:- Construction of new 33 kv line to connect 33 kv mishrain and 33 kv abholi line from Bhatevara Nahar to Bhikhampur (Ikoni) under EDD-Bhadohi total O/H - 1.1 KMthe works site as per RESSPO norms. (Provided by Contractor) | |||||
| 1.01 | Bolts, Nuts & Washers | 20 | Kg. | - | - |
| 1.02 | F-bracket for 33 KV for PCC/STP | 20 | No. | - | - |
| 1.03 | E-Bracket for 33 kv for PCC/STP | 25 | No. | - | - |
| 1.04 | PG clamp | 20 | No. | - | - |
| 1.05 | Cross arm holding clamp with bolts & nuts for PCC/STP | 18 | No. | - | - |
| 1.06 | Stay insulaor | 18 | No. | - | - |
| 1.07 | Stay clamp for PCC/STP | 18 | Set | - | - |
| 1.08 | Top channel clamp and Dropper channel clamp of DP with bolts & nuts for PCC/STP | 40 | No. | - | - |
| 1.09 | Gaurding angle clamp with bolts & nuts for PCC/STP (Market Survey Rate) | 10 | No. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
TenderDocument33KVLineBhadohi.pdf
Tender Documents • 0.89 MB
BOQ_2162024.xls
BOQ • 0.32 MB
corrigendum116.pdf
PDF • 0.22 MB
corrigendum114.pdf
PDF • 0.22 MB
DATEEXTENSIONLetter.pdf
PDF • 0.22 MB
corrigendum105.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .