| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M.Maridurai L1 |
|---|---|---|---|---|
| 1.00 | Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc., as per SS 20 A for making up berms as per clause 111,112,201,202,301,305,900of MORTH Vth revision. | 3,560 | M3 | 18.85 ₹67,106 Lowest |
| 2.00 | Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) Grade I specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 404 of MORTH specifications. | 1,294 | M3 | 1,819 ₹23,53,786 Lowest |
| 3.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 6 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 503 of MORTH Specifications | 8,625 | M2 | 75.35 ₹6,49,893.75 Lowest |
| 4.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 8,625 | M2 | 16.8 ₹1,44,900 Lowest |
| 5.00 | Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and compaction by 80-100 KN power roller to the required density etc.including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks,paver finisher, power rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. | 432 | M3 | 9,858.85 ₹42,59,023.2 Lowest |
| 6.00 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste from garbage collected at free of cost (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 40 mm with mechanical paver to the specified grades and cross sections and compaction by 80-100 KN power roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks,paver finisher, power rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. | 259 | M3 | 10,711.9 ₹27,74,382.1 Lowest |
| 7.00 | Supply delivery and filling of Red Gravel in layer of not more than 15 cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyence of sand at Site and all labour charges and all other incidential charges etc,. complete as per Standard Specification _ 1 Cum. | 210 | M3 | 529.5 ₹1,11,195 Lowest |
| 8.00 | Providing Thermoplastic paint including cost and conveyence and all labour charges and all other incidential charges etc,. complete as per Standard Specification _ 1 Cum. | 460 | M3 | 891 ₹4,09,860 Lowest |
| 9.00 | Clearing and Grubbing by Light jungle removing and disposing of all materials ,such as bushes ,shrubs,staumps ,roots ,grass ,weeds ,top organic soil not exceeding 150mm in thickness as rubbish including all other inicidental charges etc.complete as per MORTH Specification 111,112,201 - Upkeeping 1st year (50%) | 1,380 | M2 | 5.55 ₹7,659 Lowest |
| 10.00 | Upkeeping 2nd year (60%) | 1,656 | M2 | 5.55 ₹9,190.8 Lowest |
Tender Value
₹1.8 Cr
EMD Value
₹1.8 L
Closing Date
24 Mar 2023, 3:00 pmClosed
EXECUTIVE OFFICER
Kallidaikurichi Town Panchayat
Strengthening of Existing Damaged BT Road to BT road to Pump House Road in Kallidaikurichi Town Panchayat
2023_DTP_293955_1
A1/69/2022
Open Tender
Civil Works - Roads
Works
90 days
Kallidaikurichi Town Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.8 L
Yes
Kallidaikurichi Town Panchayat
1 Apr 2023
8 Mar 2023
24 Mar 2023
9 Mar 2023
24 Mar 2023
13 Mar 2023
13 Mar 2023
Amount
Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc., as per SS 20 A for making up berms as per clause 111,112,201,202,301,305,900of MORTH Vth revision.
Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) Grade I specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 404 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 6 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and compaction by 80-100 KN power roller to the required density etc.including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks,paver finisher, power rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications.
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste from garbage collected at free of cost (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 40 mm with mechanical paver to the specified grades and cross sections and compaction by 80-100 KN power roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks,paver finisher, power rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications.
Supply delivery and filling of Red Gravel in layer of not more than 15 cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyence of sand at Site and all labour charges and all other incidential charges etc,. complete as per Standard Specification _ 1 Cum.
Providing Thermoplastic paint including cost and conveyence and all labour charges and all other incidential charges etc,. complete as per Standard Specification _ 1 Cum.
Clearing and Grubbing by Light jungle removing and disposing of all materials ,such as bushes ,shrubs,staumps ,roots ,grass ,weeds ,top organic soil not exceeding 150mm in thickness as rubbish including all other inicidental charges etc.complete as per MORTH Specification 111,112,201 - Upkeeping 1st year (50%)
Upkeeping 2nd year (60%)
Upkeeping 3rd year (60%)
Upkeeping 4th year (60%)
Upkeeping 5th year (60%)
Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc., as per SS 20 A for making up berms as per clause 111,112,201,202,301,305,900of MORTH Vth revision (Twice in a year ). - Up keeping for 1st year (40%)
Upkeeping 2nd year (40%)
Upkeeping 3rd year (40%)
Upkeeping 4th year (40%)
Upkeeping 5th year (40%)
Providing and laying tack coat of 2 kgs/10 sqm bituminous Emulsion (RS -I Type )for 10 square meter area ion the preapared bituminious granular surface cleaned with mechanical broom as per clause 503. - 4th year 3%
5th year 3%
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 50.30 kgs for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 40 mm with mechanical paver to the specified grades and cross sections and compaction by 80-100 KN power roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks,paver finisher, power rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. - 4th year 3%
5th year 3%
Earthwork excavation for foundation in all soils and sub soils in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and to full depth as may be directed,except in hard rock,requiring blasting including shoring and shuttering and bailing out of water wherever necessary,refilling the sides of foundation with excavated earth or sand in layer of not more than 15cm thick.well rammed and consolidated and depositing on bank with initial lead and lift of 10m & initial lift of 2m and depositing the surplusr earth within the compound in places shown by the departmental officers with iniital lead and lifts,clearing and levelling the site etc., complete as per SS20B and as directed by departmental Engineers(TNBP No.17,23,24).
Cement concrete of mix 1:4:8 using 40mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification
Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30 - Below 1mt
Plain Cement Concrete 1:2:4 Mix (one part cement, three part sand and six part of aggrigate) using 40% of 40mm size and 60% of 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BidDocument.pdf
Tender Documents • 0.86 MB
BOQ_348925.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .