Executive Officer, Memari-II PS
Memari II Panchayat Samity, Paharhati, Purba Bardhaman
Construction of ACR at Nanna Mrinalini Debi F.P. School under Bijur-II GP within Memari-II Development Block
2025_ZPHD_940545_3
WB/BWN/MEMARI-II/NIT 105/2025-26
Open Tender
CIVIL WORKS
Percentage
180 days
Nanna, Bijur II, Memari
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,058
₹24,233
18 Dec 2025
7 Nov 2025
1 Dec 2025
7 Nov 2025
27 Nov 2025
7 Nov 2025
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm.
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Ordinary Cement concrete (mix 1:3:6) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety
25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification
Brick work with 1st class bricks in cement moter (1:6)
Brick work with 1st class bricks in cement moter (1:6)
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).
b) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. ( SRMB/ELEGANT STEEL CAPTAIN, BALAJI SHAKTI, HEXA, RUNGTA STEEL, ADHUNIK, SUPER SHAKTI, SALUJA GOLD, RASHMI TMT, SEL, SEL TIGER)
125mm thick brick work with 1st class bricks in cement morter (4:1)
Wood work in door and window frame fitted and fixed in position complete
Iron socket bolt of approved quality fitted and fixed complete
d) 225mm long x 10mm dia bolt
c) 150mm long x 10mm dia bolt
Iron hasp bolt of approved quality fitted and fixed complete (oxidised) with 16mm dia rod with centre bolt and round fitting.
Anodised aliminium D-type handle of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 230/72) fitted and fixed complete:
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour.
Styles and rails of wooden shutters fitted and fixed complete. (Payment to be made on area of new work only). In Ground Floor:
M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).
(a) 10 mm thick plaster (1:4)
(b) 15 mm thick plaster (1:4)
(c) 20 mm thick plaster (1:6)
(d) 15 mm thick plaster (1:6)
Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc. NOTE : Cement 0.152 cu.m. per 100 sq.m.
White washing including cleaning and smoothening surface thoroughly.
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification.
Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
Painting with best quality synthetic enamel paint of approved makeand brand including smoothening surface by sand------- on the surface, if necessary :On steel or other metal surface :
(a) On timber or plastered surface :
(b) On steel or other metal surface :
Supplying, fitting & fixing UPVC pipes and fittings conforming to IS:13592-1992 with all --------------- (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete.
A) UPVC Pipes: (i) 110 mm. Dia
Cost of Ramp
Add cost of Electrification
Add cost of Furniture
Add GST @ 18.0 %
Add CESS @ 1.00 %
Add bellow Contingency @ 3.00 %
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.38 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
NIT105.pdf
Tender Documents • 1.91 MB
BOQ_2224881.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .