Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.3 LAccepted-AOC T P ROAD DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | ₹7.3 L | L-1 | Accepted-AOC Accepted as a L-1 bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not eligible for pricebid opening |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not eligible for pricebid opening |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not eligible for pricebid opening |
| Sl No | Description | Qty | Unit | META ELECTRIC L1 |
|---|---|---|---|---|
| 1.00 | Cleaning and De-carbonization of Primary conductor | 525 | Kg. | 9 ₹4,725 Lowest |
| 2.00 | Cleaning and De-carbonization of Secondary conductor | 470 | Kg. | 9 ₹4,230 Lowest |
| 3.00 | New copper conductor to be used primary coil 525 Kg x 876 = 459900, New copper conductor to be used at secondary coil 470Kg x 876= 411720, Total (1050 Kg Rs. 8,71,620). Less scrap vale primary & secondary coil 945 Kg x 508 = 480060. Amount after less scrap ( 871620 - 480060) = 3,91,560 | 1 | NOS. | 3,91,560 ₹3,91,560 Lowest |
| 4.00 | Re-insulation of Primary conductor | 525 | Kg. | 38 ₹19,950 Lowest |
| 5.00 | Re insulation of old secondary conductor | 470 | Kg. | 38 ₹17,860 Lowest |
| 6.00 | Reformation of primary coils | 525 | Kg. | 59 ₹30,975 Lowest |
| 7.00 | Reformation of secondary coils | 470 | Kg. | 59 ₹27,730 Lowest |
| 8.00 | Complete set of Tap changer | 1 | NOS. | 10,000 ₹10,000 Lowest |
| 9.00 | Charges for added jobs like de tanking, removing of top cores, removing of coils from limbs, removing of old coils on limbs after inspection, supply of insulation like prespond, varnish, ete. Placing of reformed coils properly over the limbs, refitting of top cores & assembling of unit soldering & connection, baking & driout, electricity charges etc. | 1 | NOS. | 8,500 ₹8,500 Lowest |
| 10.00 | Copper studs with insulator replacement | 6 | NOS. | 4,000 ₹24,000 Lowest |
Tender Value
₹7.3 L
EMD Value
₹9,100
Closing Date
1 Sept 2025, 5:00 pmClosed
General Manager, Kunustoria Area
O/o The General Manager, Kunustoria Area, P.O. Toposi, Paschim Bardhaman, 713362, (W.B)
complete repairing/rewinding of 2MVA, 11KV/3.3KV transformer of Kunustoria Colliery.
2025_ECL_341873_1
ECL/KNT/EnM/e-Ten/25-26/10 dt. 14.08.2025
Open Tender
Miscellaneous Works
Item Rate
15 days
Kunustoria Colliery
As per NIT
5 documents required · 5 mandatory
₹9,100
18 Jun 2026
21 Aug 2025
2 Sept 2025
21 Aug 2025
1 Sept 2025
22 Aug 2025
21 Aug 2025 - 25 Aug 2025
Amount
Cleaning and De-carbonization of Primary conductor
Cleaning and De-carbonization of Secondary conductor
New copper conductor to be used primary coil 525 Kg x 876 = 459900, New copper conductor to be used at secondary coil 470Kg x 876= 411720, Total (1050 Kg Rs. 8,71,620). Less scrap vale primary & secondary coil 945 Kg x 508 = 480060. Amount after less scrap ( 871620 - 480060) = 3,91,560
Re-insulation of Primary conductor
Re insulation of old secondary conductor
Reformation of primary coils
Reformation of secondary coils
Complete set of Tap changer
Charges for added jobs like de tanking, removing of top cores, removing of coils from limbs, removing of old coils on limbs after inspection, supply of insulation like prespond, varnish, ete. Placing of reformed coils properly over the limbs, refitting of top cores & assembling of unit soldering & connection, baking & driout, electricity charges etc.
Copper studs with insulator replacement
Necessary glass sleeve backlite tube to be replaced at connection side
H.T. tape other insulation like mica nomex to be fitted all copper jumper! and other connection sides.
Becelite ring (Big & small)
Overhead profit @ 10%
Total impact of GST for the purpose of CTC
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .