| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹19.2 L+₹39,274.58 (2.09%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹21.2 L+₹2.5 L (13.2%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹21.5 L+₹2.7 L (14.4%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹24.2 L+₹5.4 L (28.7%)Rejected-AOC | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | P PICHANDI L5 | V MANI L2 | U.Abhishekwaran Contractor L3 | VICTORY CONSTRUCTIONS L1 | umamaheswaran L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Arcot Block | ||||||||
| 2.00Providing of Cement Concrete Pavement With Drainage at Krishnapuram ADC Branch Road H/o Tajpura Panchayat in Arcot Block Ranipet District | ||||||||
| 3.00 | Earth work excavation and depositing on bank with initial lead and lift in Hard stiff clay,stiff black cotton,hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per SS 20B | 159.48 | Cum | 350 ₹55,818 | 50 ₹7,974 | 100 ₹15,948 | 131.89 ₹21,033.82 | 1.2 ₹191.38 Lowest |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance and all labour charges etc | 91.98 | Cum | 7,000 ₹6,43,860 | 5,200 ₹4,78,296 | 4,800 ₹4,41,504 | 3,000 ₹2,75,940 | 666 ₹61,258.68 Lowest |
| 5.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete | 63 | Cum | 1,500 ₹94,500 | 1,000 ₹63,000 | 2,300 ₹1,44,900 | 1,000 ₹63,000 | 480 ₹30,240 Lowest |
| 6.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 63 | Cum | 120 ₹7,560 Lowest | 120 ₹7,560 Lowest | 1,800 ₹1,13,400 | 280.34 ₹17,661.42 | 500 ₹31,500 |
| 7.00 | Supply and erecting for sides and soffis including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges Core Wall | 207 | Sqm | 290 ₹60,030 | 182.5 ₹37,777.5 | 350 ₹72,450 | 182.5 ₹37,777.5 | 1.4 ₹289.8 Lowest |
| 8.00 | Supply and erecting for sides and soffis including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges Drainage | 432 | Sqm | 750 ₹3,24,000 | 547.5 ₹2,36,520 | 350 ₹1,51,200 Lowest | 800 ₹3,45,600 | 3,700 ₹15,98,400 |
| 9.00 | Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 49.68 | Cum | 6,500 ₹3,22,920 | 5,500 ₹2,73,240 | 6,500 ₹3,22,920 | 6,000 ₹2,98,080 | 360 ₹17,884.8 Lowest |
| 10.00 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 73.13 | Cum | 6,890.28 ₹5,03,886.18 | 6,890.28 ₹5,03,886.18 | 6,500 ₹4,75,345 | 6,500 ₹4,75,345 | 470 ₹34,371.1 Lowest |
Tender Value
Refer Docs
EMD Value
₹24,430
Closing Date
24 Feb 2026, 3:00 pmClosed
Arcot BDO Office
Arcot BDO Office
Providing of Cement Concrete Pavement With Drainage at Krishnapuram ADC Branch Road H/o Tajpura Panchayat in Arcot Block Ranipet District
2026_RDTN_658186_1
B1/1606/2022
Open Tender
Civil Works
Item Rate
30 days
Arcot BDO Office
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹24,430
8 May 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Arcot Block | - | - | - | - |
| 2 | Providing of Cement Concrete Pavement With Drainage at Krishnapuram ADC Branch Road H/o Tajpura Panchayat in Arcot Block Ranipet District | - | - | - | - |
| 3 | Earth work excavation and depositing on bank with initial lead and lift in Hard stiff clay,stiff black cotton,hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per SS 20B | 159.48 | Cum | - | - |
| 4 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance and all labour charges etc | 91.98 | Cum | - | - |
| 5 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete | 63 | Cum | - | - |
| 6 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 63 | Cum | - | - |
| 7 | Supply and erecting for sides and soffis including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges Core Wall | 207 | Sqm | - | - |
| 8 | Supply and erecting for sides and soffis including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges Drainage | 432 | Sqm | - | - |
| 9 | Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 49.68 | Cum | - | - |
| 10 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 73.13 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
TB.pdf
Tender Documents • 0.36 MB
BOQ_789565.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .