RequiredOEM Authorization Certificate Bid to RA enabled No Drinking Water ATM/Water Vending Machine ( 5 pieces ) ( Under PAC ) Make proteck Model proteck500litremodel2 Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) COIN/CARD ACCEPTOR/Quantity of Dispensing Water Number of Dispensing points 2 2 Water Dispensing using coin acceptor Yes Yes Coins accepted for Rs.1
RequiredRs. 2
RequiredRs. 5
RequiredRs.10 Rs.1
RequiredRs. 2
RequiredRs. 5
RequiredRs.10 1/10 payment Water Dispensing using RFID/NFC card Yes Yes Mobile Wallet accepted for payment No No Quantity of Dispensing Water Configurable as Per Customer Requirement * CAPACITY/TYPE WATER SOURCE OUTLET WATER QUALITY Purification Capacity of Water ATM 500 LPH 500 LPH Type of Operation Semi-Automatic Semi-Automatic Water Source Municipal Tap water Municipal Tap water Quality of outlet water from each dispenser of the Water ATM Conforms to IS:10500(latest) * TECHNOLOGY Technology Reverse Osmosis (RO) Reverse Osmosis (RO) UV Disinfectation No No "Filters deployed in the system Pressure Sand Filter
RequiredAcitivated Carbon Filter
Required10 Micron Filter
Required5 micron Filter
RequiredThin- Film Composite Membrane Pressure Sand Filter
RequiredAcitivated Carbon Filter
Required10 Micron Filter
Required5 micron Filter
RequiredThin- Film Composite Membrane Anti scalant dosing pump Yes Yes pH Correction Dosing Pump Yes Yes LIMITING CHARACTERISTICS OF INLET/FEED WATER TDS of inlet/feed water (ppm) Upto 500 ppm Upto 500 ppm Turbidity of inlet/feed water Upto 1 NTU Upto 1 NTU Hardness of inlet/feed water Upto 200 ppm Upto 200 ppm pH of inlet/feed water 6.5 to 8.5 6.5 to 8.5 Iron content of inlet/feed water Upto 1 ppm Upto 1 ppm Arsenic content of inlet/feed water Upto 0.01 ppm Upto 0.01 ppm Fluoride content of inlet/feed water Upto 1 ppm Upto 1 ppm CONSTRUCTIONAL Raw water Storage capacity 500 500.0 Raw water Storage Tank Material of Construction HDPE HDPE 2/10 Location of the Raw Water Storage Tank Inside the ATM Enclosure Inside the ATM Enclosure Treated water Storage capacity 500 500.0 Treated water Storage Tank Material of Construction Stainless Steel
Required304 Gr Stainless Steel
Required304 Gr Equipped with an in- built chiller unit for providing continuous cold water of temperature around 15 degree Celcius Yes Yes In-built Chiller Tank Capacity 220 220.0 Chiller Tank Material of Construction Stainless Steel
Required304 Gr Stainless Steel
Required304 Gr ATM Installation Type Floor mounted * Number of Filtration steps 5 5 Minimum Water Recovery Percentage @27 degree ambient temperature (%) 41-50 41-50 Provided with suitable vending place for filling container of 20 liters capacity Yes Yes Agreed to STC of the product category Yes * DISPLAY Display of water purity parameters No * Display Type NA NA Backlit Display No No Touch Screen Display No No Display Size (Characters x Lines) NA NA Display of oulet water TDS level No No Display of outlet water pH level No No Display of outlet water Hardness No No Display of outlet No No 3/10 water Temperature Inlet/Feed Pump to feed water from raw water storage tank to filter Inlet/Feed Pump Type Horizontal Centrifugual Horizontal Centrifugual Number of Inlet/Feed Pumps 1 * Rated Head 35 * "Pump Motor Rating (HP) 3 * Inlet/Feed Pump Capacity at rated head (LPH) 4000 * Pump Motor/Head (HP) 3 * Multi Media Filter Vessels for First stage filtration for suspended particles Type of Multi Media Filter Vessels Vertical Multi Media Filter * Material Of Construction for Multi Media Filter Vessels FRP FRP Number of Multi Media Filter Vessels 1 * Size of Multi Media Filter Vessels 35 * Multi-Port Valve to control filtration and backwash for media filter having sand & carbon Type of Multi-Port Valve Automatic Automatic Multi-Port Valve Material of Construction ABS ABS Number of Multi-Port Valves 1 * Nominal Bore (Size) of Multi-Port Valve 55 * Anti scalent Dosing Pump to inhibit scaling of hardness salt and silica on RO Membranes
Requireddoze pH and Cl as per water quality Type of Anti scalent Dosing Pump Electronic diaphragm Electronic diaphragm Material Of Construction for Anti scalent Dosing Pump ABS ABS Number of Anti scalent Dosing Pumps 1 * Capacity of Anti scalent Dosing Pump (LPH) 5 * pH Correction Dosing Pump & Dosing Tank to dilute water with dosing chemicals Type of pH Correction Pump Electronic diaphragm Electronic diaphragm Material Of Construction for pH Correction Dosing Pump ABS ABS 4/10 Number of pH Correction Dosing Pumps 1 * Capacity of pH Correction Dosing Pump (LPH) 5 * Dosing Tank Material of Construction HDPE HDPE Dosing Tank Capacity (LPH) 35 * High Pressure Pump to develop required pressure for Reverse Osmosis on RO Membranes Type of High Pressure Pump Vertical Centrifugual Pump Vertical Centrifugual Pump Material Of Construction for High Pressure Pump PP * Number of High Pressure Pumps 1 * Low pressure switch for Protection of HP pump from burn-out Yes Yes RO Pressure Vessel Type of RO Pressure Vessel Membrane housing mounted on skid - End port type Membrane housing mounted on skid - End port type Material Of Construction for RO Pressure Vessel FRP FRP Number of RO Pressure Vessels 1 * Ultra Violet (UV) System to disinfect water
Requiredkill bacteria and micro-organisms Material Of Construction for UV System NA NA Number of UV Systems 0 * Number of UV Lights 0 * Total UV Power NA NA CIP (Clean-In- Place)Tank to mix Dilute chemicals for membrane cleaning and permeate back wash Cip Tank No No CIP Tank Material of Construction NA NA Number of CIP Tanks 0 * Capacity of CIP Tank 0 * Piping Material of Construction for Piping from storage tank to Raw water inlet
Requiredtotal internal piping HPP side Low Pressure side
Requiredplant to product tank & through UV distribution ISI Marked U-PVC * 5/10 system Power Source Power Source Water ATM shall be able to work on AC Power. Water Dispensing section shall also be able to work on DC Power supply from a battery. Battery is inclusive in the scope of supply. * Power Supply 230 ±10 V AC 230 ±10 V AC Battery Voltage 6 V * Battery Chemistry SMF * Battery Capacity (AH) 40 * Battery back-up time 6 6.0 EMBEDDED DEVICES FOR AUTOMATION Quantitative Monitoring Number of Glasses of water dispensed in a day
RequiredNumber of Bottles of water dispensed in a day
RequiredNA Number of Glasses of water dispensed in a day
RequiredNumber of Bottles of water dispensed in a day
RequiredNA Outlet Water Quality Monitoring NA NA Multi-Processor Integrated Control System with Interface cables connectors for integration Operator Log-in and log- out feature;
RequiredSystem to operate after successful operator login only Operator Log-in and log- out feature;
RequiredSystem to operate after successful operator login only OTHER FEATURES NA NA Additional features
Requiredif any PASSWORD PROTECTED * Water ATM - Enclosure Structure Rigid structure
Requiredmade of MS frame Rigid structure
Requiredmade of MS frame Thickness of the frame of structure 2 2.0 Material of Construction of Side Panels of Water ATM Galvanized Steel sheet Galvanized Steel sheet Side Panel Sheet Thickness 0.8 0.8 PUF insulation of Side Panels of Water ATM Without Without PUF insulation of the door of Water ATM Without Without Provision for in-built litter space No No 6/10 Covered area of treatment plant enclosure 60 * Shape of the Water ATM housing Cuboidal Cuboidal Top Canopy of the Water ATM housing Sloped Sloped Floor area around the unit covered with vitrified/anti-skid tiles (Specify area of the tiles) 18 * Headroom for the Water ATM enclosure 7 * Internal/External finish on Steel panels As per Buyer requirements * Floor area around the Water ATM enclosure covered with anti-skid tiles No No Water ATM enclosure protected with enclosed MS grill/mesh Yes Yes Installation & Commissioning Warranty Installation and Commissioning inclusive in the scope of Supply Yes Yes Trial Run and Training provided (inclusive in the Scope of Supply) 5 5
Required10 Or higher Warranty for storage Tanks 1 1
Required2
Required3 Or higher Warranty for electrical motors 1 1
Required2
Required3 Or higher Warranty for the filters 1 1
Required2
Required3 Or higher Warranty for the system 1 1
Required2
Required3 Or higher * Bold specifications are the golden parameters. * Bidders may note that In respect of non-golden Parameters
Requiredthe specifications 'Values' chosen by Buyer will generally be preferred over 'Bid requirement ( allowed Values) by the Buyer.