Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.8 LAdmitted-Finance | -5.51% | ₹23.8 L | L1 | Admitted-Finance |
| 2 | L2₹24.0 L+₹16,576.25 (0.70%)Admitted-Finance 421 6 NEAR DURGA ASHRAM CHATTARPUR SOUTH WEST DELHI SOUTH WEST DELHI DELHI 110074 | SOUTH DELHI | DELHI | 110074 | -5.13% | ₹24.0 L+₹16,576.25 (0.70%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KAMAL AND COMPANY L2 | KUBER ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying well-brunt slightly over burnt brick of minimum strength 75. kg. per sqcm for brick edging upto 23 cm deep and 11.5 cm wide brick size23x11.5x7.5 cm including digging of trenches, fixing bricks in position, refilling and disposal of surplus earth etc. complete | 1,500 | Rmt | 90 ₹1,35,000 | 85 ₹1,27,500 Lowest |
Tender Value
₹24.9 L
EMD Value
₹49,900
Closing Date
17 Aug 2026, 6:00 pmClosed
Executive Engineer
RSAMB Bikaner
Construction of kissan path 12 H Mohala to 1R Govt. Primary School (Length 0.750 KM) KUMS Kesrisinghpur
2026_RSAMB_583606_4
NIB No 04/2026-27
Open Tender
Civil Works
Percentage
90 days
Kesrisinghpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
A/C 07342040000350 Executive Engineer RSAMB
₹49,900
Yes
19 Aug 2026
7 Aug 2026
19 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Bill No. - 01 (Site clearance ) | - | - | - | - |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. : By Manual Means : In area of non-thorny jungle | 0.15 | P.Hect. | 25,455 | ₹3,818.25 |
| 3 | Bill No. - 02 ( Earth work ) | - | - | - | - |
| 4 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | 1,125 | cum | 45 | ₹50,625 |
| 5 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 1,125 | cum | 25 | ₹28,125 |
| 6 | Bill No. - 03 (Sub base & base course) | - | - | - | - |
| 7 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means.:For Grading-I Material | 287 | P.cum | 1,069 | ₹3,06,803 |
| 8 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. : For grading III material. | 115 | P.cum | 880 | ₹1,01,200 |
| 9 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening & binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 1 as per MoRTH Specification Clause 404. : WBM Grading I : Using Crusher Broken Aggregate : By Manual Means | 215 | P.cum | 1,485 | ₹3,19,275 |
| 10 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate : WBM Grading II : By Manual Means | 215 | P.cum | 1,514 | ₹3,25,510 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
AgreementKSPR.pdf
Tender Documents • 6.19 MB
CorrectnessCertificateKSPR.pdf
Tender Documents • 0.02 MB
BOQ_1036605.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .