Loading…
Loading…
Tender Value
₹7.0 L
EMD Value
₹14,500
Closing Date
7 Jul 2026, 4:00 pm6d left
Similar tender results from the same govt authority in the past 3 years.
Neeraj Kumar Singh
Lower Division Agra Canal Agra
Reconsruction of V.R.B(Box Culvert) at Km. 13.300 of Jajau dy.
2026_UPIDC_1164851_1
02/EE/2026-27
Open Tender
Civil Works
90 days
Reconsruction of V.R.B(Box Culvert) at Km. 13.300
Reffer Tender Document
3 documents required · 3 mandatory
₹266
₹14,500
Yes
30 Jun 2026
30 Jun 2026
8 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
30 Jun 2026 - 7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches. | 38 | Cum | - | - |
| 2 | Providing and Laying Cement Concrete M-15 and curing complete I/C all cost of material,labour and T.& P. etc. complete. As directed by the Engineer-in-charge | 14.9 | Cum | - | - |
| 3 | Providing and Laying Reinforced Concrete M-25 and curing complete I/C all cost of material,labour and T.& P. etc. complete. As directed by the Engineer-in-charge | 18.7 | Cum | - | - |
| 4 | Centering & Shuttering for R.C.C. work including cost of centering and shuttering up to 3 m height .As directed by the Engineer-in-charge | 143 | Sqm | - | - |
| 5 | Providing and Laying Reinforced Concrete M-20 and curing complete I/C all cost of material,labour and T.& P. etc. complete. As directed by the Engineer-in-charge | 1.26 | Cum | - | - |
| 6 | Cutting, Bending, Binding cutting & Placing of reinforcement including binding wire also including cost of steel Fe 500.As directed by the Engineer-in-charge | 1.84 | MT | - | - |
| 7 | Local sand filling in making of sub-grade i/c cost of all labour,material and T&P etc.as directed by Engineer- in-Charge. | 2.2 | Sqm | - | - |
| 8 | Dry Stone pitching hand packed including labour and T&P also including cost of all material as directed by the Engineer-in-charge | 2.9 | Cum | - | - |
| 9 | Finishing walls with exterior emulsion paint of required shade in two coat i/c supply of all labour,material and T&P required for proper completion of work.as directed by the Engineer-in-charge | 6.8 | Sqm | - | - |
| 10 | Supplying & fixing PVC Pipe 75 mm dia with all cost of material,labour and T.& P. etc. complete.as directed by the Engineer-in-charge | 4 | RM. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.37 MB
BOQ_2184731.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid