Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
5 Mar 2022, 3:00 pmClosed
EE,NMD-6(ND-11)NORTH ZONE,DDA
EE,NMD-6(ND-11)NORTH ZONE,DDA
Demolition of 25/24 janta staff quarter without land at Pitampura H(P) Block (Specialized work).
2022_DDA_675811_1
16 /EE/NMD-6/DDA/2021-22
Open Tender
Civil Works
Works
30 days
ASHOK VIHAR
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
14 Mar 2022
26 Feb 2022
7 Mar 2022
26 Feb 2022
5 Mar 2022
26 Feb 2022
Amount
Demolishing 24nos Janta flats including foundation without land and filling the site with available excavated earth including dressing and levelling the surface, removal of material and cleaning the site complete in all respect with all leads and lifts on "as is where is basis" as per direction of Engineer-IN-Charge.(All C & D waste shall be disposed off as per NGT guidelines and as per direction of Engineer-IN-Charge.) including taking all the necessary safety precaution and taking expert suggestion by deploying structural Engineer for the safety of the adjacent building/flat. The unserviceable material shall be disposed off the approved MCD ground. MCD challan shall be brought by agency for disposal of malba and nothing extra shall be paid on this account. Conditions:- 1.The work shall be carried out in day time only. 2. The site shall be barricaded in all side for the safety of local residents as per latest guild lines issued by NGT. 3. The agency shall carry out demolition work by skilled labour and under the supervision of a Structural Engineer for the safety of adjacent flats, municipal road, water mains & electric over head lines/underground cable & to avoid any mis-happening. 4. The work shall be carried out with all safety and security of labour, supervising staff of agency and DDA staff. 5. Any incident/ casualty if occurred during the execution of the work shall be the sole responsibility of agency. 6. Demolition shall be carried out keeping in view the safety of staff of private surrounding properties. 7. The agency will be responsible for arranging and maintaining at his own cost all materials, tools & plants, water, electricity, transport facility for workers & all other services required for the execution of job work. 8. It is the responsibility of contractor to see the site before quoting his rate. 9. No explosives shall be used for demolition of building. 10. The agency shall carried out arrangements for noise and dust pollution control as per NGT directions.
Kuldeep Kumar
F D Enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .