Tender Value
₹14.7 L
EMD Value
₹1.2 L
Closing Date
31 Aug 2026, 3:00 pm3d left
Chief Engineer
Nagar Nigam Firozabad
Reconstruction work of the cremation ground in Ward No. 20, Krishna Nagar.
2026_DOLBU_1178365_14
10/Nirman/2026-27
Open Tender
Civil Works
Percentage
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
Municipal Corporation
₹1.2 L
22 Aug 2026
22 Aug 2026
31 Aug 2026
22 Aug 2026
31 Aug 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismatalling reinforced cement concrete or reinforced brick work including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). (PWD SOR 2022-23, chapter-17, Item No.4 Sec. No. 692). | 12.44 | cum | 1,000 | ₹12,440 |
| 2 | Cartage of malva from site up to 8km distance including loading & uploading, T&P etc. requried for proper of work as direction by Engineer-In-Charge. (PWD SOR 2022-23, Chepter-3, Item no. 213a) | 9.95 | cum | 230.1 | ₹2,289.5 |
| 3 | Excavation in foundation in ordinary soil or silt (loam, clay or sand) including lift upto 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or into plinth and removal and disposal of surplus earth as directed by thr Engineer in charge up to a distance of 30m from the foundation trenches.(PWD SOR 2025-26, chepter-4, Item No.01 Spec-251) | 64.52 | cum | 135 | ₹8,710.2 |
| 4 | Providing and laying cement concrete in 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 40mm nominal size) including supply of all materials, labour and T&P etc. required for completion of work and curing complete. including cost of form work in Foundation and floors. (PWD SOR 2022-23 Chapter No-05 Item No. 273 spec. No. 5.4.1. | 6.36 | cum | 4,200 | ₹26,712 |
| 5 | R.C.C work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No. 8 spec. No. 5.1) | 13.1 | cum | 8,000 | ₹1,04,800 |
| 6 | Reinforced cement concrete work in beams, lintels suspended floors, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth level upto floor five level, including the cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23, Chapter-5, Item No. 5.3) | 11.18 | cum | 8,900 | ₹99,502 |
| 7 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse Fine sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work) (PWD SOR 2022-23 Chapter No-06 Item No. 6.1) | 18.01 | Sqm | 5,050 | ₹90,950.5 |
| 8 | 12mm Cement plaster with cement mortar in
proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth (PWD SOR 2022-23 Chapter No-13 Item No. 13.4) | 171.99 | cum | 185 | ₹31,818.15 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23 chapter-5, Item No. 5.3) | 4.35 | cum | 8,900 | ₹38,715 |
| 10 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. .(As per Analysis) | 33.7 | QTL | 6,960 | ₹2,34,552 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.22 MB
BOQ_2214580.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].