Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC HOLDING NO 41 C O MIR AZAM KHAN KHAN RASJID MOHALLA JAMURIA BAZAR MAIN JAMURIA PASCHIM WEST BURDWAN WEST BENGAL INDIA 713336 | JAMURIA | PASCHIM BARDHAMAN | WEST BENGAL | 713336 | ₹1.4 Cr | L1 | Accepted-AOC As being L1 |
| 2 | L2₹1.5 CrRejected-Finance | ₹1.5 Cr | L2 | Rejected-Finance As being L2 |
| 3 | L3₹1.5 CrRejected-Finance | ₹1.5 Cr | L3 | Rejected-Finance As being L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected |
Tender Value
₹1.3 Cr
EMD Value
₹1.7 L
Closing Date
5 Jan 2026, 6:00 pmClosed
AREA SAFETY OFFICER, JHANJRA AREA
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Drift drivage from R V Seam to R IV Seam in sector C to win the R IV Coal Seam at MIC Unit of Jhanjra Project Colliery
2025_ECL_349888_1
ECL/GM/JNR/MIN.A/25-26/32 Dt. 22.12.2025
Open Tender
Miscellaneous Works
90 days
Jhanjra Project Colliery
PLEASE REFER TO TENDER DOCUMENTS
5 documents required · 5 mandatory
₹1.7 L
6 Apr 2026
23 Dec 2025
6 Jan 2026
23 Dec 2025
5 Jan 2026
24 Dec 2025
23 Dec 2025 - 31 Dec 2025
Job Description
Drivage by Drilling and Blasting of soft stone, dressing of Roof & sides, cleaning of blasted debris & disposal / stacking up to 15m for 04 nos Drift Throw = 13 m Gradient = 1 in 6 Dipping, Cross Section 1.8 x 3.8 sqm, (i)26.6 x 4.8 x 3.8= 485.18 x 02 = 970.36 cum (ii) 22.8 x 4.8 x 3.8/2 = 207.97 x02 = 415.88 cum, Gradient= 1 in 5, Dipping, Cross section 4.8 x 3.8 Sqm (i) 25.20x 4.8x 3.8 = 459.65x 02 = 919.30 cum (ii) 19.00 x 4.8 x 3.8/2 = 173.28 x 02 = 346.56 cum Total Stone Volume = 2652.10 cum
Drilling and Blasting of Shelley Coal, dressing of Roof & sides, cleaning of blasted debris & disposal / stacking up to 15m. (i) 22.8 x4.8x 3.8/2 = 207.94 x 02 = 415.88 cum (ii) 19.00 x 4.8 x 3.8/2 = 173.28 x 02 = 346.56 cum Total Shelley Coal volume = 762.44 cum
Roof Bolting / side Bolting, Wstrap, Wire netting, girder etc may be use for supporting if & when required including carrying of materials, Drilling, Grouting & Tightening of B/plates etc. (Including cost of drill rod & drill bits) = 187.2/1.2 = 156 rows x 4 no/mtr = 624 nos + 62(Side bolting) = 686 nos
Transporting of Electrical Equipment, drill panel, fan, circuit breaker etc = 18 man power ( UG Unskilled)
Average lead upto 75m for only Stone debris, Volume of loose = 2652.10 + 762.44 = 3414.54 cum x 1.3 = 4438.90/1.15 = 3860 Tubs
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.21 MB
Tendernotice_2.pdf
PDF • 0.72 MB
BOQ_362638.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid