Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | -8.20% | ₹1.4 L | L1 | Admitted-Finance |
| 2 | L2₹1.4 LAdmitted-Finance | -5.11% | ₹1.4 L | L2 | Admitted-Finance |
| 3 | L3₹1.5 LAdmitted-Finance | -0.10% | ₹1.5 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Treasury voucher mismatch |
Tender Value
₹1.5 L
EMD Value
₹2,960
Closing Date
5 Feb 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_301979_3
e-NIT 252 of REW Poonch 2025-26 Date 31-01-2026
Open Tender
Civil Works
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹2,960
7 Feb 2026
31 Jan 2026
6 Feb 2026
31 Jan 2026
5 Feb 2026
31 Jan 2026
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
Dry Stone pitching including cost of stone
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) with 30% stones
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Carriage of sand Agg. by 25 KM by MT & 500 Mtr. By H/L
Carriage of Stone 500 Mtr. By H/L
Add the Cost of CIB
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_979722.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid