Tender Value
₹1.2 Cr
EMD Value
₹2.9 L
Closing Date
24 Apr 2026, 4:00 pmClosed
Executive Engineer Construction Division Leh
Office of the Executive Engineer Construction Division Leh
Construction of link road to Shara Shachumik. (Under District plan)
2026_PWD_18723_1
CDL 05 of Leh of 2026-27
Open Tender
Civil Works - Roads
Percentage
60 days
leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Executive Engineer Construction Division Leh
₹2.9 L
11 May 2026
4 Apr 2026
25 Apr 2026
4 Apr 2026
24 Apr 2026
4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m, as directed by Engineer-in-charge.
a) All kinds of soil | - | Cum | 208.42 | - |
| 2 | b) Ordinary rock | - | Cum | 383.89 | - |
| 3 | c) Hard rock (Blasting Prohibited) | - | Cum | 1,095.42 | - |
| 4 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, inembankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m :
All kinds of soil | - | Cum | 453.81 | - |
| 5 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30 (Plant mix. Method) | - | Cum | 1,869.03 | - |
| 6 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of
Engineer-in-Charge. | - | Cum | 1,825.12 | - |
| 7 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions
of Engineer-in-Charge.
50 to 100 mm average compacted thickness with bitumen of grade VG-10 @3.50% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | - | Cum | 9,038.27 | - |
| 8 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom.
With rapid setting bitumen emulsion
a) On W.B.M / W.M.M. @ 0.4kg/sqm | - | Sqm | 52.3 | - |
| 9 | b) On bituminous surface @ 0.25kg/sqm | - | Sqm | 33.87 | - |
| 10 | 2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of
13.2 mm size and 11.2 mm size respectively per 100 sqm and 52 kg and 56 kg of
hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size
respectively, including a tack coat with hot straight run bitumen, including
consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to
be paid for separately).
With paving Asphalt grade VG - 10 heated and then mixed with solvent at the
rate of 70 grams per kg of asphalt | - | Sqm | 230.22 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.31 MB
BOQ_44804.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .