| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹69.9 LAdmitted-Finance | -25.99% | ₹69.9 L | L1 | Admitted-Finance |
| 2 | L2₹71.7 L+₹1.9 L (2.69%)Admitted-Finance | -24.00% | ₹71.7 L+₹1.9 L (2.69%) | L2 | Admitted-Finance |
| 3 | L3₹71.9 L+₹2.1 L (2.96%)Admitted-Finance HIMANSU SHEKHAR SWAIN ODISHA | -23.80% | ₹71.9 L+₹2.1 L (2.96%) | L3 | Admitted-Finance |
| 4 | L4₹73.6 L+₹3.8 L (5.39%)Admitted-Finance | -22.00% | ₹73.6 L+₹3.8 L (5.39%) | L4 | Admitted-Finance |
| 5 | L4₹73.6 L+₹3.8 L (5.39%)Admitted-Finance | -22.00% | ₹73.6 L+₹3.8 L (5.39%) | L4 | Admitted-Finance |
Tender Value
₹94.4 L
EMD Value
₹94,408
Closing Date
12 Mar 2026, 5:00 pmClosed
SE RW Division Deogarh
O/o the SE RW Division Deogarh
Building work
2026_CERWI_126910_1
SERWDGH-Online-20 of 2025-26
Open Tender
Civil Works - Buildings
Percentage
180 days
Deogarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹94,408
Yes
22 May 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
6 Mar 2026 - 11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation trenches and column foundation trenches and column foundation and pits in all kinds of soil within an initial lift of 1.5m. Including dressing the sides and leveling the bed and depositing the excavated materials away from the site within an initial lead of 50m including cost of all labour, sundries, tools and plants etc complete as per direction of the Engineer-in-charge as per approved specification. | - | - | - | - |
| 2 | Ground Floor | 313.55 | Cum | 206.06 | ₹64,610.11 |
| 3 | Filling foundation trenches and plinth with sand, well watered and compacted with appropriate mechanical compactor, top surface dressed and leveled to proper gradient including cost of all materials, labour, sundries, T&P ,all taxes, royalties, loading and unloading etc complete as per direction of the Engineer-in-charge as per approved specification. | - | - | - | - |
| 4 | Ground Floor | 194.65 | Cum | 1,752.95 | ₹3,41,211.72 |
| 5 | Providing filling foundation and plinth with sandy soil well watered and rammed within 5 km initial lead including rough dressing and levelling the bed including cost of all materials, labour, sundries, T&P ,all taxes, royalties, loading and unloading etc complete as per direction of the Engineer-in-charge as per approved specification. | - | - | - | - |
| 6 | Ground Floor | 103.47 | Cum | 1,688.55 | ₹1,74,714.27 |
| 7 | Providing and laying plain cement concrete 1:3:6 Nominal grade mix using portland slag cement in foundation and bottom layers of flooring and below pile cap etc. using 40 mm size downgraded hard crusher broken granite aggregate of approved quality from approved quarry including weigh-batching. Mixing in appropriate mechanical mixers, lowering, laying and compacting to proper level including curing and cost of all materials with all taxes and royalties loading and unloading conveyance, labour, sundries and T&P etc complete as per direction of the Engineer-in-charge as per approved specification, | - | - | - | - |
| 8 | Ground Floor | 74.59 | cum | 6,238.99 | ₹4,65,366.26 |
| 9 | Providing and laying plain cement concrete 1:2:4 Nominal grade mix using portland slag cement in foundation and bottom layers of flooring and below pile cap etc. using 12mm size downgraded hard crusher broken granite aggregate of approved quality from approved quarry including weigh-batching. Mixing in appropriate mechanical mixers, lowering, laying and compacting to proper level including curing and cost of all materials with all taxes and royalties loading and unloading conveyance, labour, sundries and T&P etc complete as per direction of the Engineer-in-charge as per approved specification. | - | - | - | - |
| 10 | Ground Floor | 4.92 | Cum | 7,790.81 | ₹38,330.79 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
Tendernotice_2.pdf
PDF • 1.31 MB
BOQ_584099.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .