Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹40.8 L
EMD Value
₹81,540
Closing Date
26 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GE (AF) Bagdogra
GE AF Bagdogra Bagdogra Airport PO, Dist Darjeeling, WB - 734421
As per NIT
2026_MES_797420_1
8746/E8
Open Tender
Civil Works
Item Rate
180 days
GE (AF) Bagdogra
PROVN OF COVERED SHED AT IOC GATE, AAI GATE AND MANDIR GATE AT AFS BAGDOGRA UNDER GE (AF) BAGDOGRA
10 documents required · 10 mandatory
₹500
GE (AF) Bagdogra
₹81,540
Yes
5 Nov 2026
5 Nov 2026
28 Nov 2026
5 Nov 2026
26 Nov 2026
19 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out soft/loose soil complete all as specified and directed. | 50 | Cum | - | - |
| 2 | M&L Plain cement concrete (1:4:8), type D-2, using 40mm graded stone aggregate as in foundation, filling and mass concrete, complete all as specified and directed. | 4 | Cum | - | - |
| 3 | M&L TMT bars 10 mm dia & over, cut to length, bent to shape required including cranking, bending, spirally hooping for columns, hooking ends and binding with and including steel wire (annealed) not less than 0.90mm dia., complete all as specified and directed. | 900 | Kg | - | - |
| 4 | M&L TMT Bar 6 to 8 mm dia stirrups ,cut to length, bent to shape required including cranking, bending spirally for hooping for columns, hooking ends and binding with asnd including steel wire (annealed) not less than 0.9 mm dia or securing with clips complete all as specified and directed. | 105 | Kg | - | - |
| 5 | M&L formwork to sides of concrete foundation ,footings bases of columns raft and raft beams ,side sand soffits (if any)of foundation and plinth beam and similar work rough finished surface of concrete complete all as specified and directed. | 22 | Sqm | - | - |
| 6 | M&L formwork to sides of pillar, post, strut, piers, column and stanchions and similar work rough finished surface of concrete complete all as specified and directed. | 12 | Sqm | - | - |
| 7 | M&L RCC (Nominal Mix) 1:2:4 type B1(20 mm graded aggregate as in foundations, including rafts, footings, foundation beams, plinth beams, bases for columns, etc basements slabs, under-reamed piles and mass concrete complete all as specified and directed. | 7 | Cum | - | - |
| 8 | M&L RCC (Nominal Mix) 1:2:4 type B1(20 mm graded aggregate as in columns, pillars, piers, posts and struts complete all as specified and directed. | 3 | Cum | - | - |
| 9 | M&L rolled mild steel roof trusses (framed), trussed, purlins, crane gantries, rails and fastenings and heavy bracket framing (Beam, tee, angle, channel or flat sections) including distance pieces, cleats etc. confirming to Fe 410 -W (Gde- E- 250) quality-A complete all as specified and directed. | 10,000 | Kg | - | - |
| 10 | M&L Steel plates (Plain or chequered square cut or notched ) ordinary or counter sunk)forming holes without any attachment confirming to Fe 410 -W (Gde- E- 250) quality-A complete all as specified and directed. | 1,000 | Kg | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tenderdocuments8746.pdf
Tender Documents • 1.44 MB
BOQ_894491.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .