Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹8.0 L+₹1.2 L (17.6%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹8.0 L+₹1.2 L (17.6%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.5 L
EMD Value
₹18,940
Closing Date
24 Aug 2026, 4:00 pmClosed
Executive Engieer RnB Division Kulgam
Executive Engieer RnB Division Kulgam
Construction of Culvert on Dardgund Tassar Road.
2026_PWDJK_320828_1
56/2026-27/RnB/Kul/5321-31 Dtd 13-08-2026
Open Tender
Civil Works
Percentage
30 days
Kulgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
No 0470010200000099
₹18,940
5 Sept 2026
13 Aug 2026
25 Aug 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 87.5 | Cum | 164.2 | ₹14,367.5 |
| 2 | Providing & Laying of stone Nalla boulders (dully hand packed)including dressing and ramming with all carriages loading un-loading and stacking etc complete | 4.68 | Cum | 762.71 | ₹3,569.48 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.12 | Cum | 4,561.36 | ₹14,231.44 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 33.01 | Cum | 6,828.04 | ₹2,25,393.6 |
| 5 | Centring and shuttering including proping, strutting & removal of the same up to plinth level: Foundations, footings, bases of columns etc for mass | 6 | Sqm | 251.03 | ₹1,506.18 |
| 5.01 | Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 75.6 | Sqm | 551.39 | ₹41,685.08 |
| 5.02 | Suspended floors, roofs, etc | 23.4 | Sqm | 629.64 | ₹14,733.58 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level:Thermo-Mechanically Treated bars of grade Fe-500D or more | 3,690.7 | Kg | 108.01 | ₹3,98,632.51 |
| 7 | Supply and Filling of RBM work incld. Compaction and carriage all complete | 70.38 | Cum | 762.71 | ₹53,679.53 |
| 8 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and
applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete Electric resistance or induction butt welded tubes | 180 | Kg | 118.64 | ₹21,355.2 |
stage.html
html • 0.02 MB
finance_1068025.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_1068025.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .