Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹81.8 CrAccepted-AOC SHOP NO 12 GOVARDHAN CHS LTD SALASAR BRIDGE BHUMI TEKRA ROAD NEAR FLYOVER BRIDGE BHAYANDAR WEST THANE 401101 | THANE | THANE | MAHARASHTRA | 401101 | 1 | Accepted-AOC Accepted | |
| 2 | 2₹86.0 Cr+₹4.2 Cr (5.15%)Rejected-Finance 701 HEADQUARTERS SANT DNYANESHWAR MARG CHETANA COLLEGE ADJUNCT BANDRA EAST MUMBAI 400051 | MUMBAI SUBURBAN | MAHARASHTRA | 400051 | 2 | Rejected-Finance as per Uploaded Report |
Tender Value
₹82.5 Cr
EMD Value
₹41.3 L
Closing Date
8 Oct 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
City Engineer
MBMC Head Office
Proposed Development Work of Chena River at Chena Village in Mira Bhaindar Muncipal Coporation (Phase 3) in Area. (Basic Facility Development Fund)
2024_MBMC_1087532_1
MBMC/PWD/Tender/70_03/24-25
Open Tender
Civil Works
Item Rate
910 days
MBMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,540
₹41.3 L
7 Jul 2025
23 Sept 2024
9 Oct 2024
23 Sept 2024
8 Oct 2024
23 Sept 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing rich mix cement concrete including stacking the spoil sa sdirected with all leads, lifts etc, complete. SSR 46.13 | 1,000 | CUM | - | - |
| 1.01 | Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including
shoring and strutting, dewatering as necessary and disposing off excavated stuff as
directed etc. complete. ( By Mechanical Means )
a) Upto 1.50m lift Normal Rate
b) 1.50m to 3.00m lift, Add 10%
c) 3.00m to 4.50m lift, Add 20%
d) 4.50m to 6.0m lift, Add 30%
SSR 12.03 | 15,037.71 | Cum | - | - |
| 1.02 | Excavation for foundation in hardrock by chiselling and wedging or line drilling including shoring and strutting, dewatering a snecessary and disposing off excavated stuff asd irected etc. complete SSR 12.11 | 39,513 | CUM | - | - |
| 1.03 | Excavation for foundation in soft rock including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30% | 1,969.58 | CUM | - | - |
| 1.04 | Excavation for foundation / pipe trenches in slush muddy / marshy / slushy / soil including use of poclain, labour for dewatering during execution including
removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, preparing the bed by cleaning the mud, labour required for execution for shuttering item but excluding backfilling, etc. complete. Providing and fixing shuttering shallbepaidseparately.MJP SSR | 19,560 | cum | - | - |
| 1.05 | Dewatering on BHP basis by using water pump including diversion of stream, providing coffer dams, earthern bunds etc. as may be necessary for foundation and other parts of the works and pumping out water during and after excavation as may be required by using 5.0 to 9.0 BHP pump etc. complete. (prior approval of Superint ending Engineer will be necessary). SSR 12.23 | 1,975 | Hour | - | - |
| 1.06 | Supplying hard murum/ kankar at the road site, including conveying and stacking
complete.SSR 2.29A | 45,300 | CUM | - | - |
| 1.07 | Compacting the hard murum side widths including laying in layers on each side with
vibratory roller including artificial watering etc. complete. SSR 2.32 | 15,100 | SQMT | - | - |
| 1.08 | Providing solingusing 80 mmsize trap metal in 15 cm. layer including filling
voids with Crushed sand/grit, ramming, watering etc. complete.) SSR 21.40 | 5,777.95 | Cum | - | - |
| 1.09 | Providing and laying in situ / ready mix / ready mix M15 cement concrete of trap / granite / quartzite / gneiss metal in foundation including necessary centering, formwork, bailing out water, compacting and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer / concrete batch mix plant (pan mixer) with natural /artifical sand)SSR 24.04 | 3,379.75 | Cum | - | - |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1898037.xls
BOQ • 0.38 MB
152796378.pdf
Tender Documents • 2.12 MB
152796380.html
Tender Documents • 0.05 MB
3.pdf
Tender Documents • 0.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .